515 points · by chenster · 9y ago · 253 comments
The Pixar animation system at the time was written in K&R C and one of my tasks was to migrate it to ANSI C. As I did that I learned that there were aspects of this code that felt like a school assignment that had escaped from the lab. While searching for a bug, I noticed that the write() call that saved the animation data for a shot wasn't checked for errors. This seemed like a bad idea, since at the time the animation workstations were SGI systems with relatively small SCSI disks that could fill up easily. When this happened, the animation system usually would crash and work would be lost. So, I added an error check, and also code that would save the animation data to an NFS volume if the write to the local disk failed. Finally, it printed a message assuring the animator that her files were safe and it emailed a support address so they could come help. The animators loved it! I had left Pixar by the time the big crunch came in 1999 to remake TS2 in just 9 months, so I didn't see that madness first hand. But I'd like to think that TS2 is just a little, tiny bit prettier thanks to my emergency backup code that kept the animators and lighting TDs from having to redo shots they barely had time to do right the first time.
The point is that one would like to think that a place like Pixar is a model of Software Engineering Excellence, but the truth is more complex. Under the pressures of Production deadlines, sometime you just have to get it to work and hope you can clean it up later. I see the same things at NASA, where, for the most part, only Flight Software gets the full on Software Engineering treatment.
We do penetration tests for a wide range of clients across many industries. I would say that the bigger the company, the more childish flaws we find. For sure the complexity, scale, and multiple systems do not help towards having a good security posture , but never assume that because you are auditing a SWIFT backend you will not find anything that can lead to direct compromise.
Maybe not surprisingly, most startups that we work with have a better security posture than F500 companies. They tend to use the latest frameworks that do a good job of protecting against the standard issues, and their relatively small attack landscape doesn't leave you with much to play.
Of course there are exceptions.
It makes one start to contemplate how little we really understand about software and how nascent the field really is. We're basically stacking rocks in a modern age where other engineering disciplines are building half-km tall buildings and mile-spanning bridges.
Fast forward 2500 years and the software building techniques of the future must be as unrecognizable to us as rocket ships are to people who build mud huts.
The scale is immense, so everything is built in multiple layers, each flawed and built upon a flawed foundation, each constantly changing, and we wouldn't achieve the heights we do if perfection, rather than satisfaction, was the goal.
Perhaps at some point the ground will stop shifting.
Doubtful. Machines will build the ground instead, and what they build on top of it will be incomprehensible to us; at least we'll get to observe in awe.
I disagree. I mean, I agree those things happen, but the system administrator's job is to anticipate those Real World risks and manage them with tools like quality assurance, redundancy, plain old focus and effort, and many others.
The fundamental of backups is to test restoring them, which would have caught the problem described. It's so basic that it's a well-known rookie error and a source of jokes like, 'My backup was perfect; it was the restore that failed.' What is a backup that can't be restored?
Also, in managing those Real World risks, the system administrator has to prioritize the value of data. The company's internal newsletter gets one level of care, HR and payroll another. The company's most valuable asset and work product, worth hundreds of millions of dollars? A personal mission, no mistakes are permitted; check and recheck, hire someone from the outside, create redundant systems, etc. It's also a failure of the CIO, who should have been absolutely sure of the data's safety even if he/she had to personally test the restore, and the CEO too.
There are lots of companies doing very well in this industry with targeted data management solutions to help alleviate these problems (I'm not sure that IT 'solutions' exist), however these backups aren't your typical database and document dumps. In today's UHD/HDR space you are looking at potentially petabytes of data for a single production - solely getting the data to tape for archive is a full time job for many in the industry, let alone administration of the systems themselves, which often need overhauling and reconfiguring between projects.
Please don't take this as me trying to detract from your post in any way - I agree with you on a great number of points, and we should all strive for ideals in day to day operations as it makes all our respective industries better. As a fairly crude analogy however, the tactician's view of the battlefield is often very different to that of the man in the trenches, and I've been on both sides of the coin. The film and TV space is incredibly dynamic, both in terms of hardware and software evolution, to the point where standardization is having a very hard time keeping up. It's this dynamism which keeps me coming back to work every day, but also contributes quite significantly to my rapidly receding hairline!
You seem to have direct experience in that particular industry, but I disagree that I'm being "idealistic" (often used as a condescending pejorative by people who want to lower standards). I'm managing the risk based on the value of the asset, the risk to it, and the cost of protecting it. In this case, given the extremely high value of the asset, the cost and difficulty of verifying the backup appears worthwhile. The internal company newsletter in my example above is not worth much cost.
