by mmarvick · 7y ago · 0 comments
TriMet is currently looking into moving MAX into a tunnel downtown, and with fewer stops [1]. Part of the reason it's _so slow_ right now through downtown is all the stops, and because it has to stop at lights.
[1] https://www.oregonmetro.gov/public-projects/max-tunnel-study