by brmgb · 7y ago · 0 comments
Everyone know that the provisioned costs don't make sense. It was pointed by the national court of auditors in 2012 and 2014 [1] and again in a report from the national assembly in 2017 [2]. We are not even taking about puny mistakes. Even the actualisation ratio used is garbage.
[1] https://www.ccomptes.fr/sites/default/files/EzPublish/201405...
[2] http://www2.assemblee-nationale.fr/documents/notice/14/rap-i...
This option leaves you with a few ugly buildings in the middle of nowhere, but the cost unbeatable (even way less than decommissioning thousands of wind turbines).
Aren't you forgetting something? Buildings slowly deteriorate, even if not used. So now you have to maintain the disused reactor, for ... how long exactly?
(Amendment: wind, rain, sunlight, rodents, ... idiots with power tools ... https://en.wikipedia.org/wiki/Goi%C3%A2nia_accident )
And here comes radioactive decays to the rescue! Half-life of Co60 is a little bit more than 5 years, for instance. The important thing to consider is that dangerous radioactive materials are also the ones with the shortest half-life (because the same number of atoms emits more radiation per second), so as long as you took out the fuel[1] you don't have anything really dangerous for too long. It could still be a problem when decommissioning (because you spill everything out in a short time and you have workers just nearby) but if you let the building just decay slowly, you don't have issues.
[1]: the fuel is a bit special, because it has long half-life but it's still dangerous for two reasons. 1) it's alpha emitters, the worst kind of radioactive substance. 2) the concentration is enormous.
Krypton-85 Beta/Gamma 10 years
Strontium-90 Beta 28 years
Iodine-131 Beta/Gamma 8 days
Cesium-137 Beta/Gamma 30 years
Carbon-14 Beta 5770 years
Zinc-65 Beta/Gamma 245 days
Cobalt-60 Beta/Gamma 5 years
Iron-59 Beta/Gamma 45 days
Tritium Beta 12 years
I'm also not sure where you got the idea that alpha emitters are the worst kind of radioactive substance; alpha radiation is easily shielded.
On the other hand, sure, just leaving the reactor there for 50 years may be part of a cost effective solution. https://www.dndkm.org/DOEKMDocuments/BestPractices/26-EFCOG%... (linked from https://en.wikipedia.org/wiki/Nuclear_decommissioning) claims a 71% reduction in decomissioning costs. However, this includes neither fuel waste disposal costs nor future costs for full dismantling at some point.
Alpha decays are still problematic for any material that can by aspirated or ingested. Demolition means flying dust. A leaky building means groundwater contamination. A lot of these substances are also heavy metals, so even without the alpha decay problem they are highly toxic.
Can you keep a building full of alpha sources water tight for five or six half lives?
That's kinda missing the point, the fact is that France's nuclear fleet is heavily underfunded by at least 50 billion Euro [0].
These are exactly the kind of costs regularly externalized or completely omitted when calculating the profitability of nuclear vs renewables [1].
[0] https://uk.reuters.com/article/uk-europe-nuclear/eu-short-of...
[1] https://energypost.eu/how-profitable-is-an-investment-in-nuc...
"This is the €25bn deep geological storage facility for France’s high and medium-level radioactive waste... [France] produces enough toxic radioactive waste every year to fill 120 double-decker buses (about 13,000 cubic metres worth, or 2kg a year for every French person)." [0]
[0] 2016: "Nuclear waste: keep out for 100,000 years" https://www.ft.com/content/db87c16c-4947-11e6-b387-64ab0a670...
Going from first principles, France has 133 GWe of nuclear capacity, and each Gw reactor produces 27t of unprocessed waste a year. France reprocesses used fuel, of which > 95% is un-burnt uranium - this goes back into reactors. Conservative estimate suggest that they produce <200t of waste a year. That's 3g per person! Of that, only 1/5 is real long-lived waste.
There is no industrial process that produces less waste. These volumes are easily manageable.
Check out diagram for what nuclear waste is made up of: http://4.bp.blogspot.com/_VyTCyizqrHs/TCWrO7OFt4I/AAAAAAAAIF...
https://environmentalprogress.org/big-news/2017/6/21/are-we-...
End of life PV panels are one of a million waste products that end up in landfills.
If they were held to the same safety standards as nuclear waste it would require containment; the risk of harm is greater (especially after accounting for volume). PV waste isn't held to that silly standard because then it would be impossible to produce solar panels.
If nuclear waste were contained using the same standard of acceptable harm as solar panels the cost would be a rounding error.
"In an effort to reduce costs, the Energy Department developed a plan to ship nearly 75 percent of the fissile materials in Building 3019, as is, to a landfill at the Nevada Nuclear Security Site by the end of 2014. Because such disposal would violate the agency’s formal safeguards and radioactive waste disposal requirements, the Energy Department changed those rules, which it can do without public notification or comment. Never before has the agency or its predecessors taken steps to deliberately dump a large amount of highly concentrated fissile material in a landfill, an action that violates international standards and norms."
[0] https://thebulletin.org/2014/05/thorium-the-wonder-fuel-that...
https://en.wikipedia.org/wiki/Yucca_Mountain_nuclear_waste_r...
Anti-nuclear activists are right when they say that nuclear energy is politically impossible but only because they're the ones making it politically impossible.
This.
The sad thing is that the article is probably right about nuclear being preferrable over fossil fuels due to relative priorities of global warming vs. nuclear accidents and garbage disposal.
But this cost comparison against renewables is just comically miscalculated.
UK discounted provision for decommission costs: £100+ billion in 2013 https://www.theguardian.com/environment/2013/jun/23/britain-...
£161 billion in 2017 https://web.archive.org/web/20170516093449/https://www.gov.u...