> solely getting the data to tape for archive is a full time job for many in the industry, let alone administration of the systems themselves, which often need overhauling and reconfiguring between projects.
Why not hire more personnel? $100K/yr seems like cheap insurance for this asset.
> restoring, hashing and verifying files during production schedules is akin to painting the forth bridge - only the bridge has doubled in size by the time you get half way through, and the river keeps rising...
> you are looking at potentially petabytes of data for a single production
I agree that not all situations allow you to perform a full restore as a test; Amazon, for example, probably can't test a complete restore of all systems. But I'm not talking about this level of safety for all systems; Amazon may test its most valuable, core asset, and regardless there are other ways to verify backups. In this case it seems like they could restore the data, based on the little I know. If the verification is days behind live data or doesn't test every backup, that's no reason to omit it; it still verifies the system, provides feedback on bugs, and reduces the maximum dataloss to a shorter period than infinity.
Because sure, it's basic. To someone who knows that it's basic.
As the linked article states, they restored the backup seemingly sucessfully, and it took two days of normal work until someone noticed that the restored backup is actually not complete. How would you notice that in backup testing that (presumably) shouldn't take thousands of man-hours to do?
Speaking specifically, based on what you describe (neither of us is fully informed, of course), the solutions are easy and cheap: Verify the number of bytes restored, the numbers of files and directories restored, and verify checksums (or something similar) for individual files.
"Backups aren't backups until they've been tested."
They really are Schrödinger's backups until a test restore takes place. This is one area where people cut corners a lot because no one cares about backups until they need them. But it's worth the effort to do them right, including occasional, scheduled manual testing. If you can't restore the data/system you're going to be the one working insane hours to get things working when a failure occurs.
And then there's the aftermath. Unless you are lucky enough to work for a blame free organization major data loss in a critical app due to a failure of the backup system (or lack thereof) could be a resume generating event. If you're ordered to prioritize other things over backups make sure you get that in writing. Backups are something everyone agrees is "critical" but no one wants to invest time in.
from a brief stint in the gfx industry, you are correct.
Pixar isn't a model of software excellence, it's a model of process and (ugh) culture excellence.
But I mean, the other co-founder was Ed Catmull, so it's not like the company is short on innovation.
[1] https://www.bloomberg.com/graphics/2015-elon-musk-spacex/
There are other anecdotes online about this catastrophic data loss and backup failure but I think it was, funny enough, the propensity for some end users of Perforce to mirror the entire repository that saved their bacon. I say funny because this is something a Perforce administrator will generally bark at you about since your sync of this enormous monolithic repo would be accompanied by an associated server side process that would run as long as your sync took to finish and thanks to some weird quirks of the Perforce SCM long running processes were bad and would/(could?) fuck up everyone else's day. In fact I think a recommendation from Pixar was to automatically kill long running processes server side and encourage smaller workspaces. Anyway, I digress. They were able to piece it together using local copies from certain workstations that contained all or most of the repo. Bad practices ended up saving the day.
Was that menv? I've heard stories that Pixar builds these crazy custom apps that rival things like 3D Studio and Maya but that never leave their campus!
I think this might be due to timing. I saw TS when it first came to premium cable. Then I fell way behind on animated films. In 2012 I went on a binge to catch up, and re-watched TS, then saw TS2 for the first time a week later, then TS3 for the first time a week after that.
So for me I was watching TS3 while TS and TS2 were still fresh. Most people were seeing TS3 after a long gap so they may have forgotten details of TS2, and that gap also helped TS3 get a huge nostalgia factor. TS2 was fresh in my mind, and I had no nostalgia.
I'm not sure if I'd put TS or TS2 on top. TS had more novelty, but TS2 explored more weighty themes and had deeper emotional content.
Commitment would be very different if people were being asked to help while some heads were rolling. Because you're a real team when everybody is going in the same direction. Any call on "people, work hard do recover while we're after the moron who deleted everything" wouldn't have done it.
You just commit to something when you know that you won't be under the fire if you do something wrong without knowing it.
I think that employees actually makes less mistakes and are more productive if they don't have be worried about being fired for making a mistake.
> A young executive had made some bad decisions that cost the company several million dollars. He was summoned to Watson’s office, fully expecting to be dismissed. As he entered the office, the young executive said, “I suppose after that set of mistakes you will want to fire me.” Watson was said to have replied,
> “Not at all, young man, we have just spent a couple of million dollars educating you.” [1]
All depends on how leadership views employee growth
[1] http://the-happy-manager.com/articles/characteristic-of-lead...
