132 points · by kasiakrn · 10y ago · 124 comments
Football teams don't do standups saying "I will run X yards". Each and every player on the team
-knows precisely what the objective is
-knows precisely what his/her role is and is capable of fulfilling it
-knows what s/he needs to communicate to other teammates for them to fulfill their roles and does so promptly
-is capable of assessing what needs to be done next given the current situation on the field without having to be told and takes on that task on their own initiative
-doesn't have anyone breathing down their neck saying "A point must be scored by X:XX on the clock or else!" regardless of whether the tactical situation makes it possible
Together, such a team functions like a well-oiled machine. _That_ is what Agile is trying to teach. But more often than not, few, if any of the personnel or business conditions are met to make it possible and so it's a painful, miserable charade for all involved.
I have seen Agile work exactly once in my career; it's absolutely beautiful when it does.
I mean, look. We _know_ there is no single project management method that produces good results across the board. That is a fundamental result of undecidability (and related no free lunch theorems). There is no single method, there never has been, and there never will be. The teams that work well do so because they are good at what they do, they have a specific skillset for what they are working on at that time, they work well together and adapt to the circumstances, and frankly, are a bit lucky. That is a moment in time. Most, if not all, teams cannot reproduce that result consistently year after year, nevermind among different teams. It is a fleeting attribute, not a systemic byproduct of _process_, unless the field is so narrowed so far that optimization is in fact possible (which is exceedingly rare, and certainly doesn't manifest itself in general software development).
Agile is old enough that many people don't know what pre-Agile development was like. Often teams would pretend everything is fine until months after projects should have shipped. Pretending things are great while looking for a job or jumping projects was really common.
Even cargo cult Agile tends to make it clear things are going to fail ahead of time. Which is huge.
Sure, that does not mean the project is good or profitable, because on it's own it's a long way from enough. But, nobody cares about process when things are great, it's when things are failing and you want to get horribly broken to break even where even cargo cult Agile can help.
That's not true, Agile didn't save the software industry, it's just a different methodology with different ideas.
The "software crisis " still exists today the same as it did then, the only thing that's changed is young people who don't have the necessary perspective to understand that.
When you can say, "Let's tweak our process in this way for the next two sprints, and see if it works better than what we've been doing", that's agile.
But you're right, it's fragile. The reason it's fragile is because, as you go up the management tree, eventually agile runs into big-process management. And big-process management wants their reports so that "they know what is going on". Real agile looks sloppy, out of control, even though it delivers more value to the business faster than big-process development does. So real agile scares big-process management, and eventually gets killed by a layer of management that can't deal with it.
We did that in our company for about 3 years. Then some guy at the top decided (or maybe that's how he got misunderstood in the middle) what we are doing is not true agile, or whatever, and we are back at square one. So he basically decided to waste all the time we spent in retrospectives and all what we learned.
It's like when people say that true Christianity is about forgiveness and other values, which sounds great, until you run into some fundamentalist with the holy book.
I'm still very much in favor of these four values. But in and of themselves they require a lot of thought and analysis in a recursive feedback loop to be used properly.
What we have instead are mindlessly rigid processes for the sake of having a methodology and a huge track record of epic failures in Agile projects. It has become like a drug - people chase that initial high they will never, ever get back.
Alternative explanation: There are a lot of shitty teams out there. Agile requires a culture shift, not just adoption of a handful of practices from a book. From my limited experience, it works very, very well if, and only if the culture shift accompanies the process shift. If the process is the only thing that changes.. it's painful.
Agile process is pointless (and probably actively harmful) if people are so close minded they won't adopt the associated culture.
Honestly it is hard for me to understand or explain that, except by lack of education and understanding.
People need to understand what they are doing, how they are going to go about doing that and where they will get work, how it will be tracked etc.
Once you have those basic things in place, things just flow. Majority organizations, consultancies etc, they just do hand-waving and nothing more.
But then, the Agile Manifesto was all about "stop talking about this or that method being great and just do what works on your environment!!!"
That was the thing that worked everywhere, and all there is to it. Needless to say that Scrum, or any other named process does not fit it.
Everybody meant well, and everybody was very smart. In retrospect, though, I think the big mistake we made was thinking that if our hazy principles (as expressed in the manifesto) collided with typical American managerialist business culture, our principles would win out.
In practice, we ended up with what I think of as "mini-Waterfall with Agile labels". Release cadence is faster than with traditional Waterfall. But it is still generally a top-down, push-oriented, document-heavy system. Line workers still seem just as miserable and disempowered as before.