£234 billion in 2018. Costs were so quickly exploding there is a new way to forecast, which dissimulates... err... is more... well... https://www.gov.uk/government/publications/nuclear-provision...
Long-term waste management is another ticking bomb.
Moreover if there is a serious glitch (Chernobyl, Fukushima...), are bets are off. You can obtain an insurance policy for anything, AFAIK even for a space trip, but no insurance company covers such nuke risk.
Those cases don't prove that trains and plains are uneconomical.
Rail, tube and tram lines will still be there and graded 100 years later - after track replacements, roads are not dissimilar, reservoirs and storage caverns far longer with a turbine replacement or two. Nuclear on the other hand has a much more limited life in which to absorb those overruns.
They are still within their financial budget for this project, will maybe overshoot it by a bit in the end. But that's OK, since such a dismantling had no precedence whatsoever, and it was just an estimate and everybody knew that. They will exceed their time budget by a lot, which is also OK, since again such a dismantling had no precedence whatsoever, it doesn't really matter if this thing takes a decade longer to dismantle, and the reason they take longer than initially estimated is that they had to overcome a ton of problems nobody could have known about before and went about their work carefully and systematically. There were a lot of lessons learned from this, which should help with being faster when dismantling other nuclear plants, but and a bit cheaper (maybe at 2/3rds the cost in the future).
With BER on the other hand the date of completion did matter, both politically and economically, and the exploding time and financial budgets were a result of gross incompetence in particular from the politicians that personally kept meddling in the project (it was "prestige" project), complete failure in contractor oversight (which resulted in a ton of defects and also some corruption and embezzlement) and a completely useless project leadership (of mostly political appointments, aside from the politicians themselves, that e.g. resulted in them building that thing without working fire safety).
So the fact that they are simply simpler projects which rarely (never?) have massive overruns due to "bad project management" is a huge financial point in their favor that is rarely factored in.
Tally: Germany 1, France 28
There are many causes, one being that during hot seasons many French atomic plants cannot run at full speed (thermal pollution).
About $650 million budget.
In 2016, They say it is on schedule and under budget. https://www.energysolutions.com/zion-nuclear-power-plant-dec...
They are doing less sorting. They just get a bigger cave and put the entire facility into it. There is room in the large cave for all US nuclear plants.
"French power utility EDF estimates it would cost at least 46 billion euros ($51 billion) to build six of its latest generation EPR nuclear reactors if the government decides to build them"
"the Flamanville EPR reactor under construction in northern France has been plagued by cost overruns and a series of technical problems resulting in years of delays. EDF, in which the state has an 84% stake, said in October the project which began in 2006 would cost 1.5 billion euros more than previously expected, raising the total cost to 12.4 billion euros."
https://www.reuters.com/article/us-edf-nuclear-epr/frances-e...
And because that was expensive, there isn't enough money for decommissioning left, which needs equally massive subsidies [1].
[0] https://www.france24.com/en/20170710-france-hulot-could-clos...
[1] https://uk.reuters.com/article/uk-europe-nuclear/eu-short-of...
The UK's National Audit Office puts the price of one EDF reactor around that once you include the excess price paid on every MWh over the 50 year projected life, and the decommissioning (which is supposedly built into that MWh price). It remains to be seen if it will be correct. From Wikipedia:
The National Audit Office estimates the additional cost to consumers (above the estimated market price of electricity) under the "strike price" will be £50 billion, which "will continue to vary as the outlook for wholesale market prices shifts"
That's $64bn on top of £20bn ($25bn) latest build estimate. A build with such poor worker conditions that it has gained a reputation for suicides.
$89bn would build a ton of pumped storage to underpin offshore wind at a quarter the MWh price.
All of it is down to the creative accounting of the conservative government to demonstrate that they eliminated the deficit.
Instead of financing the construction directly and purchasing the plant as "turn-key" asset, they forced EDF to take a multi-decade loan and agreed a price of electricity decades in the future that would enable EDF to pay back that loan. This doubled or triples the cost.
http://www.bbc.com/news/business-35741772
What's 'a ton' of pumped storage? Thats doesn't mean much. Can it can back up at least 16GWh, the equivalent of a single nuclear reactor's output over night. I have never heard of a project of this magnitude that wasn't just on the drawing board.
Considering Dinorwig cost £425m in the 1980s to get around 10GWh, even allowing for inflation and construction costs rising much in excess, there should be easily enough for multiple times 16GWh from $89bn even with major overruns. Hence "a ton". Probably enough to derive most generation from wind with more than adequate storage underlying it.
Clearly that needs suitable geography for several sites, but considering there were two backup sites within 10mi of Dinorwig should the main site prove unsuitable, and given the geography of the UK those should not be lacking. I know where I would spend my money given the outlook for renewable costs - absolutely not on nuclear. I was once quite keen in my naive twenties.
It doesn't always have to be a populated valley that gets dammed. There's a decent selection of disused quarries, maybe some of the Highland lochs that have potential to create something like Dinorwig at minimal disruption to environment once complete. What I don't know is how those constructions compare in today's money to alternatives. Still, £70bn brings an awful lot of choices, especially when lifespan is indefinite, just periodic turbine replacements.
If the geography isn't available there's the Netherlands project that's pumped storage on entirely flat land. Involves building an artificial lake, with a cavern and turbines below it. Suitable rock for the cavern is quite a long way down, which adds to the cost, but also adds to the head so it should end up with significant capacity. As far as I know it is the first such scheme, so costs are projection only at this stage, but it looks pretty interesting if it turns out to be viable economically: https://o-pac.nl
Or the UK company that has a plan involving winching weights (thousands of tonnes) up and down disused mine shafts. The open question of course is how many of the world's thousands of disused mine shafts are going to be viable. If viable the advantage seems to be very low surface profile.