by timbre · 10y ago · 0 comments
FP / (FP + TN)
Where FP is number of false positives, and TN is number of true negatives. So it's a third option:
- Out of 1000 actually negative samples, 50 were tested as positive.
So in the case of 1000 samples, 949 correctly testing as negative, 50 incorrectly testing as positive, and 1 correctly testing as positive, the false positive rate is 50 / 999.
No comments yet.