77 points · by fanf2 · 7y ago · 129 comments
HS2 is probably going to be £300+ for a peak return from London to Leeds - yes, I pulled that from my backside, but given when it’s due to launch and the ever-ratcheting fares, I think it’s perfectly realistic.
As to supply and demand influencing pricing - yes and no. While there will be more capacity, existing operators and franchises may or may not take advantage of it, and even if they do, what possible motivation would they have for reducing their prices? They won’t be competing with HS2 on price - if anything, the inevitability high fares for HS2 will provide an anchor for a price increase on the old mainline. The only others trains running on the same route will be theirs, as that’s how the rail franchise system works, so their only competition will be themselves - i.e. none.
The problem at the moment in off-peak times is that they dare not reduce the price because there are trains that run during the day which fill up, and there's no good way of differentiating fares between the ones which do and the ones which don't.
imho, to prepare for the long-term we should be building infrastructure on the ground to reduce short haul flights.
If they were proposing express trains that would really gain the benefit of the line I could see the justification, but they're not are they?
Good one. I can hop on a plane from London to Edinburgh tomorrow for £35 and be there in an hour and a half, call it 3 hours all in. By comparison I can hop on a train and it'll cost me £146 and take about 5 hours.
Hell, just last week I hopped on a ferry to France and back on a whim for less than it would have cost to go 20 miles by train.
Most of the claims in this piece are simply nonsense. The Euston to Crewe train that's mentioned doesn't go anywhere near Birmingham, so it's not obvious that HS2 would make much of a difference to traffic on it.
And even if it did, it's merely one of a large number of routes heading out of London in all directions that are ridiculously overcrowded. At best, HS2 might reduce a small proportion of that overcrowding, but it's certainly not going to eliminate it.
The idea that HS2 can make Birmingham airport competitive with Heathrow for Londoners is clearly wrong. Birmingham doesn't have the flights, the destinations, or the capacity. London also has Heathrow Express for quick train journeys from Paddington to Heathrow - concourse to concourse. Even with a shorter journey time, HS2 can't match that.
And HS2 doesn't start to make sense until Phase 2 is built, linking Sheffield, Manchester and Leeds. You might see some benefits then - but the realistic total cost is likely to be the far side of £100bn. Which is madness.
It's actually five years of the total NASA budget, which is supposed to pay for development of the next Lunar program, as well as everything else NASA does.
It would be much better to spend a much smaller sum making the UK's broadband the best in Europe, set up a world-leading incubator fund for digital startups outside of London, with next-generation training and education, and try to persuade existing corporates to consider home working options. The return on that would be huge.
This is just a giant train set for rail nostalgists.
It's halving the time from Crewe to London from 100m to 50m, so that's a big plus. Every train going to Manchester, Liverpool, North Wales, North West England and Scotland will be an hour quicker - that's a 2 hour saving on a day trip.
> And would the project be cheaper if it didn't need to be so super-straight in order to be able to achieve the high speeds
No, the extra cost for high speed is negligable in the open country. If it's not straight it's using more land.
Seems to me that could increase the housing supply and offset the costs of HS2 at the same time - and most governments have had plans for new towns, new garden cities and suchlike.
House prices near crossrail have risen an extra £133k each (above similar houses in similar places that don't get crossrail).
That's somewhere in the region of £100b.
Crossrail is a massive transfer of wealth from working people to wealthy land owners. It should have been funded entirely by a windfall levy on the increase land value near the stations.
A significant portion (over 30% of the original £17.8b budget) of Crossrail's funding has actually come from land owners and businesses, in the form of:
- Business rate supplements
- Property developer contributions
- Community infrastructure levy
- Sale of surplus property along the route
- Contributions from other non-taxpayer funded entities like Heathrow and the City of London corporation
Much of the rest of the funding is from TfL and loans backed by the DfT, which should eventually be payed back from ticket revenue.
Not that I particularly disagree with you, but I have two friends I'd consider 'working people' rather than 'land owners' who potentially benefit from increases in the value of their homes nearby the Crossrail improvements.
I don't think any such land ('cheap', 'middle of nowhere', '20 mins from central London') exists in the UK.
Or if Quainton is too expensive/green-belt-y, do the same at Wormleighton or Newton Purnell or somewhere else along the line.
That’s like... Croydon distance from London Bridge?
