by aprdm · 6y ago · 0 comments
If the software team is of a medium size, let's say, less than 50 people, then it surely isn't how you paint.
The CTO / Manager(s) for sure know the impact of the ICs and likely nobody is measured by LoCs. I personally have never worked in an organization (10 companies and counting) where LoC has ever been mentioned as something being measured.
Though that was the stupidest way to come to that conclusion, it is true that I was doing less IC work than other members of my team. I had surfaced this several times in 1:1s and thought that was what he expected. For instance, some weeks I had literally 20 hours of meetings, with significant overhead attached to those; it is hard to make much progress coding in that environment.