> During planning, everyone understood that the estimates were _estimates_. Tasks could take longer or shorter, that was OK and even expected. The goal was to improve velocity, not to accomplish every story, every time.
> Engineers felt comfortable taking stories in areas they knew nothing about. A stated goal was that every engineer understand every piece of the project.
> Standups were team only. Engineers felt comfortable saying they got stuck or needed help or got lost in a rathole and didn't make the progress they hoped.
> Demos were important so that the team and the clients could understand what had changed and what new features were available.
But it quickly got lost - managers and PMs and Directors got involved and Jira boards became published for all to see. (In the beginning it was whiteboards and sticky note). Standups and Demos were all about self-promotion. No one ever wanted to take on a task they weren't 100% certain they could do. If a task was 3 point it needed to be done in 3 days or there would be questions.
When I left the last company it had gotten outrageous. Every task should be completed in three days and in production in five days - and if not that team was Doing Something Wrong.
( We were told that this was standard FAANG practice, I have no idea how true that was )
What happened was what you'd expect - shortcuts, tech debt, unit tests cynically design to pass and meet code coverage expectations instead of actually usefully testing.
The reality is that any process is going to fail one senior leadership decides it's a way to evaluate engineers, not create a good product.
I've come to believe that that main driver for Agile adoption has come to be something similar. Making visible to outsiders what software development teams are doing, and making progress (or it's lack) visible to management. I thinks that's a completely reasonable expectation. Businesses are paying exorbitant salaries and providing ping pong tables, why shouldn't they have visibility into what's being done?
Where it becomes toxic is in areas this posts parent indicates; posturing, one upsmanship, pressure to perform. Effective teams need "safe spaces" to learn, discover, try and fail. Agile isn't that anymore. Hasn't been for a long time.
Businesses are paying market rate salaries to employees who generate them revenue. If anything engineers should be the ones questioning the exorbitant compensation and perks at the top of the org structure.
> why shouldn't they have visibility into what's being done?
Because they shouldn't be micromanaging. They should be setting high level goals and expectations and giving teams autonomy and trust. Intrusive surveillance and low level metrics create perverse incentives that detract from those high level goals.
You use this argument to defend engineers but then question c—level executive salaries. The exact same principles apply but at a multiplicative level.
That’s simply not true, workers and managers are qualitatively different. There are no shortage of examples of managers of companies losing money and marketshare who nevertheless are paid bonuses every year then leave with a golden parachute.
Why? That multiplier is often what's at issue, and why "the exact same principles" don't apply.
There's an earlier version attributed to Mohammed - "Trust in God. But tie your camel first." - so the sentiment has been around for a while.
It feels like it's just a way of reducing cognitive dissonance, which is useful I suppose, but I wish people wouldn't use it because it allows a feeling of resolution without a real resolution of the tension between trusting and verifying.
I'm not saying agile is the right solution, (it probably isn't), but expecting higher-ups to fund a black-box team is kind of naive.
"This just became a JOB..." -Gilfoyle
[1]https://www.youtube.com/watch?v=oyVksFviJVE S01E05 Scrum scene
I do like Agile, it's the typical problem of managers misusing it to micromanage, engage in useless metrics etc.
Reporting on random internal stuff instead of the actual problem at hand is the #1 problem I see with corporate reporting, everywhere. I see various combinations of people wasting time measuring:
1) The thing that is easy to measure, typically money or time.
2) The things they "understand", typically people for HR, compliance for legal, money for finance, etc...
3) The things their manager wants to know, no matter how irrelevant that is to executing their own job well.
Meanwhile what they should be measuring is the qualities of the end-product or the overall external customer end result.
It doesn't matter one iota if Bob the Developer Guy missed an internal 3-day deadline that John the Manager made up on the spot if the end product is a winner in the market and makes the users ecstatically happy to part with their money.
This happens everywhere, with everybody. For an IT-centric example, the common one I see is:
Helpdesk: "The users are complaining that the app is slow"
Admins: "The load is only 10%, but fine, we'll add more capacity!"
Helpdesk: "The app is still slow!"
Admins: "The load is only 5%! They should have no reason to complain!"
Do you see the issue? No, seriously: do you? Because practically nobody does, in my experience. Take a minute.