I did fire an employee who deleted the entire CVS repository.
Actually, as you say, I didn't fire him for deleting the repo. I fired him the second time he deleted the entire repo.
However there's a silver lining: this is what led us (actually Ian Taylor IIRC) to write the CVS remote protocol (client / server source control). before that it was all over NFS, though the perp in question had actually logged into the machine and done rm -rf on it directly(!).
(Nowadays we have better approaches than CVS but this was the mid 90s)
With NFS Version 3, aka NeFS, instead using rlogin to rm -rf on the server, the perp could have sent a PostScript program to the server that runs in the kernel, to rapidly and efficiently delete the entire CVS tree without requiring any network traffic or even any context switches! ;)
http://www.donhopkins.com/home/nfs3_0.pdf
The Network Extensible File System protocol(NeFS) provides transparent remote access to shared file systems over networks. The NeFS protocol is designed to be machine, operating system, network architecture, and transport protocol independent. This document is the draft specification for the protocol. It will remain in draft form during a period of public review. Italicized comments in the document are intended to present the rationale behind elements of the design and to raise questions where there are doubts. Comments and suggestions on this draft specification are most welcome.
The Network File System The Network File System (NFS™* ) has become a de facto standard distributed file system. Since it was first made generally available in 1985 it has been licensed by more than 120 companies. If the NFS protocol has been so successful why does there need to be NeFS ? Because the NFS protocol has deficiencies and limitations that become more apparent and troublesome as it grows older.
1. Size limitations.
The NFS version 2 protocol limits filehandles to 32 bytes, file sizes to the magnitude of a signed 32 bit integer, timestamp accuracy to 1 second. These and other limits need to be extended to cope with current and future demands.
2. Non-idempotent procedures.
A significant number of the NFS procedures are not idempotent. In certain circumstances these procedures can fail unexpectedly if retried by the client. It is not always clear how the client should recover from such a failure.
3. Unix®† bias.
The NFS protocol was designed and first implemented in a Unix environment. This bias is reflected in the protocol: there is no support for record-oriented files, file versions or non-Unix file attributes. This bias must be removed if NFS is to be truly machine and operating system independent.
4. No access procedure.
Numerous security problems and program anomalies are attributable to the fact that clients have no facility to ask a server whether they have permission to carry out certain operations.
5. No facility to support atomic filesystem operations.
For instance the POSIX O_EXCL flag makes a requirement for exclusive file creation. This cannot be guaranteed to work via the NFS protocol without the support of an auxiliary locking service. Similarly there is no way for a client to guarantee that data written to a file is appended to the current end of the file.
6. Performance.
The NFS version 2 protocol provides a fixed set of operations between client and server. While a degree of client caching can significantly reduce the amount of client-server interaction, a level of interaction is required just to maintain cache consistency and there yet remain many examples of high client-server interaction that cannot be reduced by caching. The problem becomes more acute when a client’s set of filesystem operations does not map cleanly into the set of NFS procedures.
1.2 The Network Extensible File System
NeFS addresses the problems just described. Although a draft specification for a revised version of the NFS protocol has addressed many of the deficiencies of NFS version 2, it has not made non-Unix implementations easier, not does it provide opportunities for performance improvements. Indeed, the extra complexity introduced by modifications to the NFS protocol makes all implementations more difficult. A revised NFS protocol does not appear to be an attractive alternative to the existing protocol.
Although it has features in common with NFS, NeFS is a radical departure from NFS. The NFS protocol is built according to a Remote Procedure Call model (RPC) where filesystem operations are mapped across the network as remote procedure calls. The NeFS protocol abandons this model in favor of an interpretive model in which the filesystem operations become operators in an interpreted language. Clients send their requests to the server as programs to be interpreted. Execution of the request by the server’s interpreter results in the filesystem operations being invoked and results returned to the client. Using the interpretive model, filesystem operations can be defined more simply. Clients can build arbitrarily complex requests from these simple operations.
- Employee was error prone and this mistake was just the biggest one to make headlines. Could be from incompetence or apathy.
- Impacted clients demanded the employee at-fault be terminated.
- Deterrence: fire one guy, everyone else knows to take that issue seriously. Doesn't Google do this? If you leak something to press, you're fired, then a company email goes out "Hey we canned dude for running his mouth..."
