One thing he would point out, that I never see discussed, was that at the time they built the mirror, there was an expectation that it may not be perfect, on account of how the Earth's gravity would slightly deform the mirror during manufacturing. As he tells the story, they'd tried to factor that into the design, but had less confidence in it. This, of course, was not the reason for the eventual problems, but to illustrate that this kind of thing was understood.
The big picture of the failure relates to the Shuttle program as well. At the time Hubble was being developed, its mission was supposed to allow for a lot more around the "shuttle" aspect: not just that it could be reused, but that it could be reused in an actual shuttling capacity, like an orbital pickup truck. So it was supposed to be possible to bring the telescope up into orbit (away from gravitational stresses), see how it worked, and if necessary, bring it back down for corrections. Since the end result of the Shuttle design cut down significantly in its capabilities in this regard, the Hubble program was left without its "Plan B".
Also consider that the mirrors on James Webb space telescope need to account for both deformation from gravity when they are manufactured but also that they are manufactured at room temperature and will be operated at cryo temperatures. But JWST is also special since they have actuators to put stress on the mirror segments to be able to reshape them slightly on-orbit to focus.
(He also worked on the TEAL AMBER and TEAL BLUE satellite surveillance systems, and probably others that he never even talked about.)
I make telescope mirrors.
This problem was well understood since the time of Herschel. We just have better solutions now.
The fact that this is a space scope is irrelevant to the fact that gravity will cause issues. For any telescope, you have to account for differences in the way the mirror is deformed in manufacturing vs in actual usage, and the ways the deformation will change in usage as the scope is leaning at different angles. That is always a thing.
What is particular to the Hubble is that the load in usage is zero (which is unusual), so you have to think about it that way in manufacture. But deformations in manufacture are always an issue you have to account for somehow.
Look at it this way: there is an ideal shape that the mirror needs to have, usually a revolution surface of some conic section (parabola, hyperbola, ellipse, circle). The performance of the mirror will track the difference between the ideal surface and the actual mirror. The error allowance depends on the wavelength λ of the observed radiation.
Telescopes where the error is greater than λ/4 just suck, and are unusable. Good performance begins around λ/8. A great mirror may do better than λ/20.
For visible light, λ/4 is 100 nm, or 0.1 microns. That's 10 thousand times less than 1 mm. On that scale, the mirror is made of jelly. If you put it on a rough surface, it will deform. If you put your thumb on it, hold it for a minute so it heats up from your skin, then pull away, there will be a "mountain" left behind on the mirror, under your thumb, until it cools off again.
In many cases, the support structures for large mirrors are complex mechanisms that ensure the force is uniformly distributed across a large number of points on the back of the mirror. Even amateur telescopes built using the Dobsonian template use passive self-balancing support with 3, 6, 9, 18, or even more points, depending on the size / thickness ratio.
I think a simple way to explain what your grandfather should feel proud of, is they documented the construction process so thoroughly that they were able to _precisely_ figure out what they did wrong, and fix it, on their first try!
For some reason I had thought this (gravity stuff) was the problem. What was the actual problem?
I wonder how often retired NASA engineers are consulted. Imagine as an Engineer having to troubleshoot something which launched into space before you were born.
Of course there must be perfect documentation, SOP along with replicas on land.
I guess the worst thing you can fuck up in space fairing software is the boot loader. Mess that up and you can’t update the software.
Note: I have never designed software for space. I have no clue what I’m talking about.
Obviously working on such cool projects must be a major factor, but it's probably not the only one.
The project I worked one was migrating data from their in house ticket tracking system to Jira. I was importing tickets from 1985 into Jira which obviously didn't exist at that time.
Though probably a "different world". It would be hard to retrain to do react development, for example.
But nary a word from such commentators when a major commercial software product demonstrates yet another catastrophic security failure.
With government, you can only complain. So you do.
It took our IT over 4 years to migrate away from Siebel to Salesforce and it's going on 3 years since. I just learned the other day we still have a Siebel DB lingering around as a dirty little secret.
