They are quite simply awful, way over capacity, bad facilities, and also pretty inconvenient public transport links (Tegel especially). I honestly would rate both of them poorly if they were regional airports. Indeed, you'd be hard pressed to find a regional airport anywhere in Europe as bad as these.
It makes flying in and (especially) out of Berlin pretty inconvenient, particularly internationally where you need to do a short hop to an actual European international hub airport to even get a direct flight to most places (only direct long haul flight I ever got out of Tegel was to Abu Dhabi - to US, Latin America, etc, all needed connections first).
To be fair Berlin has a unique culture as a capital and it's not your typical 'capital city' experience, but this is just basic infrastructure and really, really should be there. You pay a lot of tax, after all.
The building is very old of course and you can see that it far exceeds the capacity for which it was planned, still in terms of convenience it's hard to beat, and I'm not looking forward to having to fly from BER sometime in the future (though I'm pretty confident it won't fully open before 2025, if ever).
This allows you to arrive at almost the exact moment the gate closes because there will be no passengers for other flights in a queue with you. The gate agents can even see you going through security and will wait for a minute or so.
Quite frankly New York has a similar problem. There is rail service to JFK but requires an extra cost ticket and it's a fairly long trip (moreso if you're taking the subway instead of LIRR). I'd be willing to take a bus if it got me there quicker for less money. Yeah, Newark has rail (but it doesn't run particularly late).
Instead of using some sort of announcement system employees would just yell at people at German, so once I had to yell back at them to speak English.
Just 2 things to remember from Tegel, by far the worst airport I've ever been to.
It turns out the airport hadn’t assigned a crew to unload the plane, and Lufthansa sent an entire plane’s worth of checked luggage to Reykjavik. Cue the whole plane having to be processed through lost luggage. That’s was a long day.
That seems odd. Would a German do the same in the US?
It's among the worst airports, but still my favourite. Super fast public transport from center, with a cheap ticket, and fast security throughput. I need to reserve much less extra time for Tegel than any other airport, and side expenses never exceed the price of the flight itself (which can easily happen at many other European airports).
Depends where in the city you need to go to. Ostbahnhof to Schönefeld is 16 minutes with the RB 14, 17 minutes with the RE 7. A vastly better experience than the TXL bus which is often crowded.
Rather than building new airports, we should be making flying significantly more inconvenient, to discourage this cost to the environment.
This is false. Both are accessible with a trip on the metro U7 (which cuts the entire city NW<>SE) plus a tiny/short (depending on the airport) bus trip.
We're talking about 30/45 minutes, the large part of whom is on a very frequent metro line. By airport connection standards, this is very convenient (besides being cheap).
> awful, way over capacity, bad facilities
"awful" doesn't mean anything in this context.
Capacity is not so immediate to assess. While terminal C has a standard structure with two security checkpoints, terminal A has checkin and gates directly connected, which makes them very efficient (checkin queues develop in a corridor, essentially, but due to the checkin/gate efficiency, they don't last long).
Facilities are not "bad" - they're not modern, which is different (ie. computing stations). This is obviously a pain for people who need to be plugged 24/7 to a socket, but there's plenty of airports with an old structure.
If you take a taxi or rent a car to Tegel, it's extremely convenient.
It won't go to Tegel, but might be extended to the BER!
https://www.morgenpost.de/berlin/article215847355/U-Bahn-Der...
You are thinking of the U6 though (see linked article)
Facilities-wise I was talking about lack of seats, lack of spacious and modern and frankly sometimes clean bathrooms, lack of sufficient staff doing things like passport checking and security, lack of physical space for movement of people through the airport, lack of food/drink and shopping quality and variety, particularly past security. All of these apply to both, with Schonefeld being noticeably worse on every point.
Capacity - All I can say is that at both, there are slow-moving queues of people at gates that restrict the movement of people trying to get to other gates. There is more throughput of people now than the airports were designed for - they're tautologically over capacity - if they weren't then this wouldn't happen, as it doesn't at most other airports.