It's better to engage the known and perhaps questionable justifications than to "never understand".
Case 2: no competent manager would fire an employee who made a mistake to satisfy clients. They may move the employee to a role away from that client, but it would be insanity to allow the most unreasonable clients to dictate who gets fired. Any manager who does what you suggest should expect to have lost all credibility in the eyes of their team.
Case 3a: A leak to the press is a purposeful action. Firing for cause is perfectly reasonable. Making a mistake is not a purposeful action.
Case 3b: If you want to convey that a particular type of mistake is serious, don't do so by firing people. Do so with investments in education, process, and other tools that reduce the risk of the mistake occurring, and the harm when the mistake occurs. Firing somebody will backfire badly, as many of your best employees will self-select away from your most important projects, and away from your company, as they won't want to be in a situation where years of excellent performance can be erased with a single error.
If I see someone getting axed for making a mistake, I'd be making a mistake if I didn't immediately start firing up the resume machine.
I've never heard of this happening. I've heard of people fired for taking photographs (or stealing prototypes!) of confidential products and handing them to journalists.
"What kind of Mickey Mouse show is Manager Mark running over there?" asks colleague Claire, "Isn't that guy Ryan the same one that screwed up the TPS reports last year?"
On the other hand, if Mark fires Ryan, then mark is a decisive manager. Even if the total number of major errors is higher, then still there will not be a risk of letting being known as a manager that let's people screw up multiple times.
Furthermore, a lot of individual error's are seen in an institutionalised "systems" framework - given that people invariably will make mistakes, how can we set up the environment/institutions/systems so that errors are not catastrophic.
Not sure how that applies to movie animation, to be honest, but not primarily looking for whom to blame was certainly a very good move.
Of course, if the problem is just a borderline behavior of the pilot or co-pilot, it'll be fantastic if we can get him off the circuit before he locks the captain outside and programs the plane to crash against a mountain. Or not to stretch fuel limits so that he will fall out of gas.
But... if we can also learn how to make a out-of-gas plane land and survive, and the cost is "let's not put this pilot into jail, because it's better to learn how to save more lives", I prefer this approach. Probably you'll be able to get the pilot from some other behavior.
> The NTSB does not assign fault or blame for an accident or incident; rather, as specified by NTSB regulation, “accident/incident investigations are fact-finding proceedings with no formal issues and no adverse parties ... and are not conducted for the purpose of determining the rights or liabilities of any person.” 49 C.F.R. § 831.4.
(This is on first (non-title) page of any NTSB accident report. [1])
Of course, the NTSB determines "Probably Cause", and makes safety recommendations. But the point is not to blame the pilot. Notice also that enforcement action is taken by a different agency, the FAA, not the NTSB.
Lastly, the whole ASR reporting system is set up to maximise the information gathered and minimise future accidents, while giving some dispensation to pilots that have made mistakes.
[1] see e.g. e.g. https://www.ntsb.gov/investigations/AccidentReports/Reports/...
Edit: add > to indicate quote.
Assigning "Cause" is an important part of accident analysis. There have been many cases of a pilot with proper aeronautical decision making processes, and due care and caution, still making a piloting error resulting in a mishap.
Classic example would be TACA 110 [0] Weather related factors, and a flaw in the engine design caused both engines to fail. Rushing the restart procedure resulting in a "hung start" of both engines and subsequent overheat. Thanks to the skillful flying of Capt. Carlos Dardano, and his crew, this 737 made one of the most successful dead-stick landings in history. Capt. Dardano was not to "blame" for the mishap, but he did make errors that were contributing factors.
The 737 needed an engine replaced, but was able to be flown out and fully repaired within weeks of the mishap. Southwest Airlines retired the aircraft in December 2016, with over 27 years of uneventful service.
Same goes for every tech company I have worked at. I have never been in a post-mortem meeting where the goal was to allocate blame. It was always emphasized that the goal of the meeting was to improve our process to make sure it never happens again, not punish the party responsible.
Excerpts from Wiki:
> In March 2008, Bernard Farret, a deputy prosecutor in Pontoise, outside Paris, asked judges to bring manslaughter charges against Continental Airlines and two of its employees – John Taylor, the mechanic who replaced the wear strip on the DC-10, and his manager Stanley Ford – alleging negligence in the way the repair was carried out.
