by epistasis · 7y ago · 0 comments
If you look back at the history of nuclear construction, at least in the US, late and massively over budget is the norm. Late and over budget are closely tied together, of course, as it's all about project management and that's not trivial at this scale. This sort of typical overrun is why US utilities stopped building more nuclear in the 80s.
https://en.wikipedia.org/wiki/Vogtle_Electric_Generating_Pla...
Another utility canceled a project that was underway in South Carolina.
If the average software project is over budget, late and doesn’t do all the things it was supposed to do on design stage, just think how much more complex these things are.
Thats some revisionist history to fit the current zeitgeist, right there.
What stopped nuclear construction in the United States was the complete overreaction to Three Mile Island and the disaster at Chernobyl
http://ansnuclearcafe.org/2016/02/16/nuclear-plant-cost-esca...
The major regulatory hit that that first wave of US nuclear plants took wasn't specific to nuclear: the Calvert Cliffs decision held that the National Environmental Policy Act applied broadly, including to the regulatory process of the AEC.
https://en.wikipedia.org/wiki/Calvert_Cliffs_Coordinating_Co...
As you and siblings pointed out, nuclear seems to have been frought with problems for a long time.
Wikipedia, if it is to be believed, paints an even more dire picture than you say:
https://en.m.wikipedia.org/wiki/Nuclear_power_in_the_United_...
I find this so counterintuitive having safely operated naval nuclear reactors. More research is needed from me!
Curiously, these sorts of high nuclear costs are not experienced by every country. France's electricity (70-80% nuclear) is a fraction of the cost of Germany's electricity production, while simultaneously emitting less carbon. Countries like South Korea, and Japan (until they cancelled nuclear plants following the tsunami) had cost effective nuclear industries. Cost overruns happened, but not as large as compared to the US. The main explanations for this that I have encountered is that US nuclear plants have tended to be one-off projects, whereas other countries implemented serialized production of a handful of designs. Building 10 instances of the same plant is easier than building 10 different plants.
https://blowhardwindbag.blogspot.com/2011/04/forbes-article-...
Or look at when new projects were started, and you see nuclear starts dramatically fall even before we had TMI and Chernobyl.
The revisionist history is to say that we stopped building nuclear because we are scared of it. The reality is that economics and bad management make it extremely unattractive to build, then and now.
Stop blaming Chernobyl when the truth is clear: the costs of retrofitting most reactor designs to absolve fault tolerance make them inherent unprofitable compared to wind, geothermal, and solar.