by hengheng · 6y ago · 0 comments
For passing certification, the best advice is really shielding closest possible to the source. Bury all signals, have no cables, shield the die if anything. If you can, bury the die.
For escaping surveillance, make sure to never leave the shielded room, or meet with people who do. /s
It's kind of like EMI/EMC testing of hardware you have designed yourself; it's usually much cheaper to apply a bandaid fix (add ferrite cores, shield that cable better, terminate here not there, etc.) and add to a punch list for rev 2, than to go back to the drawing board and change the board/die/whatever.
Of course if you can plan for this during design, you (and your boss/bottom line!) will be a lot happier.