> At the same time charges were laid against Henri Perrier, head of the Concorde program at Aérospatiale, Jacques Hérubel, Concorde's chief engineer, and Claude Frantzen, head of DGAC, the French airline regulator. It was alleged that Perrier, Hérubel and Frantzen knew that the plane's fuel tanks could be susceptible to damage from foreign objects, but nonetheless allowed it to fly.
> Continental Airlines was found criminally responsible for the disaster by a Parisian court and was fined €200,000 ($271,628) and ordered to pay Air France €1 million. Taylor was given a 15-month suspended sentence, while Ford, Perrier, Hérubel and Frantzen were cleared of all charges. The court ruled that the crash resulted from a piece of metal from a Continental jet that was left on the runway; the object punctured a tyre on the Concorde and then ruptured a fuel tank. The convictions were overturned by a French appeals court in November 2012, thereby clearing Continental and Taylor of criminal responsibility.
> The Parisian court also ruled that Continental would have to pay 70% of any compensation claims. As Air France has paid out €100 million to the families of the victims, Continental could be made to pay its share of that compensation payout. The French appeals court, while overturning the criminal rulings by the Parisian court, affirmed the civil ruling and left Continental liable for the compensation claims.
I've found that that helps morale, as there's a sense of shared responsibility, but there's no blaming people for problems where I work, so I haven't actually seen what happens when people are searching for the culprit.
The usual process is "this happened because of this, this and this all went wrong to cause us to not notice the problem, and we've added this to make it less likely that it will happen again". If you have smart, experienced people and you get problems, it's because of your processes, not the people, so the former is what you should fix.
One day at $megacorp a bug caused a production outage and a project manager sent an email to the team calling out the engineer who committed the change and asking us all to be more careful in the future. That manager was immediately reprimanded both in the email chain and in private.
I find the culture of shared responsibility to be one of the best qualities of our industry, even if it isn't universal.
I left and found out two months later from a friend he had managed to take down almost every single server in the place for which he had access. Even the legacy don't touch systems that just boot and run equipment.
Be pretty.
Since Catmull has an engineering background (his PhD involved the invention of the Z-buffer, and he was doing computer graphics before anyone knew anything about it), he understands that mistakes and failed projects, when combined with an forthright and collaborative feedback loop, are not problematic detours, but rather necessary mile markers on the path to real innovation. We'd be so much further ahead if we put more men like Catmull in charge of things.
The biggest problem with reading Creativity Inc. is that it will rekindle the hope that there may be a sane workplace out there somewhere, when practically speaking, we know that few of us will ever find employment in one. It gave me a number of disquieting feelings as I read that the attributes of a workplace that all good engineers crave actually can and sometimes do exist out there. I had convinced myself that these things were myths, so now I'm sad that my boss isn't Ed Catmull.
That said, I do believe some evaluation and/or discipline would've been appropriate in this case, not for the person who accidentally executed a command in the wrong directory, but for the people who were supposed to be maintaining backups and data integrity.
Assuming that your primary job duties involve data integrity and system uptime, having non-functional backups of truly critical data stretches beyond the scope of "mistakes" and into the scope of incompetence.
It is, I'm sure, very possible that no one was really assigned this task at Pixar and that it would therefore by improper to punish anyone in particular for the failure to execute it, but I do believe there is a limit between mistakes en route to innovation and negligence. My experience has been that most companies strongly take one tack or the other: they either let heads roll for minor infractions (and thus never allow good people to get established and comfortable), or they never fire anyone and let the dead weight and political fiefdoms gum up the works until the gears stop altogether. There needs to be a balance, and that's a very hard thing to find out there.
If indeed there was no-one assigned this task, then it was a mistake of negligence on the part of Pixar's management at the time. I'm not saying that to be snippy — that is exactly the job of management: to build the systems and processes required for employees to achieve the firm's goals. Proper backup and restore of data is one of those processes.
An executive usually requires a "Come to Jesus" moment like this one, where the entire company teeters on the precipice due to lax backup or security policies, to really have the importance impressed upon him or her. At that point, they are generally much more supportive, though sadly, this too can start to fade if the sysadmins do their job too well.
I don't want anyone to come away thinking that most companies have solved these problems. It's definitely not the case, even in large, established companies. Security and backups continue to get little attention until it's too late.
We really need to call a celebrity in MBA circles and get that person to run a seminar meant to scare the pants off the execs.
Wasn't Catmull involved in wage-fixing? [http://www.cartoonbrew.com/artist-rights/ed-catmull-on-wage-...]
