Impossible.
Leads times on fab hardware are on all time high.
Not to say that construction, and setup itself would be extremely challenging in such timeframe.
And not saying that US has no supply chain locally for modern fabs. Intel famously flies a lot of its consumables from abroad.
Samsung will have similarly to transport its consumables by air if they go with this plan.
Foxconn promised a giant fab in exchange for massive tax breaks, and then just took the tax breaks and did nothing. Any reason to expect this is different?
They didn't get the tax breaks because they didn't meet the targets.
From your article:
After Foxconn failed to meet its job creation targets, Wisconsin’s governor, Tony Evers, last month pulled a deal that would have handed the company nearly $4.5bn in incentives for completing its plans.
Hundreds of millions were spent on variously infra improvements, eminent-domaining people out of the way, lawyers, etc.
https://www.chicagotribune.com/suburbs/lake-county-news-sun/...
I actually don't know how much Foxconn did get out of it. They've apparently run similar scams elsewhere, it appears to be a Foxconn side gig.
There's a fun book in here for a scrappy investigative journalist.
This is potentially wasted money, but it did not go to Foxconn, and presumably created infrastructure jobs. Not defending the deal, but it is often mischaracterized. The benefits to the companies usually are tax rebates that are only valuable if the company makes real investments that are taxable. They are not direct payments.
On top of everything else, abuses of eminent-domain, civil forfeiture, and so forth really, really bother me.
In principle, I unconditionally support the right of the polis (the government) to do what needs to be done. My own city basically used extralegal means to wrestle numerous blighted, condemned properties away from a trust. The creators of the trust were dead and no one was left to negotiate.
But hot damn these levers of power get abused.
Please recommend any books, articles, etc advocating reforms.
That said, yeah, I also have to be honest. We're down about 1 billion dollars on that Foxconn thing. That's what we're out of pocket. The new governor, wisely, took what remained of our chips and left that table. You get mad, but you just have to chalk it up to a learning experience.
The Illinois people are right on this one by the way. Not even in Illinois would their leaders get away with a 5.5 billion dollar con. The people in Illinois are so used to dealing with corruption that they would have started asking questions and raising a fuss long before it got to that point. Our problem is that we're so accustomed to our corruption that we never raised a fuss until it was way too late.
All that said, in Wisconsin our leaders didn't get away with 5.5 billion dollar con either technically speaking. Scott Walker and his boys got us for about a billion, but they didn't get as much as they wanted. So fibs shouldn't gloat too much, because while I can't see anyone in Illinois getting away with a 5.5 billion dollar pure con, I could see someone getting away with maybe a billion. (It's just that they're far more wealthy than we are, so that billion doesn't hurt as much.)
Hope that the Governor of Wisconsin stayed a Republican? Now, that's not to say Democrats can't engage in grift, but, the deal was started under a Republican Governor in a notoriously corrupt state where the promise of Foxconn jobs was lauded by legislators, the governor, and the former President as a win for the people of the state, for our country, and a blow to China (that we were taking jobs back).
Foxconn's incentives seemed aligned with promising the moon and if those people were reelected, well, wouldn't compensating Foxconn for those promises and their outcome (the election outcome, not the factories) be fair?
A lot of the reporting at the time emphasized that Foxconn had a history of doing this in other countries. It seems like a negotiating tactic that evolved in an age of cynical political environments where everyone's proximate goal is to announce a 'deal' with the full expectation that they won't be in a position to take credit (or blame) for the quality of that deal.
Which is not to say this won't become a cesspool, too. But at the very least, I don't see scummy pols waving wads of cash at Samsung right now.
I'm not going to say Foxconn was doing business the way Chinese do business, but maybe there's a culture thing there.
Every HN’er here promotes for the freedom and democracy loving people of Taiwan. They even claim it’s a country.
So get your “country” correct.
This. Samsung is another company like Amazon that takes long view and flywheel to another level. And to answer question to comment below. Yes at one point Samsung was trying to make their own EUV Scanner, if you consider their NAND and DRAM scale it should comes as no surprise. And Samsung has their own Chemical Subsidiary along with dozen of others for their Foundry. They are taking vertical integration to an extreme.
And that is speaking as someone who dont particularly like Samsung. But Credit where Credit's due.
Sure, they shelved it (Hard to compete with established players who can spread R&D over volume), but people were pretty amazed at how well Samsung did entering that market from a quality standpoint.
Why does that matter? Because that indicates they have plenty of skill in lens manufacture, which is another critical component to a good fab.
Not to mention they have to staff the thing, train the staff, etc.
From personal experience I would posit scaling semiconductor manufacturing as 10x to 50x harder than getting a process flow to work in a development fab. Ramps are absolutely killer.
Intel's last fab build took 9 years to go from green field to producing wafers (note...faster is possible)
https://www.tomshardware.com/news/intels-long-awaited-fab-42...
Some more realistic notes because I sound a little hyperbolic:
2011 - break ground
2013 - finish basic construction
2014 - stop progress
2017 - start install of tooling
2020 - production
Samsung's Pyeongtaek Line 3 fab broke ground in 09/2020, construction expected to be complete by 2H/2021, mass production by 2023. This is not an unreasonable speed for Samsung.
Of course, the slower rate of work by American construction companies could slow this down.
They build it in Arizona where Intel has several fabs and where TSMC is building their medium-sized 25K/month 5nm Megafab.
Let's restate the question. Which node can they get up by 2023 and how much of security critical U.S. consumption can that cover?
What US can't source for F-35 locally are Xilinx FPGAs at either 65nm, or 40nm nodes.
The question is not in node size as such as having an FPGA process capability.
FPGAs on generic CMOS don't work great. The ability to tweak, and optimize the process specifically for individual design is huge for FPGAs.
Intel with their CPUs are very much in the same situation, but in reverse. They cannot move from "hand polished" proprietary processes they've been developing for decades to anything else.
Major supppliers include:
Nikon
ASML
KLA-Tencor
Applied Materials (AMAT)
Lam Research
the timeline they are suggesting isn't literally impossible as a matter of phyics but is, to me, laughably unrealistic and likely done to try and extract tax incentives.
Unless they have already broken ground in Texas...and are just shopping for a better deal
Add like 100 more companies to the list.
A fab is not only a lithographic line, but a ton of other very unique, industry specific equipment.
Air handling for fabs stuff is up to 24 months lead time, and has no use in any other industry.
Ultra clean water plants — 9 to 18 months. Just two vendors on the planet.
Gas plants — take few years to construct by themselves
Chem plants — again years long lead time equipment from only one vendor in the world
On site mask shops — equipment, and processes not much cheaper, or less scarce than the last gen chip making gear itself.
Cleaning stations, degassing stations, industry specific SCADA hardware, AMHS... (https://youtu.be/XKXZT-BBUEE)
Post-backend stuff...
The list will go on for a few screens.
Also, ASML’s EUV light source division was fairly recently (2013) acquired from... California. Cymer, LLC.
Retooling for EUV (or any new generation of such equipment) is very hard. Most (if not all) foundries build new factories rather than retooling old ones.
Time, yields, line size.
Quadruple patterning quadrupples the lithography steps counts. And quadrupples thermal cycles. Which adds more than 4x impact on the number of bad wafers.
100% - 2% * 4 != 100% * 0.98⁴
You need 4x the equipment to complete the same volume of wafers in the same time, which means 4x the line length.
I don't see much retooling for anything below 45nm, if not 65nm.
As for lightsource, sure, that was/is a US company, but there's a lot more to a machine then just the light source.