by cechner · 10y ago · 0 comments
If youre working on a project where it is important that you have as-accurate-as-is-realistic an idea of the size of the project, or more specifically your progress through that project, then I can't see how a methodology could be any simpler.
If having a good idea of the size of your project over time and your progress through that project are not very important from a management perspective, the Scrum artefacts will seem like, and will probably in fact be, needless overhead.
Scrum is not opinionated about the actual development methodology so claims about how it affects the code that is written are themselves a bad smell IMO.
Scrum is actually part of the problem, IMO. I've seen many teams turn scrum into a hammer and treat all future problems as nails.
Example problem: The foobar story has failed failed for the third sprint in a row.
Likely discussed in retrospective (plausibly good ideas, mind you):
- We need to break down stories more before we estimate them.
- Or we need to stop underestimating foobar stories.
- Or we need to focus on unblocking subtasks related to foobar stories.
Probably unconsidered:
- The foobar code is a mess and needs to be refactored.
- Or the foobar subsystem is too coupled to the Fizzbuzz subsystem.
- Or the need for some developer tools to increase productivity in the foobar ecosystem.
Since scrum is methodology oriented, methodology is the first tool teams reach for when a problem is encountered. And I see this after team leads make it explicitly OK to discuss technical subjects in retrospectives.
I'm not a psychologist, so I can't describe why this phenomenon happens, but I see it regularly.
Pretty much every kind of deadline driven development ramps up technical debt. Scrum certainly isn't the worst in this respect (developers make their own deadlines, and conscientious ones will build the time in), but the emphasis on commitment and the pressure to deliver at the end of the sprint puts pressure on developers to cut corners.
The worst part though, is that the product owner is usually non-technical and will deprioritize stories to clean up technical debt as a result.
IMO for any kind of development methodology to work it must have an opinion on technical debt. Scrum doesn't.
One of the few defining characteristics of scrum is that the developers define how much they can achieve, and this estimation is improved over time. If this is not happening there is something else wrong with the culture and Scrum is being used as a scapegoat.
* The prediction is made in a meeting while your head is "out of the code".
* The prediction is made in a group setting, rendering the decisions more easily subject to peer pressure and groupthink.
* The prediction is made up to 2/4 weeks in advance of actually doing the work.
* The prediction is made without risk of overshoot attached. Risk is critical metric which scrum conceals.
And the main defining characteristic of scrum that leads to pressure, after all of that unwarranted optimism:
* The prediction is designated as a commitment.
Scrum is complex and not always possible to follow exactly, so this is to be expected but it makes me wonder, how many successful projects are out there that are following the true Scrum methodology?
My guess is that it's a few more than the classic waterfall but I still seem to see far more failure than success stories.
Regarding success stories, it might be that process doesn't play such a critical role as long as solid engineering techniques are used and the team is competent.
All those methodologies are for the less stellar programming teams, to get consistent results from those (also to a lesser degree to make good and bad programmers work well along each other). Because you can't always get the best programmers.
If Scrum would only work well with good programmers, it would be next to useless.
It remains to be seen if big Scrum engineering projects where Scrum is actually applied even exist. I can't even think about one on the top of my head. I'm not even sure Scrum is that well defined for us to be able to judge if is correctly applied or not. And it's yet another story to judge if they are successful or not.
In the end it does not matter much. The theoretical vision that nobody ever uses has almost no interest if you are concerned with real world efficiencies.
You are engaging in equivocation.
> Want to construct a bridge or a rocket, design a microprocessor? You are not going to do that with "stories".
Nor are you going to use the software development methodology described as the waterfall method (you may use a physical engineering methodology that was among the inspirations for that software development methodology, but those are distinctly different things, with different specific practices, and different domains.)
> I'm not even sure Scrum is that well defined for us to be able to judge if is correctly applied or not.
Scrum is exquisitely well-defined, both as to what it involves, what it specifically excludes, and what it is neutral to, in the Scrum Guide. (There's lots of confusion between Agile, a broad approach which is not a specific methodology, and Scrum, a very-specifically-defined -- though by itself fairly incomplete, in that any implementation of Scrum needs lots of decisions on the things to which Scrum is neutral -- methodology.)
