by jt2190 · 7y ago · 0 comments
> This may be a great obscure fact, but it is not an example of European regulations gone mad. To keep track of where all the trains are on the Swiss rail network, there are detectors positioned around the rails. They are simple detectors that are activated when a wheel goes over a rail, and they count how many wheels there are to provide some basic information about the train which has just passed. Unfortunately, they keep track of the number of wheels using an 8-digit binary number, and when that number reaches 11111111 it rolls over to 00000000. Any trains which bring the count back to exactly zero move around undetected, as phantom trains.
From: "Humble Pi: A comedy of maths errors" by Matt Parker (https://mathsgear.co.uk/collections/books/products/humble-pi...), page 191.
edit: Added quote attribution.
That's an amusing perspective, but it actually looks like it might be a hardware issue that cannot be patched purely with software, as it arises in the trackside devices that detect passing trains.
I hope the method for verifying compliance with this rule does not suffer from the same problem (it may be moot: a train of 64 20 meter wagons would approach 1.5 km in length; not unusual in some places, but perhaps not Europe.)
It is a bit of a stretch, but Boeing's MCAS problem might be also classed as a software issue 'fixed' with a bureaucracy patch, as the failure to make use of the available hardware to make the MCAS software fault-tolerant was 'patched' with an FAR directing pilots to the existing trim runaway procedure.