What happened here is that the admins measured the thing that is easy for them to measure: the load. There's a cute little bar graph in VMware, or a chart in their network appliance, or whatever. What they should have been measuring is latency from the end-user perspective, but that's hard to measure and practically no product tells you this number out of the box. So their entire process, their reporting, their troubleshooting, their forms, requests, everything becomes focused on the thing that they can see and control. Even if it's pointless, ineffective, and basically a waste of everyone's time and effort.
This happens with developers in exactly the same manner. Software quality is stupid hard to measure. Long term supportability is borderline impossible to measure without a time machine. Technical debt is hard to even explain to a manager, let alone keep tabs on in terms of numbers. So what's easy to measure? Time! Deadlines, sprints, release dates, etc... That's super easy.
That's why inevitably the unimportant internal time metrics become critical to everybody, but the actually important metrics aren't even measured and become invisible to management until it's far too late.
Nowhere is this more apparent than the so-called Hackathon, where you do days of overtime in exchange for a few slices of pizza and worse, are expected to be grateful to management for providing the opportunity to do so! Nothing infantilises the profession more.
Granted, one can filter out 99% of product ideas on a whiteboard but the remaining 1% is still enormously huge. And that 1% is actually the stuff that nowadays gets started.
What about the value of those who cooked your lunch? Without them, software engineers would starve and die, so that makes them have far more value, no? Do you think that food service workers are also underpaid?
Now contrast a Facebook programmer, who in one hour might be able to fix a bug that has been annoying 0.1% of Facebook's 2.5 billion users, causing them to be frustrated rather than delighted for, say, two minutes a day, for the next three years before the feature gets rewritten. Maybe that sounds trivial, but if so, shut up and multiply: 2.5 million hours of delight per month for 36 months gives you 90 million hours of delight, for the same hour of work.
So, at a rough estimate, then, the gourmet hacker is 1.5 million times as productive as the gourmet chef. Maybe if I've been overoptimistic it's only a factor of 100,000 or 10,000, but it's huge. And that's how Facebook can be profitable at all despite all the shitty and stupid things they do: capturing even a tiny fraction of the value they produce makes them wildly profitable, as long as they can successfully externalize the harm they do. Some software companies don't even need to externalize their damages.
And that's why software is eating the world.
That isn't the only reason hackers get paid more than foodservice workers. No business is going to pay more for its inputs than it is forced to; that reduces its profits. Hackers also enjoy a dramatically better bargaining position than most foodservice workers, because a hacker with US$3000 has a better BATNA than a cook with $3000: the cook is going to be trying to sell $3 burritos out of an Igloo ice chest outside of concerts while the hacker can buy a laptop, bring up a couple of VPSes on AWS, and spend a few weeks putting together a useful web service, maybe get a few dozen to a few thousand users, but at any rate can easily scale to hundreds of thousands of users. The cook is dependent on someone investing a few hundred thousand dollars (in the US) to have top-quality tools and a good location. Difficult to do yourself unless your family is rich or you graduated from the Cordon Bleu.
This is purely factual reasoning, so it cannot answer normative questions like whether it would be ethically better to pay hackers more or less. It only purports to explain the chains of cause and effect in the world that give rise to that situation, and illuminate the other possibilities inherent in the current state of affairs, and how they might change.
Software engineers are perfectly well capable of making a sandwich themselves, bringing a packed lunch, or surviving on an empty stomach for a few hours until they get home. Not to mention buying lunch from somewhere else or ordering delivery food if one cafe is gone.
Unless you're positing a world where all food production, farming, fishing, etc. has vanished, then software engineers are in no worse a position than chefs, cooks, baristas, grocery store employees, or anyone else.
Yes.
>Without them, software engineers would starve and die
Have you ever cooked your lunch?
this is not how prices are set. If you don't like how they are set then you don't like capitalism, where capitalists pay labour, and labour have to work because they need to live.
That's all fine, but let's be clear on how the price of wages are set. It is not "value created - some 'fair value'" for capitalists.
If people could refuse to work because they didn't have to pay rent and had access to the commons to get food or work for themselves, we might see capitalists having to share the spoils more.
But we have full enclosure.
Right, CEO salaries skyrocket, not necessarily because of the value they create, but because they can get the board and stockholders to back them more than the people actually creating value in a company.
They can do this in the form of stock buybacks, dividends, etc.
The standard software engineer does not have the power to "bribe" the stockholders in that way.
Engineering is one of the only professions that is paid commensurate to the value they provide
Calling our salaries 'exorbitant' leaves you without superlatives left to describe executives that get paid thousands of times our wage, and at least they do work compared to the owners of capital who are 'paid' incredible money without doing any work at all.
