by yrb · 9y ago · 0 comments
Let alone that we basically award this work one estimated number and the ability to get through a paper work hurdle.
If you start making those rules complex it becomes hard to compare bids to each other, since your bids are likely to become non-transitive based on the scenarios.
Cost plus is the normal way this is side stepped, but unless you have a system that is mostly ethical actors that can break down. And if you have all ethical actors pretty much any system will work...
Why not just have major contractors required to post a bond when they place a bid, and if they have cost overruns they pull those from the bond (ie, their own money)?
Case in point: SpaceX challenging the launch industry's cost-plus culture with publicly-posted fixed prices [1].
Case in point #0: the Space Shuttle (STS).
[1] https://www.nasa.gov/pdf/382045main_19%20-%2020090730.11.STS...
I am not sure if you can implement a system that would work well when your actors are profit driven work that needs to be done can only be done exclusively by one entity at a time, and as a bonus that extra profit gives you more feedback into how the system operates. There aren't a lot of natural negative feedback to keep things under control in that system.
Especially if your goals are to reduce overhead.