by java-man · 7y ago · 0 comments
if one launch fails, we've got a backup. if both launch, we have two instruments deployed.
why don't we do it??
However, at the very low rates we're talking, everything is (damn near) hand-built. Economies of scale don't kick in until higher volumes.
Given the length of this project, I wouldn't be surprised if at this point NASA couldn't order a second one built even if they wanted to.
The unfortunate thing about advanced technology is that if you don't use it, you lose it. More specifically, you lose the research and machining setups and people with knowledge about them in their head; the main problem here being that documentation doesn't capture everything - a lot of tacit knowledge is captured in e.g. tuning of the machines, undocumented fixes made on-site, idiosyncrasies in manufacturing steps, etc.
One does not even need to consider economy of scale. For example, if the R&D is $1 million, and manufacturing one mirror costs $100k, the total price for two mirrors is $1.2 million vs. $1.1 million for one.
Plus, consider a non-zero probability of a launch failure.