I personally have used Kent Beck and Mary Poppendieck's work to create some extraordinary teams and some great working environments. So I think the principles and the original insights have deep merit. But I recognize little of that in the typical "Agile" environment.
I myself have never seen Agile work well, not even close. I saw plenty of make-believe and head-in-the-sand and as mentioned in earlier comments, insane amounts of cargo culting.
I really like the way Dave Thomas put it: https://pragdave.me/blog/2014/03/04/time-to-kill-agile/
He also made a talk about it: https://www.youtube.com/watch?v=a-BOSpxYJ9M
These days this is the only methodology I follow and it works wonders, anything more I feel is just noise. At the end of the day nothing replaces actual engineering and understanding what you're doing.
For example, I think a focus on quality is necessary to enable real agility, so I'd look for unit tests, acceptance tests, continuous integration, continuous deployment, pair programming (or fast-cycle code reviews).
And for looking at results, I look for things that are hard to fake, like release cadence, amount of work in process, and unit of work size. So I'll ask, "When was your last release? And how about the release before that?" And I'll want the difference to be small. (My favorite place to work released multiple times a day.) I'll ask other questions like, "What are you working on? Who's working on that? When did that start?"
Another thing I'll measure teams by is the extent to which they're focused on problems vs features. Good teams ship things that solve problems (and make sure that they actually do). Bad teams ship features because that's what the spec says or what the boss wants.
Agile helped. Many programmers appear to find unions distasteful, so they needed some other way to try to protect their jobs from outsourcing. Agile claims "face-to-face" is most efficient.
But if the team is a "black box" with their only contact with the rest of the firm being mediated by the Product Owner, then that team could be anywhere. I always saw Agile as a sly trick to make outsourcing easier by packaging the team into a self-contained unit.
Mistaking a meta-methodology for a methodology is a major category error. It pretty much guarantees failure.
I'm at least reasonably agile. Looking back over the last five years, someone who thinks Agile is a methodology would think I'm very inconsistent and all over the map, because my methodologies keep changing. But that's because my needs, responsibilities, task types, and indeed even customer type have shifted over that time. What would be weird is if I did the exact same thing the whole time, because "Agile".
It wouldn't just be weird; it would be very bad.
I like your definition of it as a meta-methodology. I think 90% of the blogs I read about Agile completely miss this -- even those, like this one, that rail against Cargo Cult Agile.
I think what people get so messed up about is the mix of discipline and performance. If your team decides that in your situation you need daily standups and burndown charts? Then you got stuff to rigorously do every day. You make your own rules, sure, but whatever they are, they're meaningless unless you have the discipline to stick with them.
Some folks naturally want to focus on the "make your own rules" part. Some folks naturally want to focus on the discipline part. But focusing on either is a terrible mistake. They're equally important. (Insert long discussion here a bout Shu Ha Ri)
The Project Manager was completely on point with gathering information from stakeholders and direction from executives. The scrum master was a perfect neutral voice who really did an amazing job mediating. Our team was full of smart, capable, focused multidisciplinary engineers. It was absolutely beautiful.
I've also never ever seen it again. I've been trying to figure out what was different about that org than everywhere else. Because I've always worked with smart, social SWEs.
I think the problems arising from cargo cult agile are more fundamental than the methodology. In order for agile to work well for SWEs, the organization's infrastructure and expectations must be a fit. There are key things that I saw at the place where it worked and were missing everywhere else.
* Strong product ownership. The PM is the captain of the ship. They must interface with the execs, with the customers, with the technologists, with the customer service. They must synthesize the stories and effectively outline clear exit criteria for them. And they must accept input from engineering to prioritize tasks that must be done but do not necessarily directly provide customer value. But the buck stops with them. Engineering should not be subject to department infighting for prioritization of pet features. The direction must be clear, or you're foundering.
* A neutral voice in the planning meetings to keep things on track and ensure everyone who has a question / input is heard.
* Demo days. It's so important for the morale of everyone - on the team and off - for the exposition of the completed work for a given sprint.
* Respectful retrospection.
* Trust and verification. Micro management is toxic. The only time other than sprint planning that the PM should be involved with the daily work of engineers is when a story requirement needs clarification.
And modifying the scope of an in progress sprint should be relegated _only_ to emergencies. This cannot happen if there are _always_ emergencies, though. Which is why it's important for a PM to understand and allocate time for maintenance / infrastructure improvement.