Public transport - this one's subjective and depends on usecase, and I'm not claiming it's terrible. It works, and sure it's relatively quick. But it's exactly those connections (from Tegel) that bring the inconvenience for two reasons - the first is that it's more difficult to navigate to the center having to make connections if you don't know the system (i.e. for tourists). The second is if you have heavy luggage - it's really not convenient at all to lug bags onto and off of connections, especially buses. If you're a local who knows the networks and you're doing a short flight with hand luggage, I agree that in that usecase it's fine.
---
A bit meta now: I think it's amazing and I'm genuinely pleased to see that you're not only disagreeing with my opinions, but coming to the defence of these airports and outwardly saying they're really good, along with other commenters. I worded my original comment quite strongly and matter-of-factly because I honestly thought that 'everyone' would hold broadly the same views. Anecdotally, I've never talked to anyone living in Berlin who disagreed with me on any of this, and I've never imagined whilst being in either of these airports that anyone else there could be thinking 'this is great'. I'm amazed to see how wrong I was, and I love to be exposed to the breadth of opinions that exist out there, through forums like HN, just because the scale of the internet allows them to surface. Always love to have a good debate about such things, it makes me remember the counter points I'm overlooking and/or discover new ones and rethink my original opinions a bit.
It sure feels like a bygone era. A luxury in the small. Like cheating out on all the hateful things about flying. Exit the gates and enter the city.
It's understandable that it won't last, but until then anyone can get a taste of how convenient flying must have seemed when you weren't shuttled out to a remote location and held for hours in a Gibsonian dystopia without the tech until finally left to move on.
As a result, air traffic is somewhat low with about 33 million passenger p.a. Heathrow alone gets almost three times as much.
The reason for having two (and, previously, three) smaller airports instead of a single, large one are obviously historical: both East and West Berlin each needed their own. In those times, traffic was even lower because few people in the East ever got to fly, West Berlin had basically no industry or business that was not exclusively local, and the population of West Berlin tended to be somewhat poorer as well.
When I was living there I'd always try to fly to Fiumicino because of that. I can't imagine what impression it must give to tourists on their first trip to the city.
Whilst we're ragging on Schönefeld, my least favourite part is having to walk through burger king to get to the departure gates.
This is part of Berlin's unique culture, though, isn't it? Usually, the capital cities aren't also average to below average in living costs, which Berlin is. Berlin isn't convenient, Berlin is dirty, raw and cheap.
It’s still not quite SF or NYC or London prices, but it is much more in line with the rest of Germany now.
It's been my impression from the two or three times a year that I'm in Berlin for a few days that it just works very differently, there's a trade-off between cost of living vs convenience that people accept when they move to Berlin. It's dirtier, a bus or train may just break down, people are generally a bit more rowdy, and you don't expect much from the administration, but then again: you pay a lot less, so it's worth it, like a hostel compared to a hotel.
https://www.statista.com/chart/15738/the-contribution-of-sel...
https://qz.com/753244/berlin-is-the-only-capital-city-in-eur...
Berlin is quite a unique capital in that it's relatively poor and contributes relatively little to the national economy. Apart from its size warranting certain infrastructure with sufficient capacity, it'd be surprising if it had much better infrastructure than it does. Its economy doesn't easily allow it.
Berlin can be cheap relative to other capitals (though this is getting less true) but the extent to which that's the case depends on your personal choices.
Public infrastructure is another matter because it serves everyone and everyone contributes - there needs to be a minimum bar. And yes, if I pay the same taxes as everyone else, I want a comparable level of service and convenience in my infrastructure to what people in the other cities get.
The taxes aren't the same as well - local infrastructure isn't a federal issue, so federal income tax doesn't pay for that. Berlin's tax factor for companies (a major part of local taxes) is 410%, compared to Hamburg's 470%, Munich's 490% or Cologne's 475%. Berliners have decided to go with lower taxes to attract companies away from other cities, so Berlin has less money to spend on public infrastructure, even though Berlin gets a lot of subsidies from other states (2-3bn/year).
