by stjohnswarts · 5y ago · 0 comments
The moment people blame things on tree huggers they have fallen into the trap. Tree huggers are not the problem. The problem is carbon emissions. Tree huggers aren't stopping nuclear. They barely have any political power or representation. Nuclear's problems are the huge capital costs and the nimby attitude of the general public.
Nuclear is a clear win in countries like France with the capability and commitment. Climate change is a global problem and it doesn't matter where the nuclear reactors are as long as global emissions are reducing. Countries that can increase nuclear should. Those that can't may find it harder but they will have to innovate more and move faster.
https://www.encyclopedia.com/environment/educational-magazin...
The late 1960s through 1980s saw a shift in the antinuclear movement toward protesting the development of nuclear power as an energy source. The antinuclear movement succeeded in virtually halting the governments' development of nuclear power.
And I'm not even sure the people in the anti-nuclear movements were really that concerned about CO2 emissions in the 70's or 80's. While currently renewables are much cheaper than nuclear that wasn't the case 30 or 40 years ago. Without the absurdly irrational reactions to TMI and Chernobyl a few years later, we would have been much better situated to considerably reduce CO2 emissions but sure blame the oil lobby (of course there are plenty other things to blame them for) ...
It's easier to target marketing against a few 'smoke stacks' than ten millions tail pipes. It's easier for people to get people to sign petitions against an 'industrial site' that is many kilometres away that most people will never see, compared to having people trash their own personal possession (their car).
Nuclear is the mainframe. Let's just concede, for the sake of argument: the hands-down better, more reliable tech.
Renewables is the distributed. Worse but worse-is-better [1]. Setup and investment is incremental. Take down and/or upgrading is also simpler. There's huge traction in the battery and renewable tech ecossystem. The lower entry barrier makes it a competitive, highly decentralized market where costs are going down fast. There are "killer apps" and a constant flow of innovation happening everywhere else too, outside of power generation: from cars, to airplanes to homes. And it's all that swarm, and not a single "because it's better", that makes the renewable+battery duo the winner.
Maybe nuclear could have been that distributed, pop energy too, but the fact today, for various well-known reasons (regulation, monopoly, distrust...) it isn't. And, by the looks of it, it probably won't be in the future. Nuclear failed to capture the traction in the West for decades already. Just like the IBM mainframe it's not going away, and it's a perfectly good solution for some people (banks for the mainframe, China for nuclear in this metaphore). But most of us are heading into a "cloud" of multi-tiered renewable tech solutions and nothing can stop it.
Also, it's fine to be pro-nuclear (I am too), but it's not fine to be anti-renewables (or anti-nuclear).
That is solvable problem. Much worse issue is that in mid lattitudes (e.g. central Europe) it is not available (or just marginal) most of winter.
Nuclear has the huge problem of not being available for another decade (because that's how long it takes to build plants). Until that is solved with some form of pocket reactor it can't solve the problem of greenhouse emissions.
It works so "well" that the French taxpayer will have to pay the UK so they can deliver their guaranteed energy prices the over-due and over budget reactor they desperately try to finish will generate.
It's so fantastic that every summer they have to buy dirty coal energy from Germany because their rivers get too hot and every winter because...it's too cold and their ageing fleet is breaking down all the time.
The success is so staggering that they plan to reduce their fleet by 50% until 2030 and replace that with renewable energy.
Hooray...
---------------------
Edit: since the Astro-Turf reached me and I can't reply anymore due to downvotes, here are the answers to Bayart:
> I don't down where you get that broadly France relies on German coal in the summer and winter.
Why do you try to lie about something everybody can google. This is the first result for "France river hot":
https://www.reuters.com/article/us-france-electricity-heatwa...
> Pretty much the entirety of the problems we've had with the EPR program has to do stopping building nuclear power plants for decades and losing the associated skill-set and industrial base.
Weird because EPR didn't stop building. They just stopped building in France so this can't be right. Also: the reactors currently still under construction started construction when all the people from the peak construction times where still there. They still can't manage to build on budget or on time. Not even close.
----------------
@corban1:
Only because Germany doesn't hide their subsidies doesn't mean that the French taxpayer is not paying for their ageing fleet (or overpriced projects abroad) with their taxes...