HS2 is designed to run a little faster and if you nixed the stop I think 30-35 miles could realistically be 20 minutes out of London on HS2. That sticks you right in the middle of the Chilterns if you follow HS2's rough direction.. probably not ideal for a town.
Add another 5 minutes, though, and there's a lot of open land just south-east of Oxford and just off of the M40 too..
The open land near Oxford will be open because it's a swamp. If you could build on it cheaply somebody would.
https://www.rightmove.co.uk/commercial-property-for-sale/pro...
Once close to a HS2 station yes it would be £5m a hectare
Nice to know we explicitly provide for land owners to extract rent even when they don't own the land any more.
And the day after this article was written the UK government announces a review of HS2 - probably for rather short term political reasons:
Two stopping trains per hour between local stations is not enough and if any were cancelled or delayed it created hell.
I left partly because the commute to work sometimes took 2.5 hours each way and was ultimately draining. And that was living on the outskirts.
Well of course there is. There's currently 10 trains an hour in each direction that run non-stop through Milton Keynes.
There could easily be an initial service along the lines of
Slow lines
6tph London-Harrow-Watford-Stations to MKC
6tph London-Watford-Hemel-Leighton-Bletchley-MKC
Fast lines 6tph London-Watford-MKC-Northampton
4pth London-Watford-MKC-Rugby-All_stops_TrentValley-Stafford
4pth London-Watford-MKC-Rugby-Coventry-Airport-Birmingham
And I suspect stops at OOC will come too.It’s a high speed intercity line that only has a few stops (compared to a local or commuter service). It can’t provide local services, it doesn’t have the stations or the track to do so. It also won’t be high speed of it stopped every 10miles.
It's less about moving local traffic off current lines, and more about freeing them up to provide local services. You could potentially see something like Bawtry station[2], which is between the two, brought back into service if there is demand, whereas it might not currently make sense to do so as the line's primary purpose is intercity travel.
[1] Not necessarily something that might be affected by HS2 - just a set of stations I know as an example.
[2] Closed in 1959, but Wikipedia notes: "land near the station has been protected should the site be required as a new station, with car parking facilities, in the future as the town grows". The line initially went Doncaster-Rossington-Bawtry-Scrooby-Ranskill-Barnby-Retford, but now only Doncaster and Retford remain.
Some commentators in this post have questioned why the article is called what it is when it is just about HS2. For me I think that the title is apt and I now have so much more clarified. This is a really good article and I finally understand and like the project. Before I didn't give a damn about it.
As for not planning another exit route out of Euston, I'd imagine that there's a significant planning headache in routing new tunnels around the existing infrastructure in and around Euston, and that having the line shadow the existing WCML is much less painful to both plan and develop.
Paddington has had a significant amount of work done to it recently with the Crossrail work going into it. Though it doesn't appear to suffer the access issues that Euston has it may prove to be a headache if HS2 traffic was supposed to arrive alongside GWML traffic.
This article, which is unfortunately now paywalled, covers a lot of the same ground: https://www.independent.co.uk/news/uk/home-news/hs2-logistic...
HS2 is one of those projects that's unpopular across the political spectrum and unfortunately seems like it's under threat, but the arguments in this post make a lot of sense and they're just not being made more broadly.
This map shows where capacity will be unlocked: https://twitter.com/HS2ltd/status/1158403767756316672
And this comprehensively explains why more capacity is needed and a new high speed railway is the solution: https://medium.com/@garethdennis/high-speed-two-and-the-need...
From your article "Yet the story doesn’t seem to be getting through. As engineers, it is not just our duty to create new infrastructure, it is also our duty to communicate its purpose. Helping the British public to get behind High Speed 2 must be a priority for our industry if we are to truly make this megaproject a success."
Translation: shut up and swallow, plebs.
I'd like to know what incremental cost there is for an increment of higher speed - I bet I know the shape of that graph. If you want higher capacity, let me know why longer trains don't work.
New line yes, gouging expense for national vanity, no.
You could go for Ballast rather than Slab, which means lower install costs and slower trains, but also means higher maintenence costs, but the headline price will be lower, even though the TCO will be higher and the service will be worse.
Longer trains don't work because you'd have to demolish the towns that the stations are currently in -- extending 200m north/south at every station between Euston and Rugby is not cheap and will piss off a lot more people than building a quiet railway through an empty area, not to mention all the signal problems and points fouling, and what will you do at Euston?
