by gpm · 6y ago · 0 comments
To oversimplify things massively, "how careful do we want to be to avoid testing failures" is a parameter that SpaceX management gets to control. At the extreme careful end everything costs billions of dollars because you're paralyzed analyzing things and double/triple/quadruple/quintuple checking things. At the not at all careful end of things you keep building "complete rockets", pointing them at mars without any testing, and blowing them up. Obviously neither is rational.
They've settled on some parameters that are basically "don't worry that much about test failures, but keep the failures really cheap". They seem to be doing pretty well by doing that. They're experimenting with manufacturing techniques, hiring and training a workforce, building facilities. The prototypes that they are building keep failing, but that looks to be a relatively minor cost considering that the current primary goal is (according to them) to build out the manufacturing processes and make the design easy to manufacture.
Being slightly more careful would undoubtedly reduce the numbers of prototype failures, but would it actually be worth the cost of slowing other things down? Remember that the main cost of this program to SpaceX is engineering salaries, the faster it goes the cheaper it is.
So of course this test didn't go as planned, of course it would be better if it had worked, but would it have really been worth it to management to reduce the probability of this test failing? Like I said, maybe they aren't being careful enough, but I don't think we have any real evidence for that right now and I personally doubt it.
That's just for robotic/satellite missions. It's ten times worse when a manned mission ends fatally.
I'm sorry, but this argument is also mathematically illiterate. Probability only works this way if the events are uncorrelated, but it should be pretty clear they're not.
If the first rocket has a 20% chance to fail it is likely that the second one will also fail due to similar negligence.
Rockets aren't mass manufactured and their fabrication is barely automated. Nobody except SpaceX keeps their tooling online long enough to have correlating failures except for actual design issues which are fixed in later launches. The correlated failure comes from the actual mission hardware but launch schedules are so spread out that a second mission has plenty of time to fix issues discovered in the first attempt.
If rockets, which are made one at a time and launch maybe a few times a year, had correlating failures like you said, no insurance company would cover launches.
I don't disagree but I also don't think it's always as straightforward as probability theory would make us believe. One can imagine situations where a certain amount of QA leads to a certain semi-predictable amount of failures that allows for calculated risks to be taken, but one can also imagine situations where paying 2X leads to better solutions and processes and not paying 2X leads to failure on both the first and second launches.
NASA has its Artemis program which is doing exactly this, returning to the Moon with a goal of a longer-term lunar base.
And they just held a period of application (it closed a few days ago) for the next generation of Artemis astronauts.
Artemis : https://www.nasa.gov/specials/artemis/
So another new moon plan. Another Shuttle derived launcher.
Not surprising that nobody is getting very exited with Artemis.
The SLS and Orion can only be described as dead-weights on NASA since they are so incredibly expensive. SLS has been in development for over 10 years at more then 2 billion per year and it will not launch until 2022 hopefully.
They've been designing Orion for a couple decades now, and the SLS is a shuttle-derived expendable launcher where what we see as key innovations are mounting 25% more SSMEs (still expendable) on the bottom of the fuel tank, extending the SRBs by a couple segments and putting the payload on top of the main tank.
Ares was interesting and we learned, with Ares I, that we shouldn't put humans on top of an SRB. There would probably be cheaper ways to find that out, but at least they tried something different.
1. The risk is different when there are human lives on the line.
2. NASA is publicly funded and if they want to keep receiving funding, they can’t be blowing up the public’s money.
Obviously, there's not much tolerance when human lives on the line. But you don't have to test with humans.
From my armchair perspective I think the risk adversity criticism is justified. NASA should take much more risk even in human spaceflight... in the early stages of platform development. First see if you can build the damn thing and build it repeatedly. Later, after that period, reduce risk and prove out and refine things to the human spaceflight standard. If you jump immediately to, "my God people are suppose to fly on that thing!" well, you're probably going to pay the Russians a lot of money for a fairly long time.
I do agree with you that the political management becomes a real issue. Politicians and bureaucrats are naturally disposed to a certain cravenness about such issues once they get to significant positions of power (senior execs of many companies do, too). But I think a charismatic leader that's out in front of the messaging could pull it off.
They literally couldn't do it, and the admired that they basically can't develop it internally without it costing 10s of billions.
So that's why the used the Commercial Crew program and that worked out for them.
The SLS is a good example, 10+ years of building at a cost far above 20+ billion until the first launch.
2. Dirty little secret: even when NASA uses “startups” like SpaceX to launch and things go awry, the taxpayers are still on the hook for the majority of the loss because the Agency is self-insured
I do have some hints that it's probably more or less where SpaceX wants it to be, some hints that they have chosen this parameter rationally, and some faith that they aren't stupid. For instance, Elon often discusses future tests failing as acceptable, they've declined to put in place more stringent QA efforts, they're still mostly building the hardware exposed to the elements, Elon has discussed that currently their approach is building a lot of starships to iterate on the manufacturing methods and to help them make an easy to manufacture design - he has signaled fairly clearly via his tweets that actually flying the "ships" is secondary, and so on.
My prior is that the parameter is as likely to be set as too high as too low. The testing failure at this stage in development is weak evidence that it is too low, the rest of the information I've just talked about is more convincing evidence that it is an appropriate value or too high, hence I think the post I responded to is "probably wrong".
An example of where I think the level of caution was probably too low (or there were other issues, but let's pretend for a second that this is the only knob management has, as I said it is an over simplification) - the recent CST 100 orbital flight test failure. That test was intended to demonstrate they were ready to fly humans, instead they suffered a series of serious failures, failing that sort of test is pretty strong evidence that they weren't careful enough. They've indicated this type of failure was unexpected and that it will cost the company slightly under half a billion dollars, which is also pretty strong evidence that they weren't careful enough. Moreover I know that they neglected to use procedures such as end-to-end software simulation that would have reduced this risk, and that they were in fact contractually required to perform. Meanwhile I don't have any real evidence that they were careful enough with regards to that test. So starting with the same prior as above, I quickly fall to the "they probably weren't careful enough side".
> Or was at an optimal point for SpaceX in general
The optimal point is definitely not a global value for all of SpaceX. Human spaceflight programs have obviously set it very high instead of very low. As they progress from experimenting with manufacturing to flying payloads it obviously gets turned up. Etc.