"“Like somehow we’re hurting some employees? We’re not,” Catmull said. “While I have responsibility for the payroll, I have responsibility for the long term also,” Catmull said. “I don’t apologize for this. This was bad stuff.”"
I can't find the other interview, but in a later interview he makes it clear his job is to worry about Disney's profitability.
I worked in visual effects for five years and loved every moment. People who choose that profession are fun, creative, passionate artistic, super energetic, crazy, smart, pull off the nearly impossible every project, out of the ordinary in every way, and crazy (listing that one twice). I miss the people. When I changed back to non-vfx development work my take home pay literally doubled. Obviously there is more to life than just pay! But the wage suppression has had a lasting effect... at the same time there are so many people who want into "the biz" it appears they that can/should? get away with it.
One potential interpretation is that this artificially depresses worker salaries as workers are not continuously being auctioned back and forth. Another potential interpretation is that this allows the company to have the stability it needs to function, prevent toxic sentiment among peers who take a bid from one company or the other, potentially leaving others holding the bag for the project.
I believe this latter interpretation is the intent of most such agreements, and that the former is rarely considered legitimate (i.e., continuous bidding wars would be too disruptive to be feasible even if there were no formal agreements in place).
Such understandings are very common across competitors in all lines of work, whether they're written or not; at a former company, I was personally told by the CEO that we couldn't actively recruit someone who worked at a competitor because we didn't want to risk starting a bidding war over talent and potentially throwing everything off-kilter. Such arrangements are not SV-exclusive, let alone Pixar-exclusive, and they are done out of practicality, not malice. Market value for employees can be correctly surmised without feverish, aggressive overbidding.
The incident is frequently misconstrued as a complete block on any cross-hiring. My understanding is that it was simply an agreement forbidding cross-recruiting; a gentleman's agreement that they wouldn't try to start an arbitrary bidding war over the one company's talent if that company wouldn't try to start one over theirs. Employees were still free to seek and obtain employment at any of the major studios independently if they so chose.
I think that panicked cries of wage fixing and intentional repression of employment opportunities are not only not credible, but farcical. I'd ask myself why someone is interested in painting an imbalanced and unrepresentative picture such as that.
If anything, these agreements are a failure of the contemporary legal and HR departments across every major technology company involved in computer animation. I believe the intent of the executives was nothing more than maintaining a stable workforce. Their lawyers and HR people should have warned them that there was another dormant interpretation that could've been used by exploitative politicians to misrepresent the situation.
Last time this came up (that I saw), the Pixar, Apple, and Intel et al chiefs were being compared to Nazis. That is beyond the pale.
There was an incident where I work where an employee (a new hire) set up a cron job to delete his local code tree, re-sync a new copy, then re-build it using a cron job every night. A completely reasonable thing for a coder to automate.
In his crontab he put:
rm -rf /$MY_TREE_ROOT
and as everyone undoubtedly first discovered by accident, the crontab environment is stripped bare of all your ordinary shell environment. So $MY_TREE_ROOT expanded to "".The crontab ran on Friday, IIRC, and got most of the way through deleting the entire project over the weekend before a lead came in and noticed things were disappearing. Work was more or less halted for several days while the supes worked to restore everything from backup.
Could the blunder have been prevented? Yes, probably with a higher degree of caution, but that level of subtlety in a coding mistake is made regularly by most people (especially someone right out of university); he was just unlucky that the consequences were catastrophic, and that he tripped over the weird way crontab works in the worst possible usage case. He probably even tested it in his shell. We all know to quadruple-check our rm-rfs, but we know that because we've all made (smaller) mistakes like his. It could have been anyone.
Dragging him to the guillotine would have solved nothing. In fact, the real question is "how is it possible for such an easy mistake to hose the entire project?" Some relatively small permissions changes at the directory root of the master project probably would have stopped stray `rm -rf`s from escaping local machines without severely sacrificing the frictionless environment that comes from an open-permissions shop. So if anything, the failure was systems's fault for setting up a filesystem that can be hosed so easily and so completely by an honest mistake.
The correct thing to do was (and is) to skip the witch hunt, and focus on problem-solving. I am not sure, but I think the employee was eventually hired on at the end of his internship.
For me the principle is: Standards and habits are teachable. Competence and attitude, less so. Educate and train for the former, and a failure of the former should cause you to look first at your procedures, not the people. Hire and fire for the latter.
The other side is if you play a key role (and head could roll after the hard work is done) to simply leverage that fact (perhaps with others) as an advantage such that you have get a new contract and can't be fired for X amount of time.
