218 points · by curtis · 9y ago · 82 comments
What I mean is: pre-optimizations like that. My current cofounder and I build and run fire effects [flamethrowers] at music festivals, and every load-in/setup is a fun game of seeing what ways we can optimize our setup process. Stuff like figuring out the wrenches and tools we need to assemble a specific component, and then storing those tools with the component.
Seeing those bolts sitting on the grate like that (I think it was 4 on each side) means that somebody had the foresight to realize that it was easier to strap the bolts to the piece like that, than to have the guys assembling it carry them with them up the ladders (imagine if they forgot one, what a pain that would be).
So freaking cool.
Definitely something to keep in mind though.
As a lighting guy I saw to much stuff fall from the sky. One concert hall I worked at used a rice-paper snow effect for a Japanese show. Four years later we still had the occasional bit of rice paper glide slowly down from 100' up. It could never hurt anyone, but film/TV clients who used the hall would be screaming mad when they saw it.
Not to curb your enthusiasm or downplay the ingenuity of those builders, but the assembly process seems fairly repetitive and easier to optimize over time. I doubt they had this foresight before doing the first (ever) pole.
It's like building a really good workshop. Ideally everything is exactly where it needs to be, and in the exact order you might need it.
Another example is: my electronics assembly dreamcart (that I haven't gotten to build yet):
-18-24ga stranded wire in at least 3 different colors on spools above the worktable
-Soldering iron
-Oscilloscope
-Power supply
-Multimeter
-Strippers/side cutters [1]
-Crimpers
-Crimps/ferrules
-Network switch/ethernet cables
All of this stuff on a cart that is on casters, with a UPS that can power it so if I need to move away from an outlet I can.
I didn't figure out exactly the tools I wanted and how I wanted them arranged on my first project, but over time I figured out the exact tools I want, and where in my workspace I want them, so that I have to spend as little time as possible looking for things, or thinking about where they might be.
I think seeing the little improvements people have made is really cool. Like the bolts. It's cool because maybe the didn't figure it out on the first time.
[1]: I particularly like this one because it puts the strippers and the side cutters in the same hand, which is just closer to my optimal dream-shop/workflow: https://www.amazon.com/DA76070-KLENK-Wire-Cutter-Stripper-Sm...
http://www.kaman.com/aerosystems/solutions/air-vehicles-mro/...
https://www.youtube.com/watch?v=iEx3dJTIjww
They've also developed an unmanned version for military resupply missions:
https://www.youtube.com/watch?v=jQ4X7Y2ydS0
http://jalopnik.com/this-is-the-weirdest-dang-helicopter-i-h...
It seems that there are reasonably long period of time here when the helicopter is still connected to a tower segment when the workers are in the process of screwing bolts in. Why isn't this problematic?
The operations depicted are not uncommon on construction sites (e.g. when mounting rooftop equipment) and there are OSHA regulations for helicopter cranes. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=...
You need to see it in HD to see the rope. It's called "recovery assisted landing" or sometimes "hauldown".
Ski lift installations are rare, but power line towers go up by the tens of thousands. So the power line people need a way to do this routinely and safely.
1. Tower segment is hanging from helicopter.
2. Tower segment is in place with pins preventing it from falling over, but can be lifted away by the helicopter.
3. Tower segment is in place with pins preventing it from falling over, and will be released if the helicopter needs to fly away.
4. Tower segment is in place, fully secured by bolts.
The key point here is that under good conditions -- and they only ever do this under good conditions! -- a few pins is all it takes to stop the tower segment from falling over, but they won't stop the helicopter from lifting it off again. Securing the tower with two dozen bolts is only necessary when you want it to stay in place during strong winds and with the added load of the lift cable + chairs.
This is due to the calculated risk of something going wrong: workers on the pole can quickly move around if the unmounted pole starts falling, similar to lumbar can quickly change position when tree falls. With helicopter however, a violent pull of attached line could probably end up with part of helicopter being chunked out of the hull.
Deck hand on Indian fishing trawler is more toward the dangerous end. This is pretty in the middle. Very few variables are uncontrolled here. Anything involving confined spaces and chemicals is definitely more on the dangerous end.
In the event there is a risk to the helicopter due to the winch operation (such as the line becoming stuck in some tress below) - the pilot has the ability to cut the cable to ensure the helicopter is not compromised.
http://www.raf.mod.uk/rafsearchandrescue/rafcms/mediafiles/7...
The use of guide cables/pins was really neat. Assuming the camera is 'real' time (it wasn't sped up for the video) it looks like about 15 seconds between starting to pull the guide cables through to the point where they have two bolts installed. So a pretty narrow window for problems, of course you wouldn't do it when it was windy out either.
We were shown this video during our training, and our boss said with a very straight face that if she were ever on a chair that started rolling backwards, she would jump off.
The reason "rollback" can happen is because the weight of all the people is only on one side of the line, and that weight wants to come back downhill. The chair has a couple of different kinds of brakes that are supposed to prevent this, but you can see what happens when it fails / is engaged too late.
Two broken legs are better than that.
NOTE HOWEVER: Newer "Detachable" or "high-speed" chairs and gondolas are often designed to run in reverse, so don't immediately jump off one of those if it goes backwards.
I wonder if the "up and down" lifts that go down and up a valley (e.g. there is one at Alpe d'Huez) or over a ridge (e.g. the one at Val d'Isere) suffer from the same problem - even allowing for the fact that I'm pretty sure that they are modern detachables.
2:12 https://www.youtube.com/watch?v=IHsF1kRKEV0
TLDR; Spool out cable (rope), lift the end up with helicopter drape it over the sheave train (the wheels on the cross arm) pull out more rope, etc
The splice for the Vail lift is about 300 feet long apparently.
I used to play it quite a bit when it first came out.
I used to be a volunteer on an emergency lifeboat crew, we would do a lot of drills with a man on a winch and the first rule is, don't touch until he's earthed. Helicopters pick up a hell of a lot of static electricity so you normally see a small earthing line hanging below the man on the end of the line.
One time we were practicing fast recovery, the boat and the helicopter doing crew exchange at high speed. We screwed it up and the static charge blew a hole in the side of the boat!
TIL: Not everyone uses the term earthed!
Your point stands though: gondolas are probably not a great form of transport. That said, I have no idea what the speed limits would be for a gondola that was designed for speed.
http://wdwnt.com/blog/2017/04/depth-speculation-disney-world...
http://www.curbed.com/2016/7/25/12248896/urban-gondolas-cabl... http://www.curbed.com/2016/5/19/11714678/urban-cable-austin-...
Unique geography there; the city is in a bowl, but El Alto, its main commuter suburb, is on the high plain above the rim of the bowl. There is a single road linking them, which in rush hour is jammed with minibuses.
London also has its "Emirates Air Line", which is a pointless gimmick that doesn't serve a useful route.
While you can make a multiple stage detachable gondola, every detach point/stage is adding significantly more points of failure and complexity. There is a reason you don't see more than ~3-4 stages and that's it.
They are also very maintenance intensive and not all that reliable.
Fun video