So why are graphics cards, gaming consoles etc out of stock? Why is Apple attributing fewer iPhones sold to semiconductor shortage?
Can automakers not use a 7nm fab?
How much of the chip shortage can be attributed to AMD and Apple taking the laptop market away from Intel? And if this is true, does this mean that Intel now has unused capacity?
2. If you look at that chart, you will see that the decade previous to the pandemic was the worst ever for durable goods demand. Supply chains had adjusted to that.
3. Supply chains had also all gone to a JIT model to keep inventories lower. This was a huge source of efficiencies, but made them vulnerable to a demand shock.
4. There are new sources of chip demand in EVs.
5. There are new sources of chip demand for very cheap ARM and RISC-V chips. High volume, low margin stuff that has been underinvested for manufacturing, like the entire auto chip chain.
6. 2019 was a down cycle, and companies were idling capacity.
7. When the pandemic hit, companies projected lower demand, and idled more capacity. This put them in a huge hole from which they still have not extricated themselves.
8. COVID outbreaks in Asian factories complicate things
9. Transportation bottlenecks complicate things
1. Yes, everyone cancelled orders and idled capacity. Everyone was anticipating a deep and long recession until the fiscal/monetary bomb of March/April 2020. See #7 above.
2. The 120nm legacy nodes and similar are right at the center of the whole shortage. This has been underinvested for years because it has been low demand growth and low margin. Automakers are particularly vulnerable, because for years, every new feature has gotten its own cheap microcontroller to run it. There are now dozens in new cars.
3. Graphics cards have been affected by crypto miners sucking up supply at any cost, and everyone not named “Apple” competing for TSM’s top end processes.
4. iPhones don't just come with Apple A-Series chips made on TSM’s top-end node, but a host of others, some made on legacy processes where the shortage is. Likely we are talking about some cheap analog power chips or something like that. Apple has decided to push as much supply chain problems to iPad as they can.
5. For the vast majority of what automakers want, 7nm is overkill. Once there are more high end SoCs running multiple systems including self/assisted-driving, that will come into play. But that is not where the shortage is concentrated.
6. Apple was Intel’s 4th biggest customer before they left, so it has had a small impact, but only at TSM at their top node. Samsung has picked up Qualcomm and AMD as a result.
Crazy times in the semi world.
On #1 also bear in mind that the supply chain is deep and complicated. OEM (GM, Toyota, Tesla, Ford etc) orders a number of COMPONENT X that contains a chip from a Tier 1 supplier. Tier 1 supplier order subcomponents from other suppliers. (Continue this until you have built a very confusing interdependent supply web).
At any level of this, anyone could have (and did) cancel their orders in 2020. As in OEMs cancelled some orders, Tier 1 suppliers cancelled some orders, Tier X suppliers cancelled some orders, etc.
I like to say that reality cannot be reduced to a single variable. It is a complex multivariate problem.
Most reporting out there on any subject reduces that being reported to a single variable. Example: Container shortage > bad > supply chain crunch. Etc.
The overwhelming majority of people have no practical understanding of business and, in particular, manufacturing. The complexities involved --the variables-- do not exist in their realities. What you explain about the supply chain is a revelation to almost everyone reading it. Even with this, reality is far more complex than what any of us can explain in a couple of paragraphs.
I have lived through a couple serious supply chain issues in the last several decades. This one is a bit different because almost everything in technology products is affected. It's one thing to re-spin a design because one chip becomes 60-week unobtainum, quite another when you can't get 75% of the BOM for 40 weeks.
> 5. For the vast majority of what automakers want, 7nm is overkill. Once there are more high end SoCs running multiple systems including self/assisted-driving, that will come into play. But that is not where the shortage is concentrated.
There was a discussion about this a few months ago. It's not just that newer nodes are overkill, it's that auto components apparently have very long and expensive validation requirements, which would be another explanation for why they are still depending on these older manufacturing processes.
Also, if you're on a 7nm process, odds are there's not a decent way to e.g. drive the transistors for your power window actuator. Samsung's 7nm process has an 3 sigma intrinsic breakdown voltage around 4.8V, which precludes any kind of 5V tolerance and driving 2.5Vt power FETs.
Little 3V3, 5V tolerant microcontrollers are good for a lot of things, and they belong on bigger process. While 10nm might be able to do it, there's not really transistors for it in most libraries.