We move away from Lotus Notes over 10 years ago and we still have some Notes Apps used by our Legal Department.
With what's left of your budget, which is now very, very negative. Better to redefine abject failure as success to minimize the chances of it ending your career if you're involved in firm purchasing in any way. It's not like boards of directors have a clue. The big consulting firms will assist pulling the wool and priming the press so they can move onto the next mark. It's impossible to by cynical enough.
People love to shit on Oracle, IBM, etc when they bungle yet another big project that was supposed to fix something.
For instance, I’m happier if I pick my couch and then I’m uncomfortable than if the government picks my couch and I’m comfortable.
My dad was on an Air Force Base when the base commander delegated to his wife picking out all the furniture for the base housing. Naturally, every serviceman's wife hated it.
me: I think we can build something in-house here better than what the vendor will provide, I think the vendor's solution is likely to be a failure for us.
them: Yeah, but if do it in-house and it fails, it's our fault. If the vendor's solution fails, it's their fault -- plenty of very prestigious universities are using this vendor, nobody's going to blame us for choosing them. [Ie, "nobody got fired for picking IBM" basically].
At the same time, it shouldn't take twenty years to build a space telescope, especially since it's not like it's the first one ever. The first atomic bomb was built in 4 years.
Regarding the bomb, we were trying to end a global conflict, so the comparison couldn't be further off base.
[0] Currently at least. Starship could I guess but it was planned way ahead of Starship even being a glimmer in Musk's eye. Do they have any grapple points on it as insurance? I would at this point, just put one of the posts they use on the ISS for Canada Arm to grapple.
It’s simply how things are done around here these days.
In the SpaceX era of reusable rockets, those costs become 1-2 orders of magnitude smaller, and I expect a flurry of simpler space telescopes in the nearish future.
That's the theory. Does anyone know if such things are being worked on?
JWST costs upwards to 9 billion USD. An Ariane 5 launch maybe 200 million.
Just because the launch is cheaper doesn’t make the rest of the project less complicated and costly.
I agree it was a milestone for astronomy, but it's been very long without any progress since. Why don't we at least have 4 more Hubbles in orbit?
Hubble - Visible / NIR, 1990 - Present
Compton - Gamma Ray / Xray, 1991 - 2000
Chandra - Xray, 1999 - Present
Spitzer - Infrared, 2003 - 2020
But again, even though it was "visible" it did not have many pretty pictures because the mission was looking at brightness variations in particular stars (planet transients).
> There's also JWST
Which is 15 years late and still on the ground.
The next Roman optical space telescope is slated for 2025.
The mirror in Hubble is 2.4 meters
Large ground based telescopes now have mirrors in multiple segments with motors keeping them at the right curvature.
The largest has 10.4 meter mirror. That is about 11 times larger area than Hubble.
https://en.wikipedia.org/wiki/List_of_largest_optical_reflec...
One of the original reasons for Hubble was to have a telescope above the atmosphere. The atmosphere distorts the light as it passes through making stars "twinkle."
Now we we use a laser beam to energize sodium atoms in the upper atmosphere. We see how that is distorted by the atmosphere so that with software we can cancel it out.
https://en.wikipedia.org/wiki/Laser_guide_star
Combined with lucky imaging where instead of taking a single long exposure we take thousands of images in the 100 millisecond range. We can toss out the images where the atmosphere was moving a lot and combine the other good images.
Kepler, Spitzer, Herschel, WISE and more. I agree that there ought to be more by now but its not like we did not see 'any progress'. Today we know hundreds of earth sized planets in the galaxy. If that's not progress, I feel the telescopes JamesWebb and NancyGraceRose will only disappoint you ;)
Hubble was launch in 1990, and have 5 servicing missions for repairs and upgrades, with the last one being in 2009.
An exact clone of Hubble is not nearly as useful as the first one, so it is reasonable to put your resources into a novel telescope. Unfourtuantly that telescope hit some scheduling challanges.