1. The football team that has the knowledge and judgment you described are all A-players. A-players tend to not need a lot of process. One of the reasons we have project management and software methodologies and all that process is to help the team's B- and C- players perform predictably and consistently, if not close to as good as the A-players. If you actually found that mythical group of software people where each and every one of them knew the business in as much depth as your football players do, then yes, they probably wouldn't need as much structure. My experience has been these teams are extremely rare.
2. A football game is physically observable at all times by all stakeholders. Status needs no reporting. The score is known to all. The position of the ball is known to all. This is not true for software projects. Part of project management is providing visibility to stakeholders and leadership so that risk can be managed and informed strategic decisions can be made. This is why "Agile" emphasizes delivering working software as milestones. Different project management schemes use different methods to track and report status, but the end goal is the same.
3. A football game is already time boxed due to the structure of the game. There is a start time and a duration, it's separated into quarters, team activities are structured into downs, which aids the team in making tactical and strategic decisions. How would all these smart players "know precisely what to do" if they didn't know what quarter it was or how much time was left on the clock? Software does not naturally have any of this structure, so various methodologies seek to frame project with structure to aid decision making.
4. You really don't think any football team's leadership ever yells "We gotta get at least 10 more by halftime go make it happen!" You have to have intermediate milestones. Every sport I've ever played has had a coach or lead player barking the current goals at me. Guess what: That's part of the machine's oil.
1. I only like to work with A players as well. Only hire A players. If you have B and C players, let them go and keep looking.
2. Yes, working software is observable to all. When you have working software, everybody knows what the score is and where the ball is. If you software sux, the ball is in the wrong end of the field.
3. Many software projects have the same time constraint. A conference it needs to be ready by, or a point in time where there is no money left.
4. Yeah, thats the job of the team lead.
5. Football is a zero-sum PvP game, programming is a PvE race-the-clock game. In football, you don't have to be good, you just have to be not worse than other team (+/- luck factor). In programming, you have random obstacles (requirements, management decisions) thrown at you, the effort it takes to scale those obstacles is mostly unpredictable, and you're being pushed to do it before deadline "or else".
6. Timescale. American football match takes an hour (1.5 hour for soccer, + break). That's how much time the team works together until the next deliverable. In programming, it's weeks or months. Sustaining teamwork on such a long scale is a completely different task. If you want to compare something to football, look at hackatons - and then you'll see people who worked together before often excel at getting things done.
I also like Agile when it works, but I'm of the opinion that not following it is a symptom and not a disease. If you're fortunate enough to be on a team of people who know precisely what their role is and how to fulfill it, they'll tend toward Agile by virtue of being able to work quickly and having time to help each other. If you're not that fortunate, then it no longer becomes feasible to divide the work into semi-predictable chunks. The problem is in thinking that Agile is a suitable substitute for skill coverage in a team.
I've also been viewed as a trouble maker if I email the development team and ask them to read this:
and that is because this line so often goes against what the management team believes:
"[We favor] Individuals and interactions over processes and tools"
I'm fixing a project now where the PM is throwing a list of thousands of tasks at me to show me how much work is done, but haven't delivered anything and cannot commit to ever delivering anything.
Because most american people I know in football, know their EXACT role. Mr. Offensive lineman - I smash whoever is in front of me. If the play is to the left, I smash left. If the play is to the right, I smash right. They know nothing about defense. They know nothing about receiver routes. They don't care. They stand up and smash people.
The QUARTERBACK knows a bunch. But he also has a headset on, with 3 people feeding him tips for each play. It would be like a PM coming by every 5 minutes and telling you that you should use a Dictionary to store the current data, and then on the next problem you should maybe look into an ArrayList.
Basically.. football is a terrible analogy to software development.
Perhaps you got downvoted because you resorted to the "Do you have" trope to insinuate that the other person is ignorant. This is a variant of "Did you even read the article", a form of incivility we specifically ask people to avoid here: https://news.ycombinator.com/newsguidelines.html. We also ask people not to use uppercase for emphasis. If you edited those things out of your comment it would be much better.
Receivers have to be on the same page as the qb as to what is getting done and how they'll adjust based on coverage.
Running backs usually don't have to do a lot of thinking, they're more reactive, initial responsibilities and steps set but changes quickly as the play develops.
Thats not to say anything about the above except that FB is in many ways the most "team" of team sports with vastly different body types, roles and responsibilities at play. If you can't make an analogy related to business work within a gridiron (american) football context, you probably can't make it work :)
The comment you're replying to says this specifically.