It's really the worst airport I've been to and as you say makes the whole situation a lot worse.
It's less than 500m to the terminal A.
If one's really bothered by this (d'oh), they can take the U7+bus, which ends in front of terminal A (in addition to being much more frequent).
As an American I rather liked Tegel (and the cute little I [hexagon] TXL bumper stickers I'd see periodically). It's small, and I imagine when things go wrong they'll go really wrong. Although I'm somewhat used to that at SFO with the fog, I'm glad I missed the German Air Force crash at SXF by a day or two since everything to diverted to TXL. Compared to London City there was dramatically less walking at Tegel and the public transit connections were better. While London transit will accept NFC payments, Berlin requires an app (albeit one of the best transit apps I've used).
The only airport that I've visited that really stood out as being awful was Amsterdam. It took about three miles of walking to get to the gate (from the "airport" Hilton), there was absolute chaos between the security checkpoint and passport control (wall to wall passengers, no indication where the lines started or ended, no airport staff, etc), and Americans flying Delta (but not KLM) get singled out for extra interrogation at the gate. God forbid you want to buy a train ticket.
Game over
For example, an airport has very carefully designed zones: land-side and air-side (after security), Schengen and non-Schengen (after immigration), staff and non-staff, etc., that must be separated. It also has carefully considered passenger flow, escape routes, fire sprinklers and smoke vents, etc.
Then, after all is agreed and construction had started, the airport company requested much more space for retail. That's obviously going to lead to problems.
One thing I must say, though: I am glad that the officials responsible for fire safety are not afraid to deny certification. There was a fire at DUS (Düsseldorf Airport) in 1996 in which 17 people died. So, good job in standing up to the immense pressure.
https://en.wikipedia.org/wiki/Düsseldorf_Airport#Düsseldorf_...
> One simple problem, bizarrely enough, was the airport architect, Meinhard von Gerkan's, dislike of shopping.
> Joel Dullroy, a Berlin-based journalist with Radio Spaetkauf, who produced a podcast telling this airport's story, says Mr Gerkan wrote disdainfully about passengers "dragging around unwanted bottles of whisky like a beggar" and wanted to have as few airport shops as possible.
> But when the airport company realised this - very late in the day - it insisted on adding whole new floors of shopping into the design, as the company now makes up to 50% of its revenue from retail.
No. That was not the problem. The problem was that they did not properly supervise the architect. Architects are artists. They always have some bias one way or another, some little opinion on how things should look or work. They need to be watched. It was someone's job to ensure that architect's "vision" matched the customer needs. That person should have realized the error and halted proceedings long before breaking ground on anything.
When you don't watch the architect you get things like this: https://www.atlasobscura.com/places/penis-shaped-church
Sorry, I don't see how that story is relevant to your position.
An architect not delivering on some basic requirements is one thing, not necessarily because they are artists, because art will always only be a part of architecture. Delivering that is completely disconnected from it's use case is simply bad architecture.
Making a major change to a plan half way through is a good way to piss off any designer or engineer though. Especially one as massive and all-encompasing as a huge airport, railway, and hotel complex + retail shopping center. I'm curious how much that had to do with them dragging their feet, in a huff, out of ego or whatever. I doubt the architects simply 'hates' shopping, or maybe they do and didn't know that was a requirement before going in deep into a project.
But somewhere the communication broke down and relationships deteriorated.
In an operational airport this complexity still exists and major airports are in a constant state of flux. They are always building something and there are always contractors on site doing construction or maintenance. The difference is that it can be treated as an incremental improvement. No one can pretend that the entire system will be optimal first time. Of course the requirements will evolve.
6 billion euros is $6.83B. That actually sounds like a bargain for a brand new airport with 2 runways.
For comparison, Heathrow's 3rd runway is estimated to cost £18.6B.[1] That's $23.6B for just 1 runway.
