by cs702 · 8y ago · 0 comments
The pair coordination cost between 3 individuals, ignoring overhead, is 3x dollars, as there are three possible pairs that need to coordinate, i.e., there are three connections in a network with three nodes.
The pair coordination cost between 4 individuals, ignoring overhead, is 6x dollars. At 5 people, the pair coordination cost is 10x dollars.
At n people, the pair coordination cost is (n(n-1)/2)x dollars, which is asymptotically proportional to n²x as n grows.[a]
When coordination costs are high, as with software development, it's not surprising that small teams outperform large teams.
Large software development teams generally cannot accomplish much -- unless they break into smaller, highly autonomous teams with well-separated responsibilities.
This applies to other high-coordination-cost endeavors, such as building a successful company from scratch.
--
[a] This is Metcalfe's law, but for a network's pair coordination cost instead of value: https://en.wikipedia.org/wiki/Metcalfe%27s_law
--
Now the data is organized, and anybody who needs it can get it on a pull basis. Some teams will have someone whose primary job is to triage information added and put the important stuff out in a daily update (making it "push" rather than "pull")
Hierarchy can also help; if you have mostly unrelated projects, then you have smaller groups that are more efficient.
The Linux kernel operates on a combination of these techniques; the mailing-list is non-pairwise, there's a significant amount of non-code information that goes along with any PR, and Linus doesn't even look at it until the subsystem maintainer has.
This leads me to believe that at large companies, you should heavily prioritize decentralization and low coordination costs to the expense of almost anything else. One reason companies fail to do this is trying to avoid redundancy: having two teams work on the same thing seems like a waste. But if you need to add a communication node to avoid redundancy, that's often not worth it.
If you have a team in charge of a monolith you are screwed. You can't afford to fire them, even if they deserve it.
Now multiply that by ~2,000. That's, roughly, the sort of resources Google has had. Kind of makes you wonder. Do we dramatically overestimate our abilities, or does the efficiency of companies like Google truly diminish as much as this little thought experiment would seem to suggest?
While there, I observed a lot of projects where I was literally working with a room full of world-class people - folks who had given TED talks, folks who had started major open-source projects, folks who had written the "Bible" of their particular subfield of computing - and the final design we came up with was worse than what any one person in the room, working on their own, could've come up with. Good designs tend to be both controversial and coherent: they take a position, not everyone agrees with the position, but they do it anyway because self-consistency has its own benefits that are often intangible but highly valued by users. When you design by compromise, you end up sanding off all the most innovative (= hard to communicate) parts of the design, and end up with only the bare minimum that everyone can agree on.
It's interesting that when you put a bunch of average people in a group, have them independently make a prediction, and then average the predictions, you end up with a result more accurate than any one participant's prediction. When you put a bunch of really smart people in a group, have them cooperate to make a design, and look at the design, you end up with a design that's worse than any one expert's original design.
The space of solutions to a design problem is really high dimensional and the quality of the design has many local maxima. So from that point of view it's not too surprising that averaging the features of several designs puts you at a point in the space which is not a local maximum. For a more apples to apples comparison with the averaging of predictions, it might be useful to consider predicting the value of a random variable drawn from a multimodal distribution. In this case it's highly likely that different people will focus their predictions on different modes and averaging several predictions will be worse than taking a single one in isolation.
(It's even explained in the wikipedia article about the concept in the book - https://en.wikipedia.org/wiki/The_Mythical_Man-Month )
Poorly managed projects (usually) collapse if the cost becomes higher than the benefit