Most of the 8inch wafer supply (mostly >90nm) was no where near capacity before the pandemic and supply restrictions. China did buy up a lot of it (actually moving equipment) and perhaps those were closed down?
Much of the legacy 12inch supply was fairly constrained even before the pandemic (especially specialty 55 and 40nm) due to shifts in display driver needs for OLED. The relatively new 10 & 7nm were pretty well dedicated to known customers.
Much of Automotive is in the larger 180nm to 90nm range with some 28nm for SOC due to cost, reliability, and legacy test qualifications. Except for entertainment only Tesla really uses much smaller than 22nm. It's interesting that they seem to have been willing to use commodity processors much more, and that seems to have made their supply chain more resilient (at the prices they were willing to pay).
It's interesting because a lot of mixed-signal analog really doesn't shrink well 28nm, and requires a lot of redesign to be cheaper than 180nm. There are ways to get down to 14nm and below, but the design costs require huge economies of scale to pay off.
The last couple of years in Semi really has been a game of how much are you willing to pay for the old backlog of parts that were hard to sell earlier. Only now are some new designs really making it out a year later. It's supply chain, but it's also price gouging and just taking profits while you can (why build more when margins will only plummet?). I do worry about the risks of concentration of this production in China.
To give you an idea of what we are talking about, here’s Infineon’s product page. They are a big automaker supplier, and right in the middle of all this. https://www.infineon.com/cms/en/product/
Source: Spent many weeks fighting supply chain issues and leading redesigns in 2018-2019 due to the beginning of the chip shortage.
I know the shortage is associated with the pandemic because that's when most people started hearing about it, but it was a growing problem even before COVID came along.
Volumes were 1-10 million annually.
I think it's worth emphasizing this - all of the other issues you describe are correct, but what's allowing individual disruptions to turn into a global crisis is a lack of buffering between components of the individual systems. This is a known issue with JIT, and in some ways it's factored into the models - assuming one bad year in ten, 9 very good years can still be more profitable than 10 pretty good years - but it widens the possible set of outcomes and allows for these kinds of cascading failures, which makes it harder for one institution to model or plan around.
https://techwireasia.com/2021/12/malaysian-floods-devastate-...
I think there are also new sources of chip demands in other industries, such as perhaps companies utilizing ML having their own chip designs. But I'm not sure how much that plays into the issue.
1. There was real and relatively sudden increase in demand:
a. COVID-driven in part, all students and many additional employees had to buy computers to study/work from home,
b. a., driven by video, lead to increased demand on Internet & telecom infrastructure.
c. Electric vehicles consume an order of magnitude more chips than ICE cars. EV demand is also skyrocketing.
2. There were fabs (semiconductor factories) shut down due to COVID. This one in Malaysia [0] makes power chips and was particularly problematic for ICE auto makers.
3. The first indication of problems manifested in chip lead times pushing out. As buyers started to see more and more of this, they started increasing orders and soon adopted a hoarding mentality, similar to why many of us couldn't find toilet paper in stores early in the pandemic.
Result: As a personal anecdote, a chip that sells for $0.47 from that fab in Malaysia recently sold for $75 on the broker market.
Note that no, the state of the art fabs cannot be re-outfitted to make legacy chips. The old equipment they were developed on is generally no longer available and the profit from making those inexpensive chips would not justify the capital spend on new equipment.
[0] https://www.reuters.com/article/infineon-results-malaysia/in...
What happened then is that the vendor prioritized larger more expensive parts. They use more silicon per part but the over all profit per wafer is higher. It's not a terrible decision, it's possible to move designs to an over provisioned FPGA but usually not the other way. The lead time for higher end parts started coming down, not to normal, but less than a year. Meanwhile lead-times for the low end parts kept getting longer.
Nobody's going to fabricate semiconductors in their garage. But couldn't someone make a modest profit without first investing $2.0e10, like Intel? Or is it just that the profitability scale is such that if you had an extra $2.0e7 to invest, you're better off buying Intel stock?
2) the equipment used in older fabs, is in many cases not even made any more. It's much like why the vinyl record manufacturing took a decade or more to ramp back up when the demand for vinyl records began going up instead of down. Nobody was making that equipment any more. The older fabs don't use the same equipment as the new fabs, except less of it; they use quite different equipment, and in some cases newer equipment actually wouldn't be able to make the older chips. I don't work in semiconductors, but I did from 1989 to 2004, and worked on several cases of trying to move old processes into newer fabs. It's not easy or quick, and in some cases you have to move the old fabs' equipment into the new fab.