> I'd like to know what incremental cost there is for an increment of higher speed
The big costs are land acquisition and earthworks, which won't change at all regardless of the speed. Euston is another cost, but you'd have to completely rebuild the station, including putting all the platforms underground, for your longer train plan - and Underground space in London isn't that easy.
So you are arguing against it when you don't know the cost?
Theres also the fact that this route will have competition, against aircraft and cars, ideally it needs to be quicker than its alternatives in order to succeed.
Longer trains probably will increase capacity, but mailing around TB hard drives probably has higher bandwidth than the average internet connection. Good luck selling individuals on that 'upgrade' though.
As a taxpayer, I would much rather the work was contracted out to the Japanese that built the Shinkansen services. But for some strange reason that seems politically unpopular.
Like with Hinckley and various other grand projects I'd rather we taught ourselves how to do it. Only HS2a has passed into law, b&c, HS3 and Crossrail2 are still to come.
The cost of the train can be amazing. I'd like to know what train users will say if offered the choice between 'decent seats' and a decent price.
High costs on the WCML for flexible peak fares are becase
1) The costs subsidise rail elsewhere, like regional networks in the North and Welsh Valleys
2) The price encourages people to take less busier trains
(2) falls down a bit with the hard cutoff, because there's no "shoulder peak" at Euston, meaning that 1840 is empty but the 1900 is really full, but the principle remains.
2. The Caledonian Express also has high ticket prices, yet the service is completely shambolic.
Yes. This is also why the Tube and the NYC metro have such big problems compared to more recently built systems.
A piece of route might have been designed in the 1800s, possibly to a speed limit of 20 or 30mph, then been rationalised and 'upgraded' over the years to a higher speed, but that section of track will still carry limitations that are implied by the way it was initially designed to be, signalling may be too close together, or too far apart, junctions that are rarely used but remain for whatever reason add complexity and potential failure sites, tracks.
There are of course some physical aspects of physically old track - shorter (~100m) sections of rail joined together have a higher risk of failure than the newer techniques of long (0.5km to 1km or more) single track pieces welded together, old wooden sleepers allow track movement that can result in delays and maintenance issues, whereas relative-new concrete sleepers, and really-new split-concrete sleepers are more reliable and permit faster and more reliable train operation.
Tearing routes apart and redesigning the sections from scratch is difficult politically, so the UK's railway network tends to suffer from the fact that 99% of it was designed and built before 1880.
The other dirty not-quite-secret about HS2 is that it's not mainly about high speed. The WCML is full to bursting in some sections, and putting freight, long distance passenger, and stopping trains on the same tracks reduces capacity further. So it's mostly about building a new line. And once you're doing that, it makes sense to make it high speed and passenger only.
https://www.bbc.co.uk/news/uk-scotland-scotland-business-474...
What effect a detour via Birmingham on HS2 has on times to/from Scotland is another question!
"Let's go to Birmingham".[1]
Potentially far cheaper to build and maintain, modern, environmentally better and quicker amongst a host of other benefits and would help make Britain a global leader in transportation.
The Danny in the Valley podcast episode with Dirk Ahlborn was eye opening on the potential benefits and briefly mentions HS2 and Crossrail along with the current SF to LA High Speed rail project.
Smartrail and PRT are designed as a point to point separated-grade network carrying on av. 1 person or a pallette of goods. With a hanging rail you don't need heavy batteries, parking for the vehicles, you can run a pod straight into the factory to pickup goods, and large/rich places can pay to have track straight to their door.
You can prefab the rail and as land usage is just poles in the ground it can be rolled out over fields etc quickly. Track is one-way to eliminate junctions. Pods are on-demand ie. No waiting.
Accessibility improves, you can use the top of the rail to generate (solar) power, run highspeed internet cables in the rail to improve comms across a country, and save on distribution center logistics as you're going point to point.
The last mile may possibly be an issue, but forklift drones and bicycles can take most of the load I feel.
Drivers for this are that it would go fast (200mph+ as light pods so little wear), can go overnight (sleeper pods), you could buy track to your door, personal transport (like a cinema room if you want). The main real issue with cars is that there's a large lobby behind what is a legacy transport solution...
By way of example, UltraPRT has been running flawlessly at Heathrow airport for 10 years, was built on time, on budget, and performs exactly as predicted/modelled.
For more info checkout http://faculty.washington.edu/jbs/itrans/ in particular Swedetrack (https://web.archive.org/web/20060202013014/http://www.swedet...)