by chimeracoder · 8y ago · 0 comments
They could, technically, but the TWU won't let them. The TWU has used signal upgrades as a perpetual carrot for decades - anytime people talk about improvements, they say "well, we need to do X first, so we can upgrade to the most modern signal technology in Y years."
If they upgraded the signals, they'd lose this leverage, so instead it remains eternally Y years away.
The more likely answer is that the MTA has hired shady contractors who did incompetent work for years.
The TWU has immense leverage over the projects that get prioritized. In fact, of the six suggestions that the article lists for fixing the subway, the TWU has actively fought against five of them.
> and the MTA has not even hired union members to install the new signal system.
This is an issue that's been going on for decades. Talking about what's happening in 2017 with the new signal network misses the entire point of why this project wasn't completed back in the 90s.
At no point has the TWU stopped them. All the TWU can do is stop the MTA from eliminating jobs, they cannot stop the MTA's plans to install new equipment.
I don't think you understand how much power the TWU does have. Not only do they have the power to stop projects altogether, like automating the trains (which they did, as noted in the article), but they do have the ability to either delay or stonewall projects that they oppose by framing them as issues of labor allocation. Even if they can't unilaterally kill the project outright, they can make it expensive and painful enough that nobody will ever pursue it.
There's a symbiotic relationship between the TWU and MTA leadership (and one that's parasitic with respect to the state). Other aspects of this have already been described elsewhere in this thread and the linked article, and it's not possible to understand the way public transit infrastructure projects happen (or, more commonly, don't happen) in New York without accounting for this massive force.