175 points · by jaoued · 10y ago · 72 comments
I'm curious how much additional capacity this thing gets by using solar heat instead.
Also from Wikipedia: they have a contract to sell the power at 19¢/kWh. For reference, coal and wind in the U.S. sell for more like 3¢.
It's great to see the world embrace clean energy, but the money in this project seems nuts to me.
1) They're very leery of whatever's Russia up to, and much of their NatGas comes from there. Any alternative energy is good energy.
2) It shores up the economy in a relatively stable part of northern Africa that'd be a prime location for people wanting to immigrate to spain. More refugees are not a good plan.
3) It helps Europe to hit Carbon reduction targets without having to deal with the NIMBY population.
Or at least it was a strategic thing. Reading some more, European investors pulled out, and it's the Africa Development Bank now. Maybe the money is too nuts even with strategic goals in mind.
We're never going to succeed if we can't get the cost close to fossil fuels.
“They had a vision to promote renewables at a time when oil prices were high"
Guessing that's why Europe backed out.
Does this project count as "public procurement?" If so the chances of corruption would seem higher:
That is $24/W to $31/W. That is horrible. For cleaning the reflectors, it apparently uses 23 times as much water as a dry cooled coal power station.
It makes me sad to think that money and resources are being spent so inefficiently, in a country where the GDP per capita is $3k/year.
[1] https://en.wikipedia.org/wiki/Ouarzazate_solar_power_station
This portion of the plant comes in around $6/watt, still bad but not as bad as the headline number for the whole project.
Also the 4th stage of the plant will be PV.
http://www.pv-magazine.com/news/details/beitrag/morocco-inau...
Obviously dams are highly location dependent, and are somewhat on the shadier side of environmental impact. But 900 times the cost for half the power output is just crazy. Is there really no better way to get power into the country? Or is this just some publicity / money burning stunt?
Anyway, short answer, no it's not 900x for half the power. Power stations are generally measured in capacity, often without mentioning the capacity factor. e.g. you could build a damn that can produce 1000 MW of power, but it is not connected to a river and relies on pumped storage, and have only storage for 1 hour of generating. The net energy generation of that facility is actually negative, a small cost for energy storage. You can't compare that to another installation which actually generates energy for 10 hours a day. They're completely different yet both carry a power rating which is not meaningful for comparing them in the way you'd want to.
I've got no clue whether that's the case for the dam you're mentioning, just giving an example where comparisons can go wrong. I can guarantee it's not 900x for 0.5x though, what it is exactly I don't know but perhaps you can name me the dam.
(in other news, the Guardian article is pretty shitty because it barely specifies any of the variables itself, like say a capacity factor. Read it as a general announcement, not a tech spec.)
That having been said, it IS a relatively more expensive project regardless. But one mustn't forget it includes a storage solution, too.
Upon some digging I found that the Wanapum Dam in Washington (The one I was referencing) generates around 4 million MWh, or 4000 GWh per annum. Though the wiki is a little vague, not sure if that's max capacity or average. And looking on the Grant County website, it says that the dams construction cost was around $90 million, so a bit more than I previously stated.
On the other hand, the Quarzazate solar station will produce an expected 370 GWh per annum, according to the wiki. So, 10 times less power. Correct me if I'm wrong, but I think that the ratios still stay the same?
Edit: I was reading the wrong section of the wiki, phase 1 is 370 GWh. 2 and 3 add 1100 more. 1470 total.
That said, a $90M dam in the 1950s would be a lot more expensive today. Partly due to inflation, but also for extra effort to preserve river ecology, etc. that nobody cared too much about back then.
So a few comments to make to explain some of the difference.
1) Damns aren't generally comparable to other renewable projects in cost, because they're dependent on a natural resource that doesn't scale. i.e. a sizeable river and geography that can act as a natural reservoir for water. Hydro can't really scale, even in Canada, a gigantic country with a relatively tiny population and a relatively huge hydro industry, can't really find new hydro projects that make economic sense because they've exhausted the opportunities already.
Imagine instead of energy, you'd be looking for a source of drinkable water for your goats. You can either build a pipeline to a nearby source of fresh water, or you can build a desalination factory. Of course the former is cheaper. But you can hardly compare its cost to another region that has no fresh water, and needs to build a desalination factory, and then say 'the price difference is huge!'. It's expected to be, particularly for very old hydro projects, which are usually the hydro projects that were the lowest hanging fruit and the easiest to exploit (unlike e.g. today's potential hydro projects in Canada, which are 10x more expensive than some of the old ones from decades ago. That cost differential is not really a function of technology)
2) Even disregarding the above, $10 in 1959 is not $10 today. In fact, it's ±$80 today. In fact, the project cost roughly $765m in today's dollars. I mean hell, in 2014 there was a crack that cost $69m to repair alone, almost as much as building it you'd almost think :p Citing a $93m cost is unintentionally misleading.
3) So about 11 more expensive, not 900x.
4) You're now referencing the 370 Gwh per annum figure, but that's for only the first part of the project that has 160 MW of capacity (which has a significantly lower cost than the $9b figure you're using). The $9b project has a capacity of 580 MW, so roughly 1350 Gwh per annum, so about 2/3rds less, not 10x less.
So you're off by a LOT with some of the numbers. Regardless, the point still stands that this is an expensive project, but then I refer to point 1) which is that you can't compare them. A better comparison would be to look at what it'd cost to build a new dam in Morocco, and there's not really much potential there that hasn't already been exhausted by the existing hydro stations in Morocco. Hydro would definitely be a more expensive venture, for sure, as would wind and fossil. As expensive as this may be, it beats what they currently have, which is importing 95% of their fossil fuels, which is a financial huge burden on a country that doesn't have a hard currency.