The answers I hear range from a deeply embarrassing and complete loss of competency on all levels, but primarily on the fab side, to an utterly incompetent and out of touch leadership. I favor the latter explanation as intel has been underperforming for nearly two decades now. My best guess is that intel has entered its cash cow phase, and will simply phase out product after product as they become obsolete, ending up as a half dead zombie barely supporting a few rare products in a few decades. Problem is, even if thats what is happening, their stock is surprisingly cheap. So it seems analysts seem to know something important I am completely missing.
Not to say they are the only company that fucked up, amd has been offered the same subsidies for building more fabs, and we arent talking 2020, we are talking for more than a decade, and they also havent for very unclear reasons. Amd also fucked up and completely missed machinelearning due to being unwilling to make a convenient interface or even just halfassed support for cuda. But they did that while nvidia went, ah fuck it, well let amd get every major console, and basically only make gpus with graphics ports as a side project.
Amd and nvidia is havent acted optimally and both have failed to exploit what seems like low hanging fruit, but they are highly valued in a way which matches market demand (which has been increasing quickly since 2014, not just 2020), and their improving technology. Intel however, does not even appear to have tried. Performance improvements have been incremental at best, and some "features" like the built in gpus are so terrible they mostly degrade performance.
Car manufacturers are clearly going to start building huge inventories of them though:
> “Because of a 50-cent chip, we are unable to build a car that sells for $50,000,” said Murat Aksel, head of procurement for Volkswagen Group, during a press briefing in Munich last week. [2]
Ouch. Though honestly, this probably ought to result in some execs being fired... If you sell 100k cars a quarter, imagine telling the board that you saved the interest on $200k and the rent on a small room and that's why you're not selling a vehicle.
[1] https://www.reuters.com/business/autos-transportation/texan-...
[2] https://fortune.com/2021/09/17/chip-makers-carmakers-time-ge...
It should, but it won't because everybody failed the same way.
It was just like the 2008 banking crisis. Lots of people saw it coming, but reasoned "If I predict doom and mistime it, I'm an outlier and get fired. If I simply keep my head down and cash out and it all goes pear-shaped, I'm simply one of the masses and nobody will notice me."
For the next 3 years, fabs will be swimming in profit. After that, I expect a major correction.
Sounds they'll dump it in trash eventually and it'll be a terrible waste of resources
EOL for these chips usually means a bunch of firmware engineers in sustaining need to scratch their head and read 10-15 year old documentation to find a viable replacement.
Source? My impression is just the opposite. Batteries and an electric motor is a relatively simple device compared to a gas motor. So you replace a fuel pump (and related sensors), cat converter (and sensors), transmission (and sensors), and a hugely complex (1000s of parts) engine (and sensors). Managing maximum efficiency, torque, and HP across the entire RPM range while minimizing emissions is quite an intensive process. Not to mention the interaction between the engine and the (compute controlled) transmission. Especially these days when the simple rules are gone and managing turbos, heat management, etc means that you might give maximum HP, but only for 5-10 seconds or even idling unneeded cyclinders, stopping the engine at redlights, etc.
Tesla in particular as moves many distributed chips into a highly integrated single board, various people (like Monroe on Youtube) claim the Tesla model3 has a market leading level of integration replacing dozens of distributed CPUs with a custom board/ASIC.
https://www.idtechex.com/en/research-article/ev-power-electr...
Streaming music, maps for nav, top down views that integrate numerous camera/utlrasound etc sensors, onstar (and similar), traffic updates for maps, bluetooth connections/app for phone, etc seem common on pretty much all new cars. At least they were in the subaru, honda, bmw, and VW cars I was test driving. A center console mounted screen for entertainment/maps/music is becoming very common on pretty much all new cars I looked at.
Most semiconductor companies are public companies, with deep pockets and plenty of cash on hand. They invest based on forecast demand.
Interesting. I had assumed that the difference between state of the art fabs and older fabs was that state of the art fabs can make smaller things, and perhaps more geometrically complicated things, but that they don't have to. If they wanted to make a design that only uses bigger things and simpler geometry they could.
Where does this assumption break down?
As those chips run through their life-cycle, their value drops. After 15 years, the price the chips can sell for will drop 90% or more.