LAX renovation has a projected cost of $14B [2]. That's $14B just to "improve the design, safety and efficiency of the airport." No new runway will be built.
Hong Kong Airport 3rd runway is expected to cost HK$141.5B [3]. That's $18B for 1 runway.
[1] https://en.wikipedia.org/wiki/Expansion_of_Heathrow_Airport
[2] https://www.gobankingrates.com/making-money/business/lax-air...
[3] https://en.wikipedia.org/wiki/Hong_Kong_International_Airpor...
Given that, “for just 1 runway” feels unfair
You added some really valuable context but it doesn’t detract from BER being relatively inexpensive compared to other airport projects.
But it does incorrectly describe BER as a "brand new airport", where the reality is: "The northern runway of BER is the southern runway of the old Schönefeld Airport and has been in use since the 1960s." (Wikipedia) and also it's a single terminal. At this point, it's then very similar to the Heathrow project in what's being delivered, except for the added context I gave.
British government in requisitioning other people's land shocker.
And there's also Hamburg's Elbphilharmonie: https://www.ft.com/content/d59a5164-d41d-11e6-9341-7393bb2e1...
Basically boils down to: If politicians get to call the shots in any way, it's going to run way over budget. Pretty much every single time.
Most recent example was the bridge deconstruction in our small town. It was supposed to cost 80k Euros to completely deconstruct it. Actual cost was 150k and we have the pillars still standing around. It's just business as usual here in Germany.
This is nonsense. It's just that infrastructure projects that get delivered on schedule and on budget (or somewhat close to that) don't make for equally pretty HN headlines.
There's a lot of public infrastructure around. The vast majority of it was commissioned by politicians. The vast majority of it is just there, mentioned a few times in the local rag before commission and upon opening and that's it.
Sure, I wouldn't be surprised if public spending is more often out of budget or behind schedule than private spending like you suggest. But even then, Berlin Brandenburg is an exceptional case and suggesting that excesses like it are inevitable when politicians were involved is just nuts. There's plenty of competent politicians.
If it involves different political parties or governments (like BER, which had politicians from Berlin and from Brandenburg involved, both local and state, and the federal government too to some degree) then it gets even worse, a lot worse.
So projects merely commissioned by politicians usually do better (go over budget because of the moronic public bidding process, but that's a different issue), while projects not just commissioned but overseen by politicians do far less well.
Of course, because the most of the press doesn't do it's job. Here is a more banal example about public bathrooms in New York: https://www.youtube.com/watch?v=XfAE5emMCs8
>Berlin Brandenburg is an exceptional case
No, I wager is the rule.
Which you "proved" by carefully selecting a single anecdote?
https://nl.m.wikipedia.org/wiki/Randweg_Eindhoven (Google translated: https://translate.googleusercontent.com/translate_c?depth=1&...)
Yet just about every IT, aircraft and building project etc in the private sector comes in on time and under budget. Oh, wait, it barely ever happens there either!
Maybe it's large projects per se then. Maybe there's added risk when politicians and private sector interrelate.
A better approach would be to do what's done more in the tech industry - decide a project needs to be done, then allocate it a permanent percentage of total revenues with close supervision of the details, until it's completed.
I do not think so. There are plenty of previous examples with enough similarities to estimate costs to +/- 20% at most, usually better.
A bigger problem may be that quoting wildly optimistic price is more likely to get a public project started, even though most parties understand that the actual budget and time will be very different. But as long as the project takes a long time those who gave original estimates / started execution have plenty of chances to move away. And then "well, when I was running it, things were different" is a decent defense.
I think the modern tendency to seek cheapest bid, rather than best value, makes it far worse. In trying to save money time and again they end up spending far more...
My son talks a lot about a study that showed optimists badly underestimated how long a project would take. So did pessimists, though their estimates were less egregiously wrong.
Basically, if people are involved, you can assume that budgets and time estimates are hand-wavy, ballpark guestimates at best.