Not to mention all the other space telescopes https://en.m.wikipedia.org/wiki/List_of_space_telescopes
Which includes a gravitational telescope prototype.
NASA is well funded, not underfunded. It receives over three times the funding of ESA by comparison.
Why aren't the Europeans funding their scientific institutions better? Because the combination of soaring entitlement costs and stagnant growth robs them of the necessary tax revenue for that. Which is exactly what's happening in the US, and it's going to get a lot worse yet. The US has a bit less of an excuse, seeing as it could safely cut $200b off of its military. However, that $200b spread around to every squeaky wheel still won't go very far (it's equal to a mere ~2.3% of total government spending), you might be able to fairly boost NASA's budget by $3b per year if you slashed the military. Back in reality, that $200b in cuts should probably be entirely allocated to healthcare, which brings us right back to the central issue of priorities; and the Europeans know that quite well, which is why ESA is poorly funded.
(I came across this idea in a Tom DeMarco book called "Why Does Software Cost So Much?": basically people complain about the high costs of developing new software, but then for some reason they keep paying to develop more software. Even though the initial cost estimates may turn out to be fiction, it's still worth it because the benefits are so big.)
I worked in defense and had a coworker who thinks that NASA should be abolished and the US should cease all spending on space. Thinks it's all a waste of money.
There is also a sort of mini shuttle that has launched a number of times in the last decade called the X-37B which some have speculated might be used for servicing satellites.
It's definitely an interesting concept! The way you say the shuttle chased down satellites makes me laugh, as if the satellites were trying to escape and were zig zagging around! In reality, every mission to the ISS does the same thing as the shuttle rendezvousing with the Hubble.
>> Hubble’s operators initially thought a memory module was at fault but switching to one of three backup modules produced the same error.
Apparently Hubble has 4 memory modules which are switchable! I'd love to see how that works. Actually, I'd be fascinated to get a walkthrough of the overall architecture. It might give insights for how we keep business continuity by first accepting that hardware and software will fail.
Fig 5-10 is the Data Management Subsystem
https://asd.gsfc.nasa.gov/archive/sm3a/downloads/sm3a_media_...
Concerning the computers:
- First they had a DF-224 flight computer and a
- Science Instrument Control and Data Handling (SI C&DH)
Initially DF-224 between missions got installed a coprocessor:
https://asd.gsfc.nasa.gov/archive/hubble/a_pdf/news/facts/Co...
During another servicing mission they replaced it with something called the Advanced Computer with Intel 80486:
https://asd.gsfc.nasa.gov/archive/hubble/a_pdf/news/facts/FS...
There are some 50,000 lines of code in the C and Assembly programming languages. https://www.nasa.gov/pdf/327688main_09_SM4_Media_Guide_rev1....
They also have a Help Desk...
"Welcome to the Hubble Space Telescope Help Desk"
"There's a backup module, with an override command to activate it, but it won't work with the system down. You'll have to use the manual override switch - on the telescope."
I found one discussion from 7 years ago
“… I think we should start a more extensive national unmanned space program. For example, if the Hubble, or its replacement, needs to be fixed, we should have an unmanned answer, for instance.”
Huble was never meant for this, if you look at all the systems present on ISS for automated docking, none of that is on Hubble. Access to modules inside Hubble was never meant for robots with very limited dexterity either. Being able to do something like that would be a huge feat of engineering in my opinion (and extremely expensive).
I am fairly certain it would be faster and cheaper to just build a new one from scratch.
And even if you managed to make a robot to service Hubble, it then would only be able to service Hubble and nothing else. JWT for example is completely different.
On the long term you are right that this is a capability we need, but this needs to be taken into consideration while building the telescope/satellite/whatever: automated docking mechanism, standard ports and dimension of parts etc. etc.
So the idea is that you don't need to specialize it to the thing it's meant to work on, because it works on whatever a human works on. A similar idea drove a lot of the DARPA Robotics challenge, with its emphasis on being able to drive a normalish vehicle, open a door, climb a ladder, use a regular power tool, etc.