If there is a spike in demand at that point, there is no ROI on purchasing brand new equipment.
The demand spike is seen as temporary. Hence, the chip makers are telling the buyers to design out the old chips and upgrade to new. Many companies can do this. But some are constrained by industry regulation (aerospace) or industry practice (semiconductors).
I've mentioned before the irony that companies that make semiconductor equipment are struggling to ship more tools because they can't get enough (of certain chips) to complete building them.
>Where does this assumption break down?
Why would they want to? There is heavy and overbooked demand for the 'smaller and complicated things' that make more money, and add the extra cost of the design to make the 'bigger and smaller' things, and it's a no brainer.
From what I've read, the way a layer on a chip is made is a coating is deposited on the surface that is sensitive to light at certain wavelengths. They then use light of wavelengths that the coating is sensitive to in order to transfer a pattern from a photomask to the surface, making some change to the coating at those places where the light is not blocked by the photomask. Then they can treat the surface to remove the coating at those places were it was changed by the light.
They then can deposit thing onto or remove things from those parts of the surface not still protected by the coating. Then they can use something that can remove the coating. The result is a layer on the chip with things deposited or removed right where they wanted them to, as determined by the pattern on the photomask.
Repeat for more layers.
The major improvements from generation to generation are the ability to use shorter and shorter wavelengths of light for the photolithography which allows for transferring patterns that have smaller features, and maybe the ability to make thinner layers so you can make chips with more layers.
I don't see anything in the photolithography process that requires using small feature size. If for some reason you wanted to build an older chip that only used much larger features, I'd expect that it would just be a matter of using the photomasks for that older chip, and setting the layer thickness to what the old design called for.
It is quite unlike, say, PCB fabrication, which is way more flexible with regards to layer stack-up.
I vaguely recall a shortage of epoxy resins as well. (For packaging chips, and for printed-circuit boards). It seems like more went wrong than usually does in 2020-21, even leaving aside the pandemic.
https://twitter.com/wired/status/1335445557788233728
https://twitter.com/BitcoinMagazine/status/14149943888208977...
https://twitter.com/dmgblockchain/status/1438547780646019086
AFAIK, the cost to add significant additional manufacturing capability for most products means that increased demand has to be forecast for a really long time to be worthwhile. Hence why it was still hard to find quality nitrile gloves, isopropyl alcohol, and Clorox wipes during 2020 even though everyone knew there was a bigger market for them for potentially quite awhile. I'm sure the chip and hardware manufacturers don't want to invest millions or billions in assembly line machines and then have buying levels drop back to pre-cryptocurrency-mania levels.
It seems its invisible hand is a bit self-serving, go figure...
Perhaps if the gamers wouldn’t jump to calling any price increase over an MSRP defined in 2019 “gouging”, there would be some incentive to prioritize those parts.
Instead, the fair thing to do is to force everyone to camp on Twitter and wait for the “20 Xbox One X/PS5/GTX#### available at Walmart [update: sold out]” post lottery.
It is amazing to me that manufacturers (to be fair, per gamers’ demands) are giving money away to scalpers, instead of using the revenue from higher prices to buy more manufacturing and shipping capacity.
NVIDIA at least have been trying anti-cryptomining measures in their firmware. A form of defensive innovation, I suppose.
The crypto advocates really do not want to hear it, but their proof-of-waste scheme has big negative externalities for other people.
Of course it is.
If revenue fell by 90%, nvidia would spend much less on R&D and progress would be much slower.
If revenue doubled, nvidia would spend much more on R&D and progress would speed up.
If revenue fell to $0, nvidia would go out of business, spend $0 on R&D, and progress would halt.
There's a direct, although not linear, relationship. The more money there is, the faster progress is (as long as you trust nvidia to spend it wisely and execute)
I don't mine crypto, but I like fast tech, so I say let the money keep flooding in so we all benefit.
(*) {currentDate} + 18 months*
So whether automakers could use a 7nm fab is a theoretical question -- there is but one 7nm fab, the one at TSMC and they already sold every wafer they can start. They would be able to sell more if they could start more but there are only so many EUV machines ASML can make so there are only so many wafers TSMC can make. All the gaming consoles? yeah, that's 7nm chips. With AMD and Apple moving to the next line, there'll be some capacity freeing up but the demand is still very, very strong.