> Mr. Offensive lineman - I smash whoever is in front of me. If the play is to the left, I smash left.
This is an oversimplification and if this is all the offensive lineman does, he'll be rapidly out of a job. The linemen are constantly adjusting to deal with the defense. They'll hold to avoid a big sack. They'll leap on the ball when there's a fumble. They'll block someone else if needed. It's not smash left and done.
> It would be like a PM coming by every 5 minutes and telling you that you should use a Dictionary to store the current data, and then on the next problem you should maybe look into an ArrayList.
I think it would be a lot more like management saying "we need you to build product X" and then expecting the QB to deliver. The QB isn't just running plays by rote.
That's a very oversimplification of american football. For a basic example even the "dumb" offensive lineman has to play differently whether it's a run or a pass. A more complicated play like a screen will require a lot of coordination with his other teammates to perform correctly. American football is actually a pretty good analogy for a the typical development team and the different roles an offense has. You have people in the trenches, people doing flashy stuff and a field general trying to tie it all together.
His analogy is limited (as all analogies are, at some level), but it works for its intended purpose, IMO.
Like a leaky bucket.
Edit: Some analogies are nearly perfect. Maybe he just needs to find a better one.
I've not been a part of but I've heard of horrors like SAFe. I've seen the diagrams [0] and I can't believe someone was sold on that.
I guess BigCorp needs to use something as a software delivery methodology. If they don't use Agile what else would they use?
the diagram is an eye candy for a mid-level executive. Upon seeing it, they start dripping saliva and become weak in the knees. The diagram has Lean, Agile and while it is missing the word Scrum it obviously is depicted there too. I've been through couple of years of the process looking extremely similar to that diagram (though word "SAFe" wasn't there) implemented across whole R&D (only super important projects got exception) of a pretty BigCo. Well, it was beyond horror. The product development was basically stalled completely. The gears were churning with lightning speed, people were constantly overworked, rushing to meet multitude of deadlines, .... all that while product just wasn't moving forward. No meaningful features could be delivered. It is hard to believe until you see it with your own eyes.
Then, one nice morning, all the mentioning of it just disappeared, like it never happened, and we're back to happily cranking out according to current release plans with weekly team meetings.
I've been in so many meeting where a manager tried to espouse the benefits of "being agile": Faster releases, tracking work more accurately, ability for constant review.
But I've never been in a meeting where somebody tries to talk about the benefits to developers: Your goals can't change day to day, your boss doesn't get to strictly tell you what to do or how to do it, and no more arbitrary deadlines!
You really have to listen to how somebody is selling a process to understand their interpretation of it.
And reiterate on those rules.
We implemented Scrum at the company I work for. It could have just as easily been any other sort of development methodology---Kanban was under consideration for less structure, for example. What we were looking for was something that works for us, and that would get us out of the huge mess that we were in. Scrum addressed many of the issues (especially management) we were having, so we figured we'll give it a shot and slowly start implementing it.
We don't stick to the books. The core concepts of Scrum are implemented, but are guiding. We constantly iterate on the process itself---every sprint we review how we did, identify problems, and put something in each sprint to improve upon them. We introduce concepts gently. If we find that something doesn't work, it gets adjusted or replaced. If it works, we apply it even more stringently. If making it more stringent introduces problems, relax it.
We do nothing because we "have" to under Scrum. Everything we do is analyzed, rationalized, and adjusted. And it has been wonderful---it saved a department that was falling apart. Are there problems? Sure. But we've identified them, and they're being addressed.
Concepts like TDD and pair programming---those aren't things that can be forced. The team needs to be on board, and if it's not working, then changes need to be made to hear and address their concerns, or get them to understand why we do things the way that we do.
At a higher management level, how projects were managed couldn't be forced. It was a gradual change, and it took a couple years to completely change how the entire company approached projects.
A snake oil - be it agile or communism - is easy to identify by the fervency with which its peddlers preach no true Scotsman.
It doesn't cause more of them, it makes them fail.
> In general dependencies can be minimized by organizing around feature teams instead of component teams.
You can't include common core upstream components into downstream branching features. Basic topology of a tree. Until of course you just have only one team doing the whole project.