So that effort to recreate it (not to mention produce it in the first place) was pretty much all for naught? That must have been soul destroying
"We didn't scrap the models, but yes, we scrapped almost all the animation and almost all the layout and all the lighting. And it was worth it.
Changing the script saved the film, which in turn allowed Buzz and Woody to carry on for future generation (see ToyStory3 for how awesome that universe continues to be - well done to everyone who worked on the lastest installment!) and, in some ways, set a major cornerstone in the culture of Pixar. You may have heard John or Steve or Ed mention "Quality is a good business model" over the years. Well, that moment in Pixar's history was when we tested that, and it was hard, but thankfully I think we passed the test. Toy Story 2 went on to became one of the most successful films we ever made by almost any measure.
So, suffice it to say that yes, the 2nd version (which you saw in theatres and is now on the BluRay) is about a bagillion times better than the film we were working on. The story talent at the studio came together in a pretty incredible way and reworked everything. When they came back from the winter holidays in January '99, their pitch, and Steve Jobs's rallying cry that we could in fact get it done by the deadline later that year, are a few of the most vivid and moving memories I have of my 20 years at the studio."
https://www.quora.com/Did-Pixar-accidentally-delete-Toy-Stor...
[0] http://web.archive.org/web/20121213100913/http://www.raindan...
[1] http://pixar.wikia.com/wiki/Toy_Story_2_(original_storyline)
> Steve Jobs's rallying cry that we could in fact get it done by the deadline later that year
There interesting but here is that Jobs didn't know if his cry was true. But he needed it to be true, so it was. Jobs was a member of the "action-based community", not the "reality-based community" https://en.wikipedia.org/wiki/Reality-based_community
"We have to keep this scene even though it's not quite perfect because otherwise it's a waste of money".
Maybe this is a bad example actually, movie industry is something you launch and market and leave.
But the best architectures I've seen have been demolished, destroyed and rebuilt from the ground up for their purpose.
Same with code.
Back when I was still in the film/video industry, it happened often, you kinda get accustomed to the ephemeral nature and you try not to get too attached to your work. Not always successfully but you try.
This can also be a destructive siren call:
https://www.joelonsoftware.com/2000/04/06/things-you-should-...
But I think it's not absolute. Sometimes rewrites are imperative.
So often something happens which seems like a total disaster, the end of the world, and you struggle desperately to fix it.
In hindsight it turns out it didn't matter as much as you thought it did anyway. Has happened in so many startups I've worked at.
Life goes on.
I bet you they were suddenly industry experts in source control and data backups.
A long time ago I had a hard drive fail that had a bitcoin wallet with about 10 bitcoins in it.
At the time it was worth a hundred USD or so. I tried to fix it myself, ended up failing and throwing the drive out.
Right after that bitcoin started its meteoric climb. Every now and then I check the prices, then I go check that my backups are running, that my restores work, that my offsite backup is setup correctly, that every single one of my devices is backed up.
It was a $9,000 life lesson (as of right now...)
(What's worse is losing 100+ BTC to Gox. :p)
I have not lost anything really important but I cannot live without at least 3 geographically separated backups of generations of backups for something I don't want to lose.
Reminds me of Fred Brooks quote. "Plan to throw one away. You will anyhow".
I worked at a few VFX studios, and everyone has deleted large swathes of shit by accident.
My favourite was when an rsync script went rogue and started deleted the entire /job directory in reverse alphabet order. Mama-mia[1] was totally wiped out, as was Wanted (that was missing some backups, so some poor fucker had to go round fishing assets out of /tmp, from around 2000 machines.)
From what I recall (this was ~2008) There was some confusion as to what was doing the deleting. Because we had at the time a large(100 or 300tb[2]) lustre file system, it didn't really give you that many clues. They had to wait till it went on a plain old NFS box before they could figure out what was causing it.
Another time honoured classic is matte painters on OSX boxes accidentally dragging whole film directories into random places.
[1]some films have code names, hence why this was first
[2]That lustre was big, physically and IO, it could sustain something like 2-5 gigabytes a second, It had at least 12 racks of disks. Now a 4u disk shelf and one server can do ~2gigabyes sustained
There was another incident where there was a script that ran out of cron to cleanup old files in /tmp, and someone NFS mounted a production volume into /tmp...
Eventually we put tarpit directories at the top of each filesystem (a directory with 1000 subdirectories each with 1000 subdirectories, several layers deep) to try and catch deletes like the one you saw, then we would alert if any directories in there were deleted so we could frantically try and figure out which workstation was doing the damage.