Also, another effect I do not see here is the container disruption. Read https://www.vox.com/recode/22832884/shipping-containers-amaz...
Putting an STM32 onto N7 would be nuts.
https://www.prosoundnetwork.com/business/akm-factory-fire-sh...
There are other companies that make similar chips, but in much smaller quantities, and they are really in no better position than AKM to fill the void.
A recent "update" : https://evertiq.com/design/51031
This caused a bunch of chips that are old and cheap to be complete unattainable, due to a lack of safety stock across the industry. Cars, power supplies, and other "large" things are highly dependent on these older chips, and have very long redesign timelines.
Newer generation is actually simpler, its just demand growth outstripping supply. I'm sure 2020/2021 also impacted the ability to bring more capacity online but probably only to a small extent, these are long term investments that aren't responsive to instantaneous demand.
However, older chips are difficult to increase capacity for. The tools are not available, and the profit from legacy chips from them is many times insufficient to make the business case for.
Intel offered car manufacturers 16nm chips "as many as they wanted", but they'd have to be re-engineered from, from what I read, 150nm and certified for harsher conditions (temperature, humidity, acceleration, probably noxious fumes if installed under the hood) than consumer electronics, which adds to the cost.
In addition to that, with the upcoming switch to electric cars they probably wouldn't produce enough of them to recoup the investment.
This massive jump in demand has caused backlogs. Covid supply chain issues didn't help.
It would be nice to get to the bottom of these issues I keep hearing about. Yeah, COVID was/is a big thing but when it comes to feet on the ground, what's the impact? Not this much surely.
Not to be conspiratorial but is this a cover story we're being given? Why does it feel like there's suddenly this massive void in productivity?
Yes, this much. I saw someone explain this well enough on reddit, but I can't find a link so I'll try and paraphrase it.
Let's say you're a lumbermill and you run at 100 boards a day in normal times, with enough capacity to do 110 boards a day if you stretch. COVID shut you down for 3 months. You now have a 9000 board deficit from your normal production, with people lined up to buy the boards before you've produced them. Once you get started again, you crank up capacity to 110/day - it takes you 900 days - almost 2.5 years - to recover that original shutdown deficit, without accounting for any of the increased demand for your product.
This is roughly what other industries are experiencing. "Why don't you just make a new factory to increase your production?" well, it would take a long time to do that, would take a lot of capital, the shortages impact you too, and there's no guarantee that once COVID passes, demand won't go back down to 100 boards/day leaving you with a huge unnecessary capacity.
A simple example, of course, but this kind of thing is happening in some form or another in most industries, and will just take some time to work itself out.
Just to tack onto it...
> Once you get started again, you crank up capacity to 110/day - it takes you 900 days - almost 2.5 years - to recover that original shutdown deficit, without accounting for any of the increased demand for your product.
This is best-case scenario. Likely is that a few % of your workforce will have been out sick with covid (or even passed away), and a few % of your workforce may have quit to care for family, or quit for better pay elsewhere, etc. So your "work extra hard to hit 110/day" is more likely "work extra hard to stay at 100% or even 90%". Especially limiting if you need to buy parts for your output that may be delayed due to others who are behind.
First, you had a massive lockdown in China in January 2020, which shut factories temporarily. Then when those factories came back online, the production lines had to be reconfigured so that stations were 2 meters apart. At the same time, a lot of the collaboration that typically happens by people from a company flying out to China to meet with the supplier face-to-face were shifting to video, which frequently met that at least one side of the call was early in the morning or late at night. And as all of that was happening, there were also large shifts in demand as some products saw spikes in orders. That pattern then repeated itself across the world - a company might move production from China to, say, Indonesia, only to see the new factory have to temporarily shut down.
I can imagine that two years of this would create major backlogs and disruptions.
To turn silicon crystals into a PS5 requires multiple steps in the supply chain which, when running smoothly, have multiple steps where people may be planning years in advance.
Sony builds their products out of dozens of components from different suppliers, which themselves may be made out of finished materials provided by other manufacturers, which in turn may be made out of chemicals or raw ingredients from other companies. The dependency tree is quite big, and if any of them are messed up, you can't finish your product.
Normally all of these dependencies are planned well in advance (quarters or years) so that everything is ready when the time comes to ship. Mess it up one level deep, and you're a quarter to a year behind. Mess it up two levels deep and you're two quarters to two years behind.