Even when components with a dependency between them are in the same team the dependency still exists and agile makes it much more harder to handle. Until i guess it is one person doing both components - that by transitive closure would mean one person doing all the project himself (until the project component graph contains disconnected islands)
For all its problems, the one thing I've found it works well for is cutting down on technical debt. Developers get requirements up front, and documentation can be planned out alongside development. You do need skilled business analysts/project managers for it to work well, but it definitely cuts down on the sprawling mess I've seen in Agile. I'm sure Agile can work well, but from my limited experience too much emphasis is placed on moving fast, resulting in considerable technical debt (not a problem if a codebase is small enough that a team can entertain the idea of a rewrite, but it's disastrous for large codebases).
I haven't. I feel like the simple waterfall model is too rigid, but one of the modified versions would work well.
I am trying to design more of my code upfront these days, and spend less time coding directionlessly. Trying to become more prolific. Waterfall seems to encourage that.
I think most people prefer kanban or scrum over traditional PM style management.
However they have failed deliver on all promises.
When people complain about agile, they aren't harken back to traditional pms
I am not against some shuffling of responsibility. But ideally, you should know why you do it and best if it's backed up by some studies. You can't do a study if there is no way of comparison.
It's not just people though, it's also stories, sprints, iterations, epics,... you name it. Also, everything that came before was retroactively (and derogatorily) renamed "waterfall", despite the fact that many of the advantages of agile were actively discussed since 1960s.
And, yes, I believe well managed project can be better than agile, at least in some cases. We have Agile in our organization, ostensibly, but in effect it's lot more paperwork than it ever was under so-called waterfall. At least that is my experience, of course some other people can have different one. Maybe you just didn't get in the contact with the right snake-oil salesmen - good for you!
But, what I think is crucial, is (at least for someone) to know the history. So if the scrum master is to successfully improve the process, he should have a clue about project management and what was tried with what result. Otherwise he will just rediscover Brooks (Fred, although Mel is probably also a possibility). And that's why it's bad to say things like you are saying, that scrum master is not project manager, because then you will get people who really have no clue.
After that, I checked implementations that are available online. Every single one was implemented as a single class, including the ones implemented by Microsoft, Oracle, etc. And why not? It does not make much sense to break down this structure further.
But these best practises have taken on a life of their own.
So this is entirely correct: it's an attitude, not a tick box procedure.
Also, you can't Taylorise clue. http://reddragdiva.dreamwidth.org/594955.html
In the end, it's still experience and judgement that counts.
2. Everything you need to know about agile software development is on the c2 wiki.
3. Navel gazing is not Agile.
Can someone explain how this has anything to do with either administration work or building a physical appliance to sell to a customer who will be using it offline? Because while both have user stories, both are things that require you to not use the agile methodology.
When you're doing system/network/database/etc administration, you have a specific request or task to accomplish. But there is no iteration. There is no, let's do a little work and see how it evolves. If you're practiced, you know exactly what to do and how long it takes. So you just do it. Spending time updating boards and stories and tasks is a complete waste. Yet I've seen Agile shoved down the throats of teams who used to simply get shit done as fast as they could, and now go through some mandatory red tape to justify what they've been doing on short staff and no time for years.
When you have to sell someone a physical product, I just can't see Agile being very useful, mainly because of the iteration aspect. Yes, you could go through all the motions and provide full features over time and watch them grow with agile, but there's very few times I've seen a product designed from the beginning reach its target goals with any sort of a redesign. In my experience, what I have seen is the Agile method wasting everyone else's time, eventually requiring a redesign.
Story time: A meniacal team lead who's trying to make a name for himself in the company sees a way to save the company tens of millions by spending only one or two million on a product. But first we need to customize the product to work for our specific needs, which means writing middleware and customizing the interfaces to give our teams what they need to use the product. Basically, turn a kit car into an actual Ferrari with the 12 cylinder engine and everything. We take six months and actually mostly accomplish it - and then the maniac decides it's time for an upgrade, while teams are trying to learn how to drive this thing. The upgrade requires massive changes, but of course we're Agile, so we iterate and iterate until the Ferrari is now a Lamborghini. It's now been a year, and we're back where we were six months ago, only with a different looking car. Only one team managed to drive the Chimera in that time.
The fallacy of iterating on user stories is that the user knows what they want, the product lead knows how to get there without it becoming obsolete, and the developers will magically replace whole systems by iterating over features that they already know will not be changing before the product is done.
Personally, I think anyone could come up with any methodology at all and they would have exactly the same success as with any other methodology. The only thing that makes it all work are teams who get their shit done and have the bigger picture in mind, and help each other. But you don't even need a methodology at that point.
Agile just seems like so many pie charts for managers, and a buzzword to repeat to gain relevance.