Second, there were very large nearlines that took hourly snapshots. Finally, lots and lots of tape for archive.
> The command that had been run was most likely ‘rm -r -f *’, which—roughly speaking—commands the system to begin removing every file below the current directory. This is commonly used to clear out a subset of unwanted files. Unfortunately, someone on the system had run the command at the root level of the Toy Story 2 project and the system was recursively tracking down through the file structure and deleting its way out like a worm eating its way out from the core of an apple.
That's my theory as to what they did.
rm -Rf test /
rm: it is dangerous to operate recursively on ‘/’
rm: use --no-preserve-root to override this failsafe
GNU rm, but I don't know when it was introduced.tl;dr That's when coreutils Ubuntu package switched from "--no-preserve-root" to "--preserve-root" by default.
edit: More info:
it's one thing to shoot yourself in the foot, but without safe-rm you (or someone else less cautious) will eventually fire the accidental head-shot. it's happened to me a couple times; but never again since I started using safe-rm everywhere.
[1] http://serverfault.com/questions/337082/how-do-i-prevent-acc...
Under some shells (eg bash) that will expand to include `..` and `.`.
Hopefully, it was not at the root directory and we have frequent snapshots.
Edit: What would have been much more worse, if I had done it, would have been
rm -rf ~ /foo
instead of rm -rf ~/foo rm -rf /usr /lib/modules/something/somethingIn other words, the data is still there in the flash, but only the SSD firmware (and physical access) has access to it.
NAND requires an erase before write so I wouldn't be surprised if some controllers are lazily erasing blocks to get better long term write speeds and prevent GC hiccups.
You might be able to recover something from the physical flash, but there's definitely no guarantees.
I remember that Apple removed the "Secure Empty Trash" feature in OS X 10.11 because they didn't feel like they could guarantee secure deletion with their new fast SSDs present in most of their computers.
Once SSDs arrived on the scene, they were limited by the interface as ATA didn't specify a way to mark sectors as unused. People found that their performance would degrade with use as all the sectors became utilized. But a secure erase command would mark all sectors as erased, so the drive would work like new. Later on, ATA got the TRIM (and later queued versions of TRIM) so the OS can mark specific sectors as erased. But the result is that a lot of people confuse flash sector erasing with secure erase.
I believe it was in this talk that he says the best work he ever did was when he scrapped and started over. Which from practice I think we can all admit that while its the hardest to do, it is always for the best.
Not necessarily. People often underestimate (in engineering fields) how much work it will take to rebuild something. In software there is a high degree of creativity which can have large downstream effects. You need to architect your system in such a way to make it possible to replace components when needed, this is where strong separation of concerns is important.
One thing that I've seen happen time and again is an organization bifurcating itself, so that there is one team working on the new cool replacement, and the other working on the old dead thing that everyone hates. Needless to say this creates anymosity and serverely limits an organizations ability to respond to customer demands.
Starting over should be taken very seriously.
> And then, some months later, Pixar rewrote the film from almost the ground up, and we made ToyStory2 again. That rewritten film was the one you saw in theatres and that you can watch now on BluRay.
At first I was feeling how it would feel to lose all that work, so frustrating! But then even if you hadn't, it turns out management was gonna throw it all away anyway!
Context: For the last five years, my backup system has been to have Time Machine do hourly backups on my MBP (main development machine, just shy of 1TB data), with key spots on my Linux server (3TB data at the moment) backed up daily to my in-laws' house using cron and rsync, and spot directories on the MBP backed up there as well.
But the hard drive on the Time Capsule I've used seems to have gotten unreliable, and the external USB drive I bought to replace it has not worked reliably for more than a day or two at a time. And even when it was all working properly, I was never really verifying my backups.
Do people have suggestions for secure, reliable, verifiable, easy backup systems capable of handling 4+ TB of data? I don't mind if it takes work or money to set it up; the important thing is once it's working I can mostly forget about it.
CrashPlan is the next-best option if you need Linux support, but the client isn't as good.
The Synology box is basically just an ARM Linux machine, SSH/root is not locked out if you want it, so if you want to get fancy with off-site backups, you can set up rsync or whatever you want on it. They even ship with some GUIs for mirroring to Dropbox, S3, rsync, another remote Synology NAS, etc.
Synology has specific support for Time Machine, in fact in their recent software update they added support for Time Machine over SMB since Apple is deprecating AFP.