On top of this, semiconductor production was already stressed to its limits before COVID.
A few months ago there were seventy billion dollars of goods anchored off of LAs docks alone. Some of those were finished goods, but some are intermediate goods.
It's so bad that it's cheaper to make new shipping containers in China than spend the time to return them once they've been used once. We have a glut of practically new containers clogging up our infrastructure.
Even as COVID stopped causing the direct backups, backups propagate all on their own. Like a giant traffic jam and you get to the front and the accident was cleared hours ago.
The bad news is that we'll forget it again.
Meanwhile the cryptocurrency boom provided a means to turn graphics cards into virtual money, so those all got bought out.
All while staffing, mobility (can't fly troubleshooters out so easily!) and other aspects of working have got harder, and a related physical shipping crisis is causing an increase in inventory both at factories and in transit.
Its just a bottlenecked queue, that then became closed off, which amplified the size of the queue so much faster.
Automakers caused this. The issue is not just that they fucked up and ruined the market that one time in mid/late-2020. The issue is that that one fuckup destroyed the confidence in the market. So you can no longer rely on stock being there when you need it, meaning you need to buy as much as you will ever be likely to need, because you don't know when you'll be able to buy again. So you buy as much stock as you can afford to, and if you can't afford to you borrow money and buy it anyway. This is a big problem, because the signaling mechanism of the market is broken. Any stock that shows up now will be gone instantly, but the aggregate demand for parts hasn't really moved - people don't need significantly more parts, but they do need to be certain they'll have them when they need them, which is why they buy more than they need now. At some point you have enough stock and don't need to buy again for years. This is why it doesn't make sense for semiconductor manufacturers to build out additional capacity - by the time it's up and running 14-18 months from now, there's no guarantee anyone will be buying parts in anywhere near the volumes that are needed right now. So this demand shock at the moment is temporary and nobody can predict how long it will last, but you need to know demand way out if you're going to set up a fab expansion. This is why the bullshit move that automakers pulled is having so much outsized impact on the entire industry.
To answer your other questions:
All complex devices with large number of parts in them are super vulnerable to one tiny part halting the production of the entire device. This is why complex devices are poorly available. For GPUs and game consoles in particular there's an extra market-distorting factor of bitcoin fuckers and scalpers, respectively. Apple builds complex devices with large numbers of parts in each.
You can't use a 7nm fab to build things you would normally build on 120nm. Not only is there way too little 7nm capacity, and it's much more expensive per chip, but the smaller the node size the higher the defect rate is going to be, and the lower voltages your parts are going to be able to handle. Automotive and power electronics need to handle high voltages. You will never see 7nm process parts being used for switching mains voltages, for example, or driving 600V motors. In addition, designing parts for newer processes is a lot more work and has very long setup times.
None of the chip shortage can be attributed to AMD or Apple or Intel. They are a totally different category of part/process than the ones that are currently most affected. Intel is still operating near their capacity and selling countless server and laptop CPUs. I don't think this is a factor at all here.
For a board I just designed, I need 22 uH inductors. I ended up ordering two substitute parts, then just today was able to order the desired parts. Those substitute parts will likely be scrapped. Hell, we now order parts before the design is finished, then switch parts mid-design. The board is not ordered until all parts are in hand. It’s a massive waste.
People who are more likely to be concerned with covid (more educated) are also more likely to consume electronics, so demand on electronics is particularly increased.
Supply side issues are secondary and by now they aren't a big deal at all.
You cannot take a, say, 150nm or 45nm design and just rescale it in Photoshop to make a 7nm design.
Not only does electrical characteristics change which might require changes, such as leakage currents, but in order to reach the densities of "7nm" things such as transistor construction has changed. For example older, larger nodes used planar transistors while a modern node likely uses non-planar transistors like FinFET[1]. A nice write-up can be found here[2].
The point is, moving from one node to another, especially if they're far between, might require a huge redesign, along with all the validation and testing that entails. A new set of masks for the latest nodes is also very expensive[3].
[1]: https://en.wikipedia.org/wiki/FinFET
[2]: https://semiengineering.com/knowledge_centers/manufacturing/...
[3]: https://anysilicon.com/semiconductor-wafer-mask-costs/ (not current but illustrative)
Consumer electronics including GPU and consoles demand have increased dramatically due to pandemics. And they use components that uses bigger nodes which are in demand.