The moment you read the quote “At around 2pm, the king will press a button, the parabolic mirrors will start turning, the heat will begin to turn the turbines and the plant will come to life,” - you have to wonder how much of this is a vanity project.
[1] http://www.amazon.com/Confessions-Economic-Hit-John-Perkins/...
I do know Morocco took our a precautionary loan, iirc with the IMF, in the past few years which was renewed not so long ago. But it was renewed because it was not exercised, it's more of a free loan option they had secured to protect against the very swings in fossil fuel prices that a project like this diminishes due to increased energy independence. Perhaps that's the loan you're referring to? In that case, note that Morocco didn't actually lend the money, it only secured the option to borrow in case shit hits the fan. (oil goes to $100, which is a disaster for Morocco, but no sign of that anytime soon).
The book I referenced above is by John Perkins who worked as a consultant for a company who would justify huge loans denominated in USD for power infrastructure to developing nations, but a significant majority of the work and materials would come from US companies. So the World Bank or the IMF would loan tonnes of money to someone in USD, much of it being transferred directly to companies in the US anyway, and leaving the nation with a large debt to service in a currency they do not issue (leaving them vulnerable to pressure from the US to export goods, for example, even though people require them locally, to liberalised trade agreements, or even to be allies in conflict etc. all sorts of sordid shit; the John Perkins stuff is well worth reading).
When governments take on large debts denominated in a currency they do not issue, it's always a cause for concern. That's why MMT academics were against the Euro[3], and why so many developing nations are now locked into crippling debt service that they cannot possibly keep up with.
Countries like the US, UK, Australia and Japan who only issue debt (ie. all currency or treasury securities) denominated in their own currency, have no risk of insolvency and no trouble servicing the debt[4] -- they can choose to stop paying interest any time they want and indeed the "debt" people refer to in those economies is really a "buffer stock" rather than a "bond market"[5]
When a nation that does not issue USD (ie. any nation other than the US) takes on USD denominated debt, with interest payments denominated in USD, they're up shit creek without a paddle.
[1] http://www.worldfinance.com/infrastructure-investment/projec...
[2] https://en.wikipedia.org/wiki/International_financial_instit...
[3] http://www.amazon.com/Eurozone-Dystopia-Groupthink-Denial-Gr...
[4] https://www.youtube.com/watch?v=i35uBVeNp6c
[5] https://www.youtube.com/watch?v=soVyyyXrcwo&index=6&list=PLo...
Anyway, it doesn't matter as indeed all of those could be dollar denominated. I don't know if they are. It's extremely common for, particularly in english/international reporting, numbers to be reported in dollar equivalents. Whether that's the actual denomination of the loan I don't know. I do know Morocco struggles deeply with hard currency scarcity, particularly in the realm of necessary energy imports every year, so they're well aware of the issues surrounding obligations in foreign currency denominations. There's a lot of fluff pieces on this project but sadly little deep insight in how it's all structured.
Thanks for the book reference. I'd not read it but I've been introduced to the issue in college classes many times, it features heavily in international political economy classes for example of which I took a few. I hope to find some time this semester to look into all the resources you linked me, thanks for that!
If you're a billionaire and want to be a trillionaire, all you'd have to do is buy every solar company and wait a few decades I bet.
That said, solar and wind power are a great way to get consistent (but low) returns on your investment. Look into "solar bonds".
Looking at the graph from the first link, what will likely happen is solar installations will grow rapidly to meet the trend line, which means high revenue growth.
Solar is also currently priced like it's dying, so there'd also be a price/earnings increase.
Past Performance Is No Guarantee Of Future Success.
IANAFA but I do hate to see "this will definitely make money because..."
It's: political connections, zoning, utilities, regulations, laws. Try putting up a huge solar farm without the right connections and insiders, don't grease the right wheels, see what happens. There's no bigger barrier to entry than that.
See: FirstSolar's benefit from being tied to the Walton clan (JWMA / True North Partners). FirstSolar is basically the world's largest independent solar company, is flush with cash, and very profitable. It's not a coincidence they've fared so much better than the rest of the industry.
"The Waltons own more than 112 million shares of First Solar, four times as much as the second-biggest shareholder"
http://www.thestreet.com/story/11491608/1/wal-marts-waltons-...
Plus you'd need unlimited capital for this plan. And current solar companies might go bankrupt before solar hits the scale needed to compete with fossil fuels.
And the DOJ would sue you for antitrust violations. Standard Oil did your plan. That sort of thing won't be allowed again.
Is water surprisingly abundant in this part of the Sahara?
Out of curiosity - what are the options outside of wet cooling?
But that needs a delta T between the hot water coming out of your cooling system and ambient temperature of probably about 40 K, which probably requires a bigger cooling system than otherwise. So you have the added investment cost of a bigger cooling system plus the bottoming cycle, but you've gained some more energy output. Is it worth it? Impossible to say without crunching the specific numbers. But my first guess is "no" in this case. It is usually worth it for gas fired powerplants though.
[1] Covered in https://en.m.wikipedia.org/wiki/Combined_cycle
This "worlds biggest" solar plant therefore isn't. It isn't yet biggest. It may never be biggest. It may be passed over by some other plant started tomorrow. Or it could stop expanding before ever reaching its designed size.