To call an engineer salary 'exorbitant' you must be comparing it to the salary of people who function as modern serfs, and are not paid commensurate with the value they provide, or even enough to live a safe and satisfied life. Being paid enough for modest freedom and security is not 'exorbitant' though- no matter what you're comparing it to.
I can only say that IME a team is going to be a lot more productive if they are able to own their development process. Good infrastructure, knowledgeable engineers, healthy relationships instead of competitive ones - that's what creates a highly productive team and highly productive engineers.
The number one main headline takeway axiom of Agile is that this question is completely banned.
Agile is about delivering working software continuously, delivering whatever increment you get working at each timepoint, adapting to observed reality as it comes, and not having deadlines for specific features that might turn out to be impossible or harder than estimated.
If you babble around saying plans and deadlines are for suckers and that things will happen when they will happen, I am not sure they will keep paying you and your team's salaries for long. This new contrarian cargo cult of waving away any kind of medium-term planning or estimation is hurting businesses as much, if not more, as when all projects were waterfalled and timeboxed to death.
Yes, estimating is hard to get right. No, it does not mean we should simply get rid of it. Because engineers do not live in a little bubble of code: there is usually a whole company around them who need insight into what is getting built and when they can expect it. And anybody who believes that asking this question is too much or intrusive has never worked in a non-engineering position, or think of themself too much.
The challenge is that management is only looking through a small window and everything from promotions to raises to favours are dished out based on that window.
Anything not in view of that window immediately obviously becomes useless to one's advancement in a company, so the window better cover everything which matters and it usually doesn't.
The question of whom things are visible to is an important one. Your comment says "management", and yeah that's one common way of thinking about it. But managers are just individuals with their own motivations. It is really "the business" that wants visibility in order to best accomplish its goals. There is an assumption that "management" is better aligned with "the business" than the employees they are paying "exorbitant" salaries to. But that may or may not be true, managers are also just individuals with their own motivations. So to the extent that it is true that managers are better aligned with the business, why is that the case? I see a few things that trend in that direction: compensation that is more tied to the performance of the business (through bonuses or what have you), more visibility into the goals and reasoning for decisions being made by leadership, and a better grounding in the dynamics of the business (what is the strategy, how does its market work, how does it make money). The theory is that because of those things (and probably others I'm not thinking of), the managers are better suited to be representing the interests of the business, whereas the engineers are just tools those managers can use to further those interests.
That is one way of doing it, probably the most common way, and it definitely seems like management visibility into work is extremely important in such a setup. But another way might be to align the engineers with the business in the same way managers are: pay bonuses based on the performance of the business, give them visibility into goals and decisions, teach them about the strategy of the business and the dynamics of how it makes money. That is, give the engineers ownership in the same way management has ownership, and trust them to make decisions that are in the interest of the business.
To put this another way: if you trust managers to make decisions about trade-offs that are in the best interest of the business, why can't you trust engineers as well? Are the engineers dumber or shiftier than the managers such that they can't be trusted with this?
Assuming that neither side is doing significant amounts of extracurricular work to bridge the gap, it therefore follows that management understands the business better, because that is explicitly the purpose of their job.
In a best case scenario, it makes sense to provide engineers etc. with the context to understand the decisions. On the flip side, business decisions are often made upon a huge heap of context that is generally invisible to the engineer (unless they spend an equal amount of time in building up their business knowledge, spending time in meetings, etc. - but at that point, they're basically a manager?)
It's not to say that engineers can't develop the background, etc. to make the decisions, but that it's not exactly part of the expected job functions, and not something that's explicitly looked for as part of the recruitment process. In a sense, this is a bit of a tautological issue.
What I'm saying is: what if we rethink specialization on this front? What if we expect it to be part of everyone's job to have deep understanding of and context on the business? Recognizing that there are significant efficiencies in specialization that we lose with this approach, maybe it still comes out ahead. Maybe the improvement in decision making outweighs the inefficiencies introduced by requiring everyone to be a businessperson.
Personally, I think this is a really great way to run a business, if you can get broad buy in for it. The best places I've worked have been those that most closely approached this structure.
But I will admit that this is biased by having a personality where I neither want to be "just" an engineer, nor give up engineering entirely in order to be a businessperson. I think lots of engineers don't want the business stuff to be part of their job, and I guess I can understand that, even if I lament it.