>Can automakers not use a 7nm fab?
They could but even 7nm are in short supply.
>How much of the chip shortage can be attributed to AMD and Apple taking the laptop market away from Intel? And if this is true, does this mean that Intel now has unused capacity
Both AMD and Intel are at full capacity. Intel still have server capacity to fill.
Read the Bullwhip effect. [2].
All of that is excluding crypto, and investment / trading ( buying and hoarding ) in semi- components.
This caused a scramble where customers found alternate paths to satisfy requirements. Buying up stock of other, similar chips (which now creates a shortage of chip "b"). Reserving time with a new fab. Or deciding not to have navigation in certain car models. Or halting sales for a while. All of which drives another cycle of churn into the schedule.
This repeats itself over and over, like an earthquake with aftershocks, until things smooth out.
I think there are other reasons for the shortage, but they've been exacerbated by the inflation issue.
I guess I'm asking if this theory has any credibility outside of the various conspiracy theory blogs/sub-reddits?
Even for most of the hard-to-find things, many of the hardest-hit businesses haven't significantly raised their own prices. E.g. in-demand new cars have dealer markups but largely haven't seen huge bumps in MSRP even when sold out like the Ford Maverick or Kia Telluride. PS5/Xbox/Switch prices have been flat. Apple device prices haven't seen any unusual spikes due to shortages.
There's the interesting question for the conspiracy folks: why aren't many of these businesses raising prices? Why is Sony letting resellers sell PS5s for over $100 over MSRP still (e.g. https://stockx.com/sony-ps5-playstation-5-blu-ray-edition-co... ) instead of meeting demand where it is?
Probably those businesses see the PR hit of big MSRP bumps as worse than the short term boost in revenue from capturing more $$$ from the high current demand.
If you mean, this whole problem wouldn't even exist if the businesses weren't trying to create it, no that is not the case. They were fully as greedy and deceptive before 2020.
It should also be pointed out that some businesses involved had, in fact, too low of a profit margin to invest in new capacity, so trying to raise prices and increase margins, while self-interested, isn't always bad from the perspective of the entire economy. If you want new capacity, it needs to have money put into it to make that happen.
Automobile manufacturers are used to ordering suppliers around wrt price, lead times, and so on. Chip makers used to put up with that, but when things got tight and other folks started waving dollar bills around, the chip makers said "hold it - we can get paid more AND not have to deal with those jerks?"
Price cant adjust: Long term contracts, regulation etc.
Supply cant adjust: Move to newer chips (so essentially misplaning), shortage of people, congested supply chains etc.
1) The pandemic resulted in a significant increase in demand by businesses buying laptops/PCs for employees so they could work from home. Lots of GPUs there and they are still buying.
2) Lots of people as individuals buying gaming PCs and consoles since they were spending much more time at home and wanted something to do. They too are still buying in record numbers.
3) With AI being a hot field right now, lots of GPUs being purchased for deep learning by researchers and businesses. Maybe this is a permanent increase in demand, maybe not... time will tell.
4) With cryptocurrencies being white hot right now, lots of GPUs being purchased for mining.
So you might say 'well why not just build more fabs/factories/whatever and they can all make lots of money?' Well sure, for now. Fabs cost billions of dollars and take a couple of years to come online. The companies that have to invest in them likely spent much of 2020 and 2021 doing everything they could to increase production in the short term while asking themselves 'how much of this demand is long term?' as all of the items listed above are relatively recent changes, rather than things proven to be structural changes. It sounds like by mid- to late-2021 companies like TSMC decided to take the plunge after securing some up front payments and volume commitments from major customers.
In addition to concerns by companies like AMD and nVidia about how long term items 1 and 2 are, they know for a fact that 4 isn't likely to be sustainable given that there was a major crypto crash in the last 5 years and likely to be another one soon. When this happens, this will not only decrease demand as crypto miners stop ordering, but it will likely also increase supply as miners dump their GPUs on the used market (Ebay etc.) to cut their losses. If you follow the GPU news, you'll notice that AMD and nVidia are being very strategic in releasing new mining-specific GPUs. This is partially to offer products that specifically target the needs of miners, but I suspect more to minimize how much of this product can be dumped on the used market hurting GPU demand from consumers down the road.
