by latch · 6y ago · 0 comments
I initially put all of the blame on the expensive consultants, that were doing most of the work, for being technically awful (writing software like Fowler's Analysis Pattern book was a holy grail).
While I still think they bear the brunt of the blame, in retrospect everything was awful. The project was both a business and technical transformation at once. There were too many managers, too many business experts and overall poor leadership. Rather than breaking it down into manageable chunks, it just kept growing and growing. There was no concern or accountability for waste.
Sometimes replacing a legacy system with a new system is difficult. But most of the time, it can be done as a slow and steady transition...so long as egos and ambitions stay out of it.
What I've noticed on the ones that work is that they have a core group of technical managers and architects that hold in their heads the whole system architecture and organization. These are people that for more than 10 years decide what will be done and how it will be done. This seems to happen on the more financially crucial and essential areas of the government (e.g: revenue from resources). It is in the more accessory/non-essential departments where there is rotation of technical staff that the chaos thrives.
Profit centers are usually organized and efficient. Cost centers aren't.
If a new-ish web app for a bank or government service has a “maintenance period” where it becomes inaccessible between 5PM and 9AM each day—without the actual web layer going out, just seemingly changing its access ACLs on the data layer—that’s because they’ve got the web app fronting a mainframe that was designed for explicit OLTP ingest / OLAP batch ETL phase separation. The new record event stream gets collated at night to build queriable/indexed tables. Often on hardware so slow that it needs the entire maintenance period to finish building those tables+indices. (This is why better performance in these systems is hard: if you want higher OLTP ingest throughput on the same hardware, you can have it, but then they’ll need longer maintenance windows, so long that they’ll now break their SLAs by being unavailable during business hours!)
I've quasi-blogged at https://old.reddit.com/r/dredmorbius When I do re-start, that will at least get updates.
There's a new blog, I promise, eventually coming to GitLab, likely:
https://gitlab.com/dredmorbius/lair-of-the-id
Or https://gitlab.com/dredmorbius/synopticon
And yes, technology as predicated on energy flux is a principle I've largely accepted. Vaclav Smil's work is singular in this, though I find Daniel Yergin's to be so as well, though that seems largely unintentional / accidental.
It's oil, not money, that changes everything.
(Or at least changed it.)
I feel like there’s something to be said for constructing an architecture entirely out of “formalized” architectural patterns, when you know that 1. you’re not going to be around to explain the architecture to whoever has to maintain the project 20 years down the line, and 2. Anyone who does come onto the project to maintain it is going to have very little time to get up to speed, since they’re very likely on a short contract to implement a single fix (“Y2K compliance” being a good example of when this happened.) At least, if all the architectural arrangements are copied out of a book, you can just put a note in a README at the project root to read said book. Might skip a lot of “software forensic anthropology.”
I mean, that, or heavily document every piece of the architecture, to the point of writing a book on your architectural choices (e.g. the reams of documentation on Erlang’s OTP-framework architecture, originally produced as a side-effect of Ericsson engineers documenting their architectural choices while writing code for their network switches.) But, well, did the customer pay for that? No? Too bad.
(I find this is one of the major differences between the way a regular IT consultancy handles these kinds of contracts, and the way a bigcorp like IBM handles a contract. The bigcorps factor things like “reams of documentation for later maintenance (not necessarily by us)” into their negotiated price, because they’ve been on both sides of that, and also have had customers who have been burned by a lack of it. But this makes their bids higher, so they’re often underbid by novice consultancies who don’t have share this mindset...)
Or the bid has no clause about documentation at all!
That Phoenix pay system was a total cluster that lasted for years. I remember reading headlines and thinking “they haven’t fix it yet?”.
Made the ACA website in the US look like a resounding success. People were literally not getting paid for months (years?) and the gov’ts was like “working on it!”.
One of her coworkers hasn't been paid in almost 6 months.
How many people can go months without a paycheck.
This is Canadian Government Bureaucracy in a nutshell. Decades of (often minor) scandals have caused successive Governments to restructure in such a way that it is nigh-impossible to assign responsibility; and have done so by making it extraordinary difficult to form clear direction and make decisions.
What we need is a massive downsizing of the public service at the managerial level, and begin placing the burden of responsibility upon departments. They need both the power to make decisions and the associated risk of failure; whereas now the decision making power is nigh-ephemeral and the risk is distributed broadly and thinly.
Managers, subject matter experts and consultants are paid by the hour unfortunately, so the incentive is not to deliver the project, but to instead make it take as long as possible.
Of course building up a good internal team inside a government department also seems to be frought with peril, so maybe it's the only option.
When the top 1/3 of the org chart is gonna get fired by the next administration regardless there's no reason (for the current administration) to hold them accountable for not doing good work (not to mention that most people aren't going to be harsh to their own political appointees) and that sort of culture rolls down hill really well.