Scrum origin is partly in manufacturing. Now there are some common points between some aspects of software dev and manufacturing, especially more so if the software being developed can be iterated very quickly (but very few if it's not the case), but at least in the real world (and maybe even in the theory) Scrum is what is also actually mainly used to interact with other stakeholders. And given how the communication is performed, and its content, that might be better than complete chaos when nobody is actually able to do the work they are supposed to do (PM being limited to having vague ideas, lack of a truly competent tech lead doing actual tech lead work, lack of vision by management, and so over) and only very vague general ideas of what should do the software -- or more generally the whole product -- are ever emitted.
As soon as "serious" stuff starts to be involved, you need real boring engineering, with functional analysis, requirement engineering, modeling, systematic testing or even partial proofs, etc. And you need to have it structuring communication between teams, and day to day work. And then, I don't expect Scrum or anything Agile in such a context adding any kind of value.
Now the theory of Agile and Scrum has evolved because of criticisms to a point where we are told that it actually do not cover the things that matter. That is bullshit retro-justification, now that the world is fucked up trying to make sense how to use that. Here is the Agile manifesto:
> We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:
> Individuals and interactions over processes and tools
> Working software over comprehensive documentation
> Customer collaboration over contract negotiation
> Responding to change over following a plan
> That is, while there is value in the items on the right, we value the items on the left more.
Engineering is mainly about "processes and tools", of course "individuals and interactions" are also needed, but there is no need to oppose them (although I am not sure what is the point of "individuals" here; the authors might as well said "oh and by the way be nice")
"comprehensive documentation" is critical in all kind of domains, and now that software is everywhere it just makes no sense to declare your "preference" of "working software" above "comprehensive documentation". It is, again, even dangerous to oppose them.
Customer collaboration over contract negotiation; again, highly dependent on the field and specific project if this is something where it makes sense to even have a "preference" or not.
"Following a plan" is what you do about how you organize your work when you use Scrum. There is no problem in studying the impact of a change any time if proper engineering practices are used. Obviously, the cost can vary depending on various factors.
My conclusion about Agile and Scrum, is that if you prefer all of that (4 Agile preferences, and the Scrum theater), you should seek projects that are suitable for the Agile preferences, and so poorly defined that Scrum is a plus. On my side, I'm just not seeking to work on chaotic projects -- on the contrary I try to bring logical and more systematic practice where I feel that chaos reigns -- and I'm neutral about Agile preferences, I prefer to choose projects on other criteria (mostly; intrinsical interest)
Regarding development: My main point is that Scrum leans towards agile methods such as XP (testing, CI etc), but it also sucks the time necessary to do those things well. The time Scrum takes off of the devs' working hours could much better be spent on those.
There's slightly more to it than that: it also encodes an assumption that you're working with a single fairly-tightly-integrated group (with synchronisation points at least daily). It's possible that this helps with estimation and scheduling -- it's a lot less clear that it helps get the best outcome in other respects.
There's also something of an uncertainty principle here -- more precision of estimation is possible, at the expense of increased expected timescales (partly due to padding, partly due to picking lower-risk approaches).
I personally think estimating projects is one of the most difficult things about this industry. Especially if we're talking about delivering many calendar-months worth of effort for a team , unless its just a variant on some other project[s] the team is well experienced at
More like wandering in the desert, hoping you find the promised land.
Been thru scrum master training 3 times, been on many "agile" teams. I've never heard this rationalization. Rather, a common justification for "agile" was you always have a working product. Which might be nice if things worked out that way.
Also, PMI style critical path worked just fine for figuring out that "straight line".
Scrum and "agile" democratized project management, empowering every poseur to claim expertise and ability. Whereas PMI required real effort to learn and master, Scrum flavored "self help" books can be flipped thru before you finish your coffee and then safely stored in plain sight on a book shelf, never to be touched again, allowing said poseur to claim the daily mutant chaotic dysfunctional mismanagement that they've always done is now "agile".
If you are objecting to defining the scope as small tasks and measuring your progress through that over time, then continually re-evaluating this scope as requirements change, then I think you are not working in an environment that would benefit from this kind of tool.
Its just a pragmatic set of guidelines, and objecting to it with such ridiculous vitriol makes you sound as foolish as the people I think you're objecting to.
"with such ridiculous vitriol"
Emperor, little boy, no clothes. It's thankless work.
In opposition, defenders of Scrum et al use the No True Scotsman's fallacy. Because those of us who have tried and failed are just morons.
Project management is risk mitigation. In my experience, most "agile" projects have been risk amplifiers. Ironic.