Also the fact that coal is an important job motor in troubled regions of Germany which is why it's still there (but is being phased out completely soon).
Seems the success is very clearly visible both environmentally and economically?
[0] https://ec.europa.eu/eurostat/statistics-explained/index.php... [1] https://www.statista.com/statistics/1190067/carbon-intensity... [2] https://www.umweltbundesamt.de/en/press/pressinformation/co2...
>It works so "well" that the French taxpayer will have to pay the UK so they can deliver their guaranteed energy prices the over-due and over budget reactor they desperately try to finish will generate.
Pretty much the entirety of the problems we've had with the EPR program has to do stopping building nuclear power plants for decades and losing the associated skill-set and industrial base.
In 1999 a new reactor started in France (Civaux-2).
In 2005 a new building site started (at Olkiluoto, Finland).
Even by considering start dates (Civaux-2: 1991) and neglecting that skills are needed during the building (and not only when it started) they only are 14 years apart.
Moreover many skills are needed for the maintenance of the existing fleet (in France).
Olkiluoto was planned as soon as in 2000, when its builder Areva NP created an agency in Finland in order to sell the project.
Also: most skills (concrete, welding...) aren't completely specific to the nuclear industry: part of those are shared with many other fields.
How a huge and well-organized heavy industry which sells projects could let key skills evaporate in a few years (no, not 'decades')?
this missing capacity is less the usual slowdown of reactors because of the hot rivers (which by the way is done for environmental and not technical concern) and maintenances process, than a consequence of a previous nuclear plant closing (for political/electoral reasons). another consequence of this missing plant was to reopen two charcoal power plant _this_winter_.
a large part of the EPR slowdown in fr is due to security concern that changed while the project was already started, china EPRs which was similar but a lot less constrained was done in time.
on the price: 25% of the energy produced by nuclear in fr is sold under the market price to private retailers because of anti-monopolistic EU laws and stupidity of our governement. the electricity price in EU is usualy indexed on the worst gaz plant available, with the actual price of gaz raising and all of the 25% already acquired, a lot of them are just closing.
given those constrains, yes this model works more than well...
the project to close "50%" (in fact 15 reactors) until 2030 is another political subject which will probably never become a reality given that most renewable alternatives projects end up being blocked/hated everywhere.
funny fact: replacing ALL the current transport and electric energy supply in fr by wind turbines has been evaluated to require one of the most efficient available turbine for each km² on ALL the french territory...
No, it was late and overbudget.
https://en.wikipedia.org/wiki/EPR_(nuclear_reactor)#Taishan_...
The report was from 2019 because it was the first search result. This is an ongoing issue and not getting better: https://www.montelnews.com/news/1198233/heatwave-impact-on-f...
Also:
https://www.reuters.com/article/uk-france-power-winteroutloo...
https://www.montelnews.com/news/1266598/-france-faces-winter...
https://www.connexionfrance.com/French-news/People-in-France...
https://www.argusmedia.com/en/news/2113554-french-tso-rules-...
This is why you diversify your energy.
And I mean seriously...this is France we're talking about. Those informations are easy to google. Please stop spreading misinformation.
> a large part of the EPR slowdown in fr is due to security concern that changed while the project was already started, china EPRs which was similar but a lot less constrained was done in time.
Yeah they should just look away more like in China...it's just a nuclear reactor after all! France should also get some Tofu-dreg experience from China. This is the way.
Sorry...but I can't take such statements seriously. It's madness.
> funny fact: replacing ALL the current transport and electric energy supply in fr by wind turbines has been evaluated to require one of the most efficient available turbine for each km² on ALL the french territory...
Why would you even evaluate such a narrow scenario? This is beyond stupid. Renewables are not just wind.
Also I doubt this has been done seriously since there was a study years ago that you could power the whole of Europe if you take just the available building space on the coast and use wind.
yes and all your sources are post 2019 (the fessenheim reactor has been slowed since 2017, the project/idea to close it started in 2012, and the effective (not reversible) closing has happened on feb 2020 while it was stopped since more than 2 years) dont really see what's your point here...
