by zanny · 7y ago · 0 comments
The sooner you show a finished product, no matter how broken and incomplete, the sooner your client can realize all the things they didn't want they said they did and replace them. If you give them a formal design document it might be ironclad and foolproof but it doesn't put the finished product in their face to scrutinize.
Money doesn't judge. It ends up in the hands of all manner of people. As programmers we want money for time, and the people with the money rarely have the education or willpower to even be able to comprehend a formal design. But they are the ones calling the shots with some esoteric vision locked up in their head we are meant to realize.
As someone who dabbles in art too there are substantial parallels between the two. You sketch your piece and constantly refer back to your commissioner to verify this is what they want. Almost every single step of a painting or animation or music production or anything creative a commissioner will change their mind on it, either because you suggest something better or because they recognize flaws in their realized vision.
Thats where "run fast and break things" even comes from. Making some piece of garbage "sketch" is way more informative to your average "commissioner" than having them write down to every intricate detail their vision for the finished piece. Because like with all other creation those we write code for rarely have the education to understand what they are even asking for. They have this nebulous idea of a fraction of a finished product and you need to basically teach them to see the whole picture along the way.
Until they actually have even a remotely reasonable grasp on what they want all the testing, specs, design docs, etc are wasted because you still don't know what you are actually making. The more endemic problem would be that we still don't have an accurate way to convey the long term value in doing it right once we have a glued together rapidly iterated abomination that now needs to be redone properly. Thats where formal methods I feel have the most value - a developer can produce a formal spec for a near-finished product that, when they always fail to achieve the spec because the money stops when it "looks done" at least the next guy months or years later who inevitably has to pick up and fix this mess has a better idea of the intent than the person paying them would on the repeat attempt.
During the previous meeting one of their highest priority feedbacks was "X doesn't look anything like we want it, we want it to look like A,B,C,D...."
In the meantime I put it on the back burner to work on some other customer's requests.
Before today's follow up meeting I realized I hadn't made any changes to X, first thing they said "X looks great, don't change a thing."
I had done nothing, I double checked and nothing had changed in any way.
I suspect they just needed time to use it a bit and then they realized that it was in fact what they had asked for months earlier. Fortunately we were moving that customer into exactly the phase of "no changes, you use it for 6 weeks then tell us what you think".
It seldom does.
> Your hobby website could take-off to be an income and then a company and have leftover code all around.
When it provides you with an income, you can justify spending more time on refactoring, tests and correctness.
Hey you don't have to go to these special cases. Amazon, google, Microsoft all do Formal verification (or have started somewhat sophisticated testing) of their critical pieces of code as a bug in them even if it causes an hour of downtime will cost them in millions.
Look at fuzzing. No one did fuzzing a decade ago. Since fuzzing became cheap (i.e. due to cheap compute and somewhat due to cloud computing) everyone does fuzzing on pieces of code which remotely appear to be critical.
Even testing. When cost of running a program was high people didn't write test cases. They hand checked programs for bugs.
But since these circumstance aren't common [goto: very eloquent GP].
Aviation also doesn't really use FM, but that's because they follow DO-178C, and that is a scary scary standard.
Also, a little nitpicking in your write up but you should have also talked about type systems. They carry the spirit of formal methods but rather than being construct then check for correctness, are construction is correct by default. Type systems are widely accepted and show that some of these ideas can gain traction.
Adacore had a white paper, "Testing or Formal Verification: DO-178C Alternatives and Industrial Experience" that naturally I can't link because I'm on mobile.