507 points · by janober · 9y ago · 201 comments
The yawing motion at the beginning of the video is because they moved the drone ship to avoid stormy seas, so the stage had to thrust sideways to retarget. In calm weather SpaceX positions the ship right along the ballistic path, so the stage only needs to pitch up and "flip."
You can also see the grid fins "pulling up" through the atmosphere to bleed off as much speed as possible. I described the optimization a while back. https://news.ycombinator.com/item?id=14288431
Fantastic job to everyone at SpaceX!
The maneuver is more noticeable with the new titanium grid fins (needed because the old aluminum ones caught fire from aerodynamic heating). Not only are they larger, but they use a "sawtooth" leading edge that increases control authority. New: https://twitter.com/elonmusk/status/879065552060260352 Old: http://www.spaceflightinsider.com/wp-content/uploads/2015/12...
They also happen to be the largest titanium forgings in the world. https://forum.nasaspaceflight.com/index.php?topic=42544.340#...
In this case, it's "given enough initial velocity and control authority, even a brick will glide", but the spirit is the same.
A few years back a group of engineers decided to prove this by attaching a number of solid fuel rocket engines to a port-a-potty and launched it to great applause.
https://twitter.com/elonmusk/status/832480331496185857?lang=...
The goal of this maneuver to lengthen the descent path, which in the absence of an atmosphere would be a pure parabola (or more accurately, a suborbital ellipse). Passing through more air means shedding more velocity due to drag, and therefore less fuel is needed to land. Geometrically the best way to do that is to pitch "nose up."
No drawing skills except shitty MSPaint, but that's never stopped me before. https://i.imgur.com/VLYXDOf.jpg
I mean, the company was founded only 15 years ago, they started (with success) launching stuff into space only 10 years ago and now it feels like they are able to launch rockets into space every week. Reusable rockets should we add.
Musk very often sets impossible deadlines, but in this case, even if you take a step back, it's scary to make 10 years predictions based on this company track record !
They really didn't start off with success. Their first 3 launches (on the Falcon 1 platform) were failures. If I remember correctly it nearly bankrupt the company and Musk himself ended up pouring a ton of money into it to keep them afloat.
It was a pretty rocky start for them as a company, and in my mind that makes it an even cooler story. They started with nothing, failed their first 3 attempts at launches but just kept at it, and they are now consitered at the top of the field less than a decade later.
http://www.businessinsider.com/fedex-saved-from-bankruptcy-w...
Going forward I'd expect some slowdown.
But yes, very impressive IMO that he won all the necessary investments and contracts. My bet is his buddy Theil (idk not really buddy, but collegue) helped out with that.
Whatever investment the US government have given to SpaceX, they'll get it back very quickly now that competition exists in the launch market.
Slowdown in funding or launch pace?
SpaceX is cutting launch costs significantly. I suspect that many satellite projects that weren't viable before will become viable now, thus increasing launch pace.
“People don’t realize that, for small countries and small companies like us, without SpaceX, there was no way we would ever be able to even think about space."
"With them, it was possible. We got a project. I think, in the future, it’s going to be even more affordable because of reusability.”
Not to take anything away at all, but a large part of the rocket development until now was based on an existing knowledge base from NASA.
Going forward, there's going to be more and more uncharted territory, so things will likely progressively slow down, relative to the astonishingly fast development pace up until this point.
I'm not sure that's true. What did NASA help them with, exactly?
More like, they know it is possible so they did it.
Somebody had to, no one would
SpaceX tried to do the best they couldNot it doesn't. Stop trying to spread false impressions. This site is a discussion platform, not an advertising one...
https://en.wikipedia.org/wiki/List_of_Falcon_9_and_Falcon_He...
https://en.wikipedia.org/wiki/List_of_Falcon_9_and_Falcon_He...
Each did diminish their reputation, but they have kept going. They can weather more failures, and every launch is still pretty nerve-wracking.
The stakes will be higher when they start carrying people, perhaps next year.
https://en.wikipedia.org/wiki/SpaceX_Dragon#Crewed_developme...
Funny that very few people see this and instead are already cheering them for doing the "impossible"...
The new grid fins undergo the same amount of heating, they're just better able to cope with the heat. The reduced heat in this case was due to the much lower energy entry profile (the partial boostback burn killed a large chunk of the stage's velocity prior to reentry, combined with the fact that it was a lower energy orbit in the first place).
https://twitter.com/elonmusk/status/878821062326198272
Cast and cut titanium. They are about 4x5 feet and some of the largest (if not the largest) titanium castings in the world.