One interesting question is: if everyone is acting with the business ownership mindset more commonly expected of managers, what are managers supposed to be doing? My answer is that front-line supervisor managers are there to support their reports, help them get and understand the information needed to make the right decisions. At the higher level, managers are there to make decisions on tough cross-team and cross-organizational trade-offs. At the very top level, they are there to set and communicate the overarching strategy of the business, which everyone else should be using to inform their own day to day decisions. I think there is plenty of that kind of work to be done, without expecting managers to be making the day to day decisions.
that's crazy talk ;-)
As far as business deserves to know what they are paying for, that is absolutely correct as well.
The problem is that business is not paying for story points. They are paying for actual product and delivery. So when they measure output by story points, you end up with a situation where teams are trying to maximize story points delivery, etc. as opposed to actual product delivery.
but that's the whole problem, if you constrain time, cost and result there's no any space left for agility.
the point of agile is to maximize the value of what can be produced with a given team within a given project, you picked time and cost and you apply agile to emerge stories that are actually important to you and push back on the gold plating.
if you have all three fixed, waterfall works just fine, actually even better.
Having working software is line two of the Manifesto. They can run it each week and see whats new.
Even better, they can provide feedback on the working software and the team can then quickly respond to that feedback. In a week or two, when the outsider next looks at the working software they will see the software improved.
The devil is in the details and in this case literally because the granularity of progress is too fine-grained to be exposed away from its context. The project manager or whatever you call the nearest person with power over your time needs some leeway to organize, ask for some extra, compensate, forgive, and reward you, without higher powers micromanaging. Freedom is the premise of responsability.
Absolute evil happens when customer demands access to hourly activity log for each developer in the (not on premises) project.
Is it? Maybe it's the opposite? Citation needed.
Most often it is not. The problem is that management does not understand shit about software. And they usually don't care to learn about it. Hence this is about as effective as me asking for transparency regarding a COVID-19 vaccine. Yes, the practitioners could tell me they are in a phase-II trial. But to process that information fully and put it into context, I'd effectively need to study medicine.
And as you say, managerial involvement is the problem. Managers and execs mostly get paid to appear to be in control, so having the appearance of control is vital to them, even if that makes the results wildly worse.
A better saying would be, you should only use your target as a measure.
If your target is working software, measure how well the software works.
In your imaginary case, what would your specific numerical measure be?
I've legit sat through 1.5 hour long calls with 6 other devs so we could watch our manager type notes into a presentation that he'll give to a collection of other managers who will only be half-listening until it's their turn to be visible, and all because some other, more powerful manager, decided this was important for the org to do.
It was layers of bureaucracy so deep I wasn't sure where I was anymore.
The primary point of Agile is to empower developers. If management is determined to micromanage them anyway, then Agile is pointless. If the term Agile is to have any business value at all, then let it be the stick with which developers beat some sense into stupid managers. Points are indeed rough estimates and can easily be off by a large factor, and they're definitely not meant to measure performance. Standups are about the team and about helping each other move forward. Demos are about getting feedback from stakeholders. It's fine if others see the Jira board, but it's not theirs. It's the developers'. And if a task isn't done, and it isn't done.
I fight for this if necessary, but fortunately I'm currently working in a team of very vocal and opinionated developers who take charge of their project and push back against managers if necessary. We do Scrum, but we're not dogmatic about it. We change the sprint scope if the situation calls for it. And we rebel when it's management that's calling for it.
It's certainly reasonable for those various stakeholders to ask for visibility. Demos are great for that, and a lead engineer or front-line engineering manager can work with stakeholders to establish some metrics to report on, but those are epiphenomenal to the process chosen.
I'm not saying it's a guarantee, just that nothing else really works well.
and it was understood and expected that this meant the estimate would go up
Today we have 'bidding', which if that sounds like something a three year old does to their parents, you'd be right, and it's the same thing. You just ask someone else until you get the answer you want to hear (instead of the one you need to hear).
It's not the same thing. It's not "bidding", even if it's called that because the lowest or highest or middling bid doesn't necessarily get the work. I know, I know, it sounds like another "you're doing Agile wrong", but Agile already fucked it up by saying "bidding", so we get these wild stories of how companies have their laziest incompetents in charge of trying to make improvements to process.
> You just ask someone else until you get the answer you want to hear (instead of the one you need to hear).
Otherwise you will only have the most jr or senior people working on everything. The system of bidding just doesn't work, which is why it's not bidding in a practical sense.
