by bluGill · 5y ago · 0 comments
> 512 KiB per core, 8-way set associative
So the 64 core 7763 / 7713 you are looking at 32 megabytes of L2.
The 11/70 in 1975 already had 22 bit address space and like 10MB disks. So -- yes, it's not unlikely with a bit of hand crafting you could keep the whole shebang in L2 but you need a top end CPU.
The big issue may not be with the trains themselves but the communications protocols used to talk to signalling equipment and other peripherals. Changing the timing in the communication with them may lead to problems.
And what if the original software has race condition bugs which have never been surfaced, and the occasional inaccuracy in timing starts to surface them? Good luck fixing bugs in some obscure piece of PDP-11 software that was written in the 1970s.
You are correct that 10ms is well within the margin of error for safety stopping a train, but it may be out of the margin for some subsystem in the control.