Titanium is an amazing material that is super hard to work with (special furnaces), and has its own sets of risks (titanium fire any one). I would love to see what goes into making those things because it simply has to be impressive.
1 - Most industrial DMLS/EBM systems have a build envelope far too small for this. A system like the Norsk Merke IV might have the required size, but parts built that that process still require post-machining. 2 - Tolerances. Casting -> Machining still offers greater control over the final geometry than additive processes, especially at that scale. 3 - Casting is a bit more design-agnostic than additive processes. 4 - QC processes for casting + machining are far more defined than for additive processes.
None of these are insurmountable challenges, so I'm sure in the future a laser-sintered/EBM/plasma-deposition process will be used or at least heavily-considered.
This is OK for the average power drill in your house. It isn't critical, and they can compensate for the porosity with extra materials.
If we were replacing a steel part with at TI one, then sintering might make sense, the extra strength, and lowered weight would compensate for the differences in materials.
They make extensive use of laser sintering in the SuperDraco engine (including the combustion chamber, which experiences tremendously high temperatures and pressures).
That being said, laser sintering is great for parts with weird geometries and structures that are hard to machine. A grid fin is really straightforward from a milling perspective, and would take advantage of the strengths of laser sintering.
As a business, that's been SpaceX's biggest problem. Customers like the pricing but not the long delays. Finally, SpaceX seems to be getting past that.
Getting pad time at Canaveral is a bottleneck. SpaceX is still building their own launch site at Brownsville,, TX, but that's going slowly.[1] All SpaceX has there right now is some fill that's settling (the location is on sand maybe 2m above sea level) and a dish antenna. Next to be built, the fire station. First launch is now supposed to be no earlier than 2018.
[1] http://www.krgv.com/story/35550679/3m-road-project-underway-...
It's still around a two-week turnaround to get a launch pad ready in Canaveral.
Now there are other considerations. SpaceX has a number of good PR reasons to want to be upfront about their costs (their competition is regularly accused of cheating the government every election cycle). If you sell retail your customers will ignore you if you don't have pricing information.
The competition aspect is pretty commonly worked around - basically every B2B company I know has no compunctions against calling up a competitor, posing as a potential customer, and getting a price quote for competitive research. Or if they have slightly more compunctions, they'll call up a market research firm, hand over some money, and the market research firm will call up all the competitors in the industry, pose as a potential customer, and sell that information back to all the competitors in the market.
I suspect that SpaceX's published price tag is really there to motivate the employees. It's a reminder that Elon's goal is to make spaceflight a mass-market product that an ordinary middle-class citizen can afford, and so he wants that number to go down over time. In many B2B markets without price transparency, there's a tendency towards lazyness on the engineering side; when your revenue comes from how effective your salespeople are at jacking up the price, there's little incentive to focus on small efficiencies that keep the overall price down. Elon wants to keep the focus on small efficiencies so that the price gets low enough that it becomes an everyday thing.
I used to work for a company that had a single product and sure we've lost a few customers to our competitors because of our pricing, but judging by what they chose instead I don't envy them.
(Granted, SpaceX did it first)
ULA's insurance rates are not significantly different from SpaceX, btw.
... and import it to Stellarium http://www.stellarium.org/wiki/index.php/Satellites_plugin
P.S.: Stellarium 0.16.0 released few days ago! https://sourceforge.net/p/stellarium/news/2017/06/stellarium...
edit Corrected "TWR > 0" to "TWR > 1".
Probable wind gust right before landing.
Yesterday's "jump" for the last few feet was probably due to the ship going up and down with the waves and the rocket not expecting it
https://www.amazon.com/Toysmith-Classic-Pin-Art-Black/dp/B00...
If Elon can, I need to, as his protege (again metaphorical)
How about London to NY?
So, no, I don't see anything like that coming. Based purely on speculation and observation, of course.
The US has the best train infrastructure in the world. What is lacking is passenger rail, which gives the false impressions that the infrastructure is bad. Trains are not a very good fit for moving people for the most part. Other countries have stretched those limits to the max which means that they can give the impressions of good train infrastructure.
http://www.marketwatch.com/story/elon-musk-takes-to-twitter-...
So basically very little.
So considering that, SpaceX has not proved anything, yet. Because the impossible or hard part is not launching and landing rockets. Hard part is to do it..
1. With same or more reliability than using completely new rockets.
2. Launch with enough frequency to justify the reusing procedure..
So yea. A couple of launches and reuses does not prove anything. It is a start, sure. But they have not yet proved others who didn't attempt this yet..