You ask why people put down their estimates by describing what they know about the work. This is an opportunity to transfer some cursory knowledge and reinforce pain points. At a very progressive "Agile" company (we would invite speakers and A/B tested various practices across teams), I notoriously inflated/deflated all estimates by bringing up edge cases and/or constraining objectives. Story grooming aside, there are always people trying to over-engineer and estimation is another gate to prevent that.
Agile was a good try to create software process, but it's incomplete at best. The idea that it would evolve is laughably naiive (https://app.spectator.co.uk/2020/04/22/the-illusion-of-certa...). Companies want S&Ps, not sauce that they have to mix themselves.
I'm talking about the dickering about whether something is N points or N-2 points. Or whether the points even mean the same between two teams. Or whether it's appropriate to assign it to another team or individual who says a smaller number because they have a different definition of Done or are more or less invested in the long-term health of the project.
I'm going to ask this person or the question in this way because I'll get the answer I like, even if that answer is unhealthy or even pure fiction.
We should make "estimate" a banned word and replace it with a word like "guess".
Too often what starts out with an off-the-cuff chat about implementing some feature while people are getting coffee with a statement like "Oh I don't think it will be too hard to do this - will take a week tops <filddles with coffee machine />" etc ends up growing its own legs and becomming a gold-plated and irreversible commitment made to a director/VP/CxO somehow. What was a casual guess made without all the information required is now a rod for.our own back. Again.
Perhaps as engineers we should give ourselves a sort of mental style-guide to never ever say the words hours/days/weeks/months/quarters/etc without alarm bells going off in our head and requiring extensive peer review in the same way we do when we're writing "dangerous" code (e.g. user-provided values going in to SQL queries etc) Only half joking really :)
[1] https://www.scrum.org/resources/blog/commitment-versus-forec...
I'm getting really tired of companies trotting out the "because [Facebook|Apple|Google] does it" excuse. Those are massive companies. Are we so delusional to believe that what works for a $70B/year company will automatically work for our $20MM/year company?
It was a good way to get your head bitten off.
The idea that FAANG are faster then your startup is absurd on its face. The revenue and legal risk is absolutely huge.
One difference between those highly paid software companies and others, is the expectation of performance. Netflix famously considers their team a sports team rather than a typical corporation. It's totally common for a great engineer to bomb out of those companies, just like how great athletes get kicked off top tier sports teams when they failed to perform due to reasons out of their control.
While most other companies, lacking the ability or willingness to pay top dollars, are probably better off creating a safe environment for engineers who can be on-par or even better than FAANG engineers, but lack the political maturity to survive those high pressure environment.
They saw a process that did an end run around them in favour of more self-management, and it worked well and got a lot of hype, that's terrible for their careers obviously.
So they fixed it and kept the same name for marketing.
Agile is about culture and the culture of the pioneers and early adopters was different.
I‘m seriously thinking I should try to go more the Kanban direction these days to aboid the story point hitting / fitting in ever shrinking sprint trend.
The reporting is a whole other issue. I don't use this, but my PM does because upper management keeps changing their reports and my PM has to keep linking and organizing. But as a developer, doing spring planning and burndown charts work quite nicely.
Gonna play devils advocate here...would those two be mutually exclusive?
I feel there's a fundamental flaw in the garden of agile eden you initially described and that's trust...if you don't have it or lose it then gl trying to convince someone to essentially write a blank cheque for something they don't understand
If trust can erode a whole methodology then it's something to consider imo
As a customer, you get to decide what you want to buy, and you get to be happy or unhappy with the delivered product.
But you don't get to control or even monitor the work in the factory/kitchen/etc.
That's instead the job of a boss! Of course, an agile team also has a boss. But it's not the customer.
But usually some proxy for the customer in your organization has to take on that role.
There are no "rules" in agile that says who can do what, just teams of people negotiating what works best for them. "Individuals and interactions" over process.
Not claiming it's inscribed on some sacred tablet.
Estimates are an interesting one. The theory of story point estimation is that you are estimating the size of the work being and not even implying, let along guaranteeing any notion of timing. That being said, it's still sometimes a valid question to ask why something is taking so long.
A great talk that I make everyone watch is John Cleese on Creativity In Management, it is a must watch for value extractors dealing with value creation that ultimately is creative work [1][2].
The open mode is allowing space, time and confidence. Closed mode is finishing/ship it mode.
"CLOSED" MODE
> By the "closed mode" I mean the mode that we are in most of the time when {we are} at work.