Life will get in the way. Even people who truly understand that will fail to accurately predict just how much life will get in their way.
80k for a project that likely consists of months of filing for permits, coordinating tens of people and machines? Sounds like a joke.
>After the prescribed date, the bids are opened and assessed, and either the "lowest cost" or "most economically advantageous tender" is chosen. The contract award must also be reported in the OJEU and be published electronically on Tenders Electronic Daily ('TED'). [1]
It's difficult to choose the best offer if you are legally obliged to choose the cheapest one. This has led to a situation where all companies have to make cheap offers. The only way to make money is by invoicing bills for unforeseen work that wasn't covered by the original offer.
The irony of the situation is that there was an offer by the industry to build the airport for a fixed price. But Berlin chose to build the airport by themselves because that was supposed to be cheaper.
Well, Athens chose the other way: [2]
> However, after delays and slow development, the project was revived in 1991 with the then government launching an international tender for the selection of a build-own-operate-transfer partner for the airport project, with Hochtief of Germany being selected.
>In 1996, Athens International Airport S.A. (AIA) was established as a Public–private partnership with a 30-year concession agreement.[1] That same year, the €2.1 billion development finally began with an estimated completion date of February 2001. The airport construction was completed five months before schedule, but was delayed opening a month due to surface connections to Attiki Odos not being completed. The airport officially opened on March 28, 2001.
[1] https://en.wikipedia.org/wiki/Government_procurement_in_the_...
[2] https://en.wikipedia.org/wiki/Athens_International_Airport
It's a known problem no one seems to care about. The Swiss do it better: They throw the cheapest and most expensive offers out and pick a contractor from the middle price range. Seems to work well for them in most cases.
> 80k for a project that likely consists of months of filing for permits, coordinating tens of people and machines?
It was a small bridge for pedestrians and cyclists that was closed about 5 weeks before they took it down, which took the crane just a couple hours.
It was a project as simple as it gets and they still went way over budget while also leaving half the bridge standing. I just wish I could say this was an outlier, but it's commonplace around here.
So it’s not a surprise that we find counter examples in strong democracies. The Gotthard Basistunnel was build faster than projected and about 30% cheaper [1].
I think we are just bad at estimating costs and time.
I don’t think it’s a problem with government. If you want these sorts of public good projects built, you need government to do it. Government doesn’t have the same incentives that private business does, and there are positives and negatives with that. A profit oriented organization would never have taken on projects of this scale.
I'm reminded of that $2M bathroom at a public park in NYC.
This is the video. There's some libertarian editorialization, but the facts themselves are solid. https://www.youtube.com/watch?v=XfAE5emMCs8
> And some have even turned this black humour into a business opportunity. Philipp Messinger and Bastian Ignaszewski have invented a board game based on the Berlin airport disaster. The main object of the game is to waste as much public money as possible.
> I pick up a card saying some of the escalators from the train station were built too short, needing very expensive additions. "Everything on these cards," Mr Messinger says, "has really happened."
The manner in which this all unfolded is however a completely different story...
Not sure it is all just about regulations.
1. Very late in the design process
2. After construction had started (!)
I mean, politicians or not, the moment you start making major changes during buildout you’re going to have problems, regardless of what you’re building.
> Joel Dullroy, a Berlin-based journalist with Radio Spaetkauf, who produced a podcast telling this airport's story, says Mr Gerkan wrote disdainfully about passengers "dragging around unwanted bottles of whisky like a beggar" and wanted to have as few airport shops as possible.
> But when the airport company realised this - very late in the day - it insisted on adding whole new floors of shopping into the design, as the company now makes up to 50% of its revenue from retail.
Yeah, that's gonna do it.
EDIT: </satire>
<h1>No.</h1>
but it appears surprisingly detailed and well-researched.But it IS a pretty good summary of the (publicly known) status.
Yet at its core, an MVP of an airport would be a runway with a building next to it + fuel and security services. It baffles the mind that this can be such a shitstorm. I can only perceive this to be bikeshedding at a national scale.
