by timcash · 16y ago · 0 comments
Not really. If you need a bolt that absolutely needs to be able to withstand the rated forces at the specified size and weight, it needs to be non-destructively tested. The expensive part isn't the bolt, it's the testing.
You don't want it to be tested when it's the last bolt left in a redundant pair and it sheers off.
"Why would they say how many t1 lines are need and how many servers? That is silly. What if someone could get the same effect with less power and bandwidth?"
Because they did a needs analysis and calculated the probable amount of bandwidth, and decided that redundancy was necessary as well. This stuff isn't just a guess, it is based on hard data.