> We have inside us a feeling that there's lots to be done and we have to get on with it if we're going to get through it all.
> It's an active (probably slightly anxious) mode, although the anxiety can be exciting and pleasurable.
> It's a mode which we're probably a little impatient, if only with ourselves.
> It has a little tension in it, not much humor.
> It's a mode in which we're very purposeful, and it's a mode in which we can get very stressed and even a bit manic, but not creative.
"OPEN" MODE
> The open mode, is relaxed… expansive… less purposeful mode… in which we're probably more contemplative, more inclined to humor (which always accompanies a wider perspective) and, consequently, more playful.
> It's a mood in which curiosity for its own sake can operate because we're not under pressure to get a specific thing done quickly. We can play, and that is what allows our natural creativity to surface.
...
> Humor is a natural concomitant in the open mode, but it's a luxury in the closed {mode}.
COMBINING OPEN and CLOSED MODE
> Once we've taken a decision we should narrow our focus while we're implementing it, and then after it's been carried out we should once again switch back to the open mode to review the feedback rising from our action, in order to decide whether the course that we have taken is successful, or whether we should continue with the next stage of our plan. Whether we should create an alternative plan to correct any error we perceive.
> And then back into the closed mode to implement that next stage, and so on.
EXAMPLE
> ...one of Alfred Hitchcock's regular co-writers has described working with him on screenplays.
> He says, "When we came up against a block and our discussions became very heated and intense, Hitchcock would suddenly stop and tell a story that had nothing to do with the work at hand. At first, I was almost outraged, and then I discovered that he did this intentionally. He mistrusted working under pressure. He would say "We're pressing, we're pressing, we're working too hard. Relax, it will come." And, says the writer, of course it finally always did. We need both modes.
The world is value creators (product/engineer/creative/imagination) and value extractors (business/management/finance). Once the latter group get control, they end up squashing the "open" mode that is so key to making good products. The value extractors increase pressure but sometimes lowering pressure will let the product iterations flow to a better product end result.
Value must be created first before value can be extracted, but you can't force value creation with only the "closed" mode.
Value creation processes that make sure there is an "open" mode along with the "closed" mode are always more successful, and sometimes the "open" mode doesn't look like work so the value extractors cut it first unknowingly killing the product slowly.
The wrong type of Agile removes the "open" mode and cuts prototyping, iterations and refinement of creative value creation. A more open type of iterative development is always better.
[1] https://www.youtube.com/watch?v=Pb5oIIPO62g
[2] https://genius.com/John-cleese-lecture-on-creativity-annotat...
It's well known that the systems an organization produces are bound to reflect the communications structures within that organization this is known as Conway's principle
In order to maintain flexibility in the design it's necessary to maintain flexibility in communication but engineers have no incentive to push for free communication and stick together to see the job done right, each of them is attached to a management minder who reports to a rigid top-down governance structure with very different ideas on how software should be done, effectively stifling any potential dissent at the source and acting like an authoritarian regime with the desire to divorce the workers from ownership of their work and turn them into compliant and productive cogs in the machine
The reason for this is not because corporacy sucks but because humans suck at corporacy and when placed in group environments of over a handful of people we tend to resort to mob rule and groupthink at the expense of culture and individual rights
It's rather complex but incentives are the clearest indicator of outcomes people simply have no incentives to help each other but every incentive to seek permission and recognition from management
In such an environment it's been postulated that four types of personalities emerge as people attempt to exert control and these are known as Control Dramas:
- The Intimidator
- The Interrogator
- The Aloof and
- The Poor Me
You can look these up there are several good articles online about identifying and mitigating these but it's not always just one but a combination that people exhibit
Framed in this context you can see corporations as implemented naively operate on only four cylinders even if it's only figuratively or intuitively true it's far from the humane ideal of what agile intended and this also has to do with metrics becoming targets and incentives trumping ethics
In the end we trumpet DRY and try to 'focus on our work' while we repeat the same inane insane dramas day after day expecting a different outcome that's the worst form of repeating yourself but we collectively walk into it in every case
I'm personally carrying a lot of resentment at the engineer class because we've been trained to know better but we simply can't get over ourselves and wake up to the fact that we're not just part of the problem, we are the problem but as such we also possess the solution if we really sit down and think about it
The solution lies in the following concepts
A) it's possible to have alignment and autonomy it's not necessary to choose between chaos and blind compliance
B) It's possible to have investment and productivity but it's necessary to trust people and that ultimately is where we fail