The big deal is that there is a lot of technology in there which now has to be replaced because it is reaching its end of life without ever being used.
The big deal is that this is a waste of taxpayer money. If this was privately financed I wouldn't care either but it isn't. At this point whoever is working there is just milking us.
ohthehugemanate posted this link and suggested reading the bit on construction delays. If this sort of stuff is considered normal in the industry, that is a big problem. https://en.m.wikipedia.org/wiki/Berlin_Brandenburg_Airport
* The fire response system wasn't just broken; it was never built. Siemens (a small/medium sized contractor according to the article) is "still waiting for paperwork" to deliver the software for the smoke suction system, based on hardware which was never even designed.
* The ventilation system turned out to be impossible. The architect didn't want ventilation ducts on top of the design for aesthetic reasons, so air was to be ducted and blown down, and out to vents on the airfield. Pushing warm air downwards many meters is generally not a trivial ask.
* turns out the architect of the fire suppression system wasn't an architect, but only a draftsman.
* The sand lime brick used in the foundations apparently necessesitatss replacing big chunks of foundation, cabling, and concrete.
* The windows wouldn't open when the weather was above 30 degrees Celsius (about 80 fahrenheit). It's 36 in Berlin today.
* 80% (!) of the doors just didn't work as of 2017.
* For the opening in 2012, there were no ticket counters and the escalators did not work.
* Three rounds of bribery and corruption charges in the project leadership
* 5 different project chairpeople and presidents
* By 2017, there were still major problems with smoke control, sprinklers, fire detection, sirens, emergency bulbs, and similar critical systems.
* Big parts of the cable ducting was not waterproof, and now about 700km of cabling needs to be replaced.
* 600 fire protection walls have to be replaced because they were made out of the wrong kind of concrete.
* They had to halt construction at one point because the main roof was going to collapse due to structural issues.
* The railway station serving the airport (built by Deutsche Bahn), and the tunnel to the airport (built by the airport construction company) were incompatible and had to be adjusted.
* When they finally simulated a fire situation (2017) they discovered they needed way more water than was planned for the sprinkler systems... Which therefore needed to be replaced.
The official scheduled opening date remains October 2020, but several official letters have called that info question. Certainly no one in Berlin expects it to open then. It has been delayed 10 times so far.
This is not just bureaucratic bungling. This is incompetence, corruption, mismanagement, AND bungling. Anyone on HN who has a contracting background can tell you: no responsible or capable project management would touch this steaming dumpster fire at this point. It has more warning flags than cabling problems, and that's saying something.
Really, read the Wikipedia section on "construction delays". It's very entertaining:
Is there an issue tracker specific to physical engineering projects?
I'm not sure what architects and engineers use for issue tracking, but they use Procore during the build phase for product submittals, change directives, change orders, RFIs, etc. These are all standard things laid out by the standard AIA contracts.
[0] https://en.m.wikipedia.org/wiki/New_Central_Polish_Airport [1] https://centreforaviation.com/data/profiles/newairports/new-...
Almost every German comedy series has a jab at it.
[1] it’s harder to work out than I expected.
Yes, and they could meet that standard with 20% less tax revenue, too. There's zero reason that any government needs 42% of anyone's income.
Until they don't. The last major crisis is less than 100 years old.
And it's also just a tiny fraction of a percent of all the things where money is wasted.
> Most of the money is spent on pensions, education, healthcare and other benefits.
Healthcare isn't a federal expense, you'll pay an additional 15% of income (both parts) for that. Pensions are also an additional expense, the federal government only subsidizes it. 12% of the federal budget goes to the military - which looks more and more to be on a similar level of inefficiency to BER.
In Germany they did many times, for all kinds of reasons (mostly fire response).
https://www.spiegel.de/international/germany/berlin-airport-...
> "It has to do with the fact that we haven't progressed far enough with our lighting system that we can control it," Horst Amann, airport technical director, said on Wednesday during a rare public appearance.