Anyway, I think the state of the art for all this is still pretty far away, which is why the instinct is to assume we're talking about something specialized.
It was also never meant for humans with less limited dexterity.
I recall one of the Hubble servicing missions I watched on NASA TV, in which they had to bolt a special adapter plate over a cover, unscrew over a hundred tiny non-captive screws (which the adapter plate was designed to catch, so they wouldn't float away), and only then could they open that cover. That part of the telescope clearly wasn't designed to be serviced in space.
Plus you'd still need spare parts. Why would I build a robot to swap parts, when I can simply put all of the spare parts into the telescope and swap over to them electronically?
The other thing to remember was that Hubble was designed in an era that the Space Shuttle was meant to make manned missions to repair / upgrade commonplace. My understanding is that this was actually done at least once to Hubble (maybe more? I forget); but unfortunately for Reasons, NASA turned out to be incapable of resisting cutting corners which put people's lives at risk (Challenger, Colombia). A system designed today would be designed assuming that it would be robots or nothing.
Also, the vision is that robots can build on Mars, for example.
“Simply” means fund the research. My comment was from 7 years ago.
We also need the robots here on earth for dangerous tasks
We’d make impressive progress over each decade with more effort.
What if the system that swaps parts fails?
It would make sense to start working on a replacement for Hubble, even if that means it'll be ready in 20 years.
JWST has a docking port for a future robotic servicing mission.
Nancy Grace Roman (formerly WFIRST) space telescope has grappling points on the spacecraft for robotic servicing.
The general problem of repairing Hubble robotically is unlikely to be solvable within the lifetime of the telescope, but future devices could be designed with that in mind.
Is the answer is that NASA doesn't know how to build them anymore? Or that it's not politically feasible?
"Just" is being extensively overused in this thread.
When operating multiple devices to improve reliability, diversity is one point.
The NRO did donate two unlaunched telescopes to NASA in 2012 (with optics present but sans electronics), which still have not yet been retrofitted and launched.
Also, it has provided lots and lots and lots of beautiful pictures that are stunning to look at even for people who otherwise do not care about astronomy at all. I think it's fair to say that no other project/mission/device since the Moon landing had a bigger impact in making astronomy "cool". The Hubble Deep Field pictures alone are breath-taking, and they may very well have had as much of an impact on our current model of the universe as Hubble's original discovery of an expanding universe, at least from the perspective of a non-scientist.
As far as I can recall, Hubble was supposed to go down in flames quite a few years ago, but it just kept working, and no equivalent replacement was available. James Webb Space Telescope is not exactly a replacement, as it is an infrared telescope. It will be quite interesting to see how long they can keep Hubble working. It had a rough start, but the fact that after some initial corrections, it has lasted way longer than it was supposed to speaks of the quality of engineering that created it.
Once the optics were corrected, though, it became very big. I once heard an astronomer say that there is pretty much no field in astronomy that did not benefit in some way from Hubble. And for lay people like me, lots of stunning pictures. :)
But really, aren't these spacecraft, rovers, exploration programmes, etc. among the best example of what humans can do if they put their minds to it?
I think i have to read up on it :D
So they had a spare PCU that they switched to. Hubble was launched in 1990. Is 30+ years normal for a continuously operating PCU? What is the expected lifespan of the “new” PCU that has been sitting this whole time?
https://esahubble.org/about/history/sm3b_replacement_of_pcu/
Given the longevity and how well engineered things are for their other projects, I'd have to say yeah it seems pretty "normal" to me.
It seems like they overengineer and quality control to the point of doubling planned mission length, if not longer. My cynical take on it is they do it this way because of the nature of their funding rather than any specific engineering goal.
Here's some actual details:
The problem:
> NASA has identified the possible cause of the payload computer problem that suspended Hubble Space Telescope science operations on June 13. The telescope itself and science instruments remain healthy and in a safe configuration.