> This is why you diversify your energy.
no, our electric mix was simply not build on nuclear, hydroelectric and charcoal was our first power source, nuclear allowed us to close charcoal mines and plants while fullfilling the growing electric needs. nuclear is'nt without constrains that hydroelectric dont have, however there is not much more places to have new hydros. "renewables" will maybe goes up to 8% in the coming years and has already cost us more than 50billions€ (governement subvention) which is nearly two time our current non running EPR cost :) note that those 50billions was only for deployment they does'nt include exploitation cost, that's a big difference between wind turbines and nuclear, nuclear cost is mostly capitalistic (start investment for 60years in the case of an EPR) while wind turbine cost must be evaluated over their full lifetime including market fluctuations, try to evaluate that for the 60 years comming, good luck!
> Yeah they should just look away more like in China...
what's your point here again ? changing a project constrain while it is already started add cost and delay, however once done, acquired expertise usually reduce cost and delay. we have choosen our way to do it, probably for good reasons.
> but I can't take such statements seriously. It's madness.
actually this is your statement, your making a straw man here.
> there was a study years ago
what let you think that an old study with probably outdated constrains and knowledges would be more serious than actual studies from recognized sources (ecole polytechnique, les mines) ? and more important, those studies to be comparable must have the same subject, replacing nuclear with wind turbines is not the same as replacing nuclear + transportation(gas) for example. with the current urge (climatical and political) to reduce gas based transportations, there is also an urge/need to grow electric supply up to two time the actual production (unless your looking for economical collapse by replacing gas with nothing). from this point of view, current renewable are just a joke in france since we have no industries on renewables (they poorly failed/died) which means we will be fully dependent on external supply, and yes that's madness.
ho one last point, those studies are usually done with wind turbine because solar panels end up using a lot more surface than wind turbines, that let you think of the surface needs with a mix of the two...
> this is France we're talking about. Those informations are easy to google.
actually i'm french and in france (in case my poor english was'nt a sufficient hint), those subjects are a perpetual technical and political debate here, i dont really need google press report to explain me what i'm living (actually its a known fact that press is'nt an opposable source in techical subjects, try google schoolar maybe...) :)
We need different nuclear reactors, fast reactors or thorium that use uranium more efficiently to stave this off, but they're more dangerous and still experimental, respectively.
I think we're better off using that nuclear money into building lots of grid storage for renewables.
This is a little pessimistic: these numbers rely on current proven reserves without reprocessing. Of course, if you want to use a bunch more uranium, prices will go up and the number of proven reserves will increase. This won't necessarily take a massive price swing-- heck, even at current prices new reserves will continue to be found.
> Then the price will skyrocket, and nuclear is already more expensive than renewables.
Fuel is a negligible portion of the cost of nuclear. You could triple the cost of fuel without materially impacting the operating costs of a reactor, and the overall costs of nuclear energy are not dominated by operating costs, but instead capital costs.
And, we're leaving out that reprocessing fuel is possible and proven (though there are proliferation concerns0.
This has already been addressed. Natural uranium can be gathered from seawater at about 2 to 5x the current cost. Considering how small fuel costs are in nuclear, that isn't much of a problem. And the amount available from all the world's oceans is orders of magnitude greater than that available from terrestrial mines. Even if we start extracting vast quantities from seawater some believe that more will be leached from rock, renewing the supply.
https://engineering.stanford.edu/magazine/article/how-extrac...
https://cna.ca/2016/07/27/theres-uranium-seawater-renewable/
"The advances by PNNL and ORNL have reduced the cost of extraction by a factor of four in just 5 years, but the cost is still about $200/lb compared to traditional uranium mining which ranges between $10 and $120/lb."
Nothing happened. The reactor just sat there peacefully doing nothing, because it was a fast neutron reactor, the EBR-2.
> they're more dangerous and still experimental
They were neither in 1986. But sure, let's build more "grid storage", which isn't even experimental.
This isn't a reason to not do it. That gives us 40 years to figure out alternative processing patterns or alternative energy production.
It seems that in their strange world every citizen is either pro-nuclear or a hippie living in a caravan. This is not how they will sell it.