The payload computer resides in the Science Instrument Command and Data Handling (SI C&DH) unit. It controls, coordinates, and monitors Hubble’s science instruments. When the payload computer halted, Hubble’s science instruments were automatically placed into a safe configuration. A series of multi-day tests, which included attempts to restart and reconfigure the computer and the backup computer, were not successful, but the information gathered from those activities has led the Hubble team to determine that the possible cause of the problem is in the Power Control Unit (PCU).
The PCU also resides on the SI C&DH unit. It ensures a steady voltage supply to the payload computer’s hardware. The PCU contains a power regulator that provides a constant five volts of electricity to the payload computer and its memory. A secondary protection circuit senses the voltage levels leaving the power regulator. If the voltage falls below or exceeds allowable levels, this secondary circuit tells the payload computer that it should cease operations. The team’s analysis suggests that either the voltage level from the regulator is outside of acceptable levels (thereby tripping the secondary protection circuit), or the secondary protection circuit has degraded over time and is stuck in this inhibit state.
Because no ground commands were able to reset the PCU, the Hubble team will be switching over to the backup side of the SI C&DH unit that contains the backup PCU. All testing of procedures for the switch and associated reviews have been completed, and NASA management has given approval to proceed. The switch will begin Thursday, July 15, and, if successful, it will take several days to completely return the observatory to normal science operations.
The team performed a similar switch in 2008, which allowed Hubble to continue normal science operations after a Command Unit/Science Data Formatter (CU/SDF) module, another part of the SI C&DH, failed. A servicing mission in 2009 then replaced the entire SI C&DH unit, including the faulty CU/SDF module, with the SI C&DH unit currently in use.
Launched in 1990, Hubble has been observing the universe for over 31 years. It has taken over 1.5 million observations of the universe, and over 18,000 scientific papers have been published with its data. It has contributed to some of the most significant discoveries of our cosmos, including the accelerating expansion of the universe, the evolution of galaxies over time, and the first atmospheric studies of planets beyond our solar system. Read more about some of Hubble’s greatest scientific discoveries.
And the fix:
> The switch included bringing online the backup Power Control Unit (PCU) and the backup Command Unit/Science Data Formatter (CU/SDF) on the other side of the Science Instrument and Command & Data Handling (SI C&DH) unit. The PCU distributes power to the SI C&DH components, and the CU/SDF sends and formats commands and data. In addition, other pieces of hardware onboard Hubble were switched to their alternate interfaces to connect to this backup side of the SI C&DH. Once these steps were completed, the backup payload computer on this same unit was turned on and loaded with flight software and brought up to normal operations mode.
https://www.nasa.gov/feature/goddard/2021/operations-underwa...
I found this thread fascinating: https://news.ycombinator.com/item?id=27011790
"Glitch" == "I want to obscure the cause of that unwanted behavior."
"Why build one when you can have three, at thrice the price?"
[1] http://content.time.com/time/health/article/0,8599,2116436,0... [2] https://www.spacesafetymagazine.com/space-exploration/deep-s...
Swollen capacitors? =)
Hypothetical Hubble with support for such operation would have docking port for the space tug, which could bring it back to orbit that could be taken by service vessel, then bring it back to proper orbit.
There was a "space tug" concept out of MSFC in the 70s that was basically a capsule with some robot arms mounted on a service module. It would have acted as a repair truck as you say.
It would have also been limited by consumables. Refueling in orbit is a non-trivial problem to solve. As is maintaining an orbital fuel depot. A tug and depot would only be able to service satellites in compatible orbits. So you might need to maintain dozens in orbit to service different orbital planes and altitudes.
As I understand it, there is no current vehicle that combines the Space Shuttle's ability to both dock with a satellite (via a docking arm) and allow astronauts to do EVA.
So I guess James Webb is possibly screwed if it has a problem in orbit like the Hubble's mirror issue. Too bad we won't bring back the Space Shuttle.