In addition to all this going on specific to their industry, they're dealing with all of the other manufacturing and logistical issues everyone else is. So they're also having to figure out how to get that PITA power/memory/whatever controller that they need manufactured in quantity and in time to build their own products and so on.
So these companies are responding: they probably did as much as it financially made sense for them to in the short term while also adjusting their longer term plans. I'm expecting them to come online with significant new supply (for the new products released in 2022) just in time to see it dry up soon after (at least in the short term) since that's typically how these things go.
>> If there were classified orders taking up fab space, would we ever know?
The shortages could have led to larger back-orders, and potential "double booking". Those orders is probably a trade secret, so it probably won't be easy to find out.
Just before the pandemic, everyone was optimising for zero inventory, and probably now you have a feedback loop which probably overshoots a bit in the other direction too.
You need something in half a year or a year, you likely order it right away instead of doing it just-in-time.
Everyone at every level in the supply chain is buying six months of buffer stock. Then when normality resumes, everyone will consume their buffer stock while cancelling orders, leading to layoffs, idling, and potentially bankruptcy of component manufacturers and another induced shortage.
Processors are a commodity and everything but there just aren't enough suppliers with good enough product at a low enough price. The process is toxic and complex and requires heavy investment.
It's almost a miracle we get to see the type of efficiency in development that we do today (although others may call this miracle a spiraling debt crisis..)
When he placed that trade embargo on China, many companies were forced to change their orders to factories in other locations, such as Taiwan. These factories were already running at capacity.
Edited for source: https://www.theverge.com/2020/9/26/21457350/us-tightens-trad...
- Long time push for "just in time" supply chains. A lot of manufacturers stopped keeping a local stock of chips they needed for the next 6 months of manufacturing to save on storage costs. This is fine as long as there are no hiccups in any earlier part of the supply chain (this transition has been happening over the last 15-20 years).
- Crypto-coin mining and the sudden extreme demand of graphics cards. This has been going on for a long time. A lot of low-nanometer demand goes to a large number of graphic cards and ASICs for mining crypto-currency. This led to the graphics card bottleneck that existed for the last 3 or so generations of graphics cards.
- pre-COVID there were several (I want to say Taiwanese) fab plants that were destroyed due to Typhoons. This led to reduced production capacity.
- There was contamination of shipments of silicon wafers which disrupted production in several fabs. This was a pretty short delay more than anything but it was a contributing factor.
- At least one US based Fab was closed. I believe some other international fabs also closed down either temporarily due to COVID or permanently for other reasons. Some fabs were acquired by major companies and likely switched their production pushing more pressure on other fabs.
- Global politics. There was a lot of aggressive changes to global policy during this time frame that forced a redistribution of where certain chips were being manufactured adding more work for all fabs (retooling, reworking designs, getting a design working in a new fab).
- The canceling of car chips actually relieved the pressure on the fabs as they were able to take other fab orders. I don't think this slowed down fabrication in general, but when the car manufacturers realized they actually did need that capacity and more, the capacity had already been sold to other customers. This is entirely on the car manufacturers and is only kind of related to the overall chip shortage.
- Global distribution issues. This isn't just in the final stage of consumer products that has been affected but also raw supplies affecting the rate some chips can be manufactured.
- Increased demand overall. Consumer consumption of chips has increased pretty dramatically over the last decade pretty consistently as everything wants to be connected to the internet now from your toaster, to your butt plug.
- Complexity and difficulty in building up a new fab. These are incredibly specialized facilities costing in the 9 figures to setup the facility. The people that work in these facilities are highly specialized not just in the profession but to the intricacies of that specific facility and their pipeline. Training up these extremely skilled labor tasks can't be done quickly.
iirc this was the root of it. i think the whole chip shortage began in the car industry.
It's important to understand that many manufacturing industries operate on a "JIT (just-in-time) manufacturing" model[0], where goods used in a manufacturing process are only ordered and received as needed, minimizing inventory and storage costs. (e.g., instead of having a warehouse full of screws sitting around waiting to go into products, you order X screws from another manufacturer every month to fulfill Y number of effective orders) This means that many industries (especially the automotive industry) operate on a constant stream of supplied products, in many interdependent chains.
There are two downsides to this approach:
1. The JIT model has to be at least partially predictive. You can't necessarily order components right as you receive orders, because it takes time to produce those components (remember, no one has warehouses full of those components ready to ship, because it's often JIT all the way down) and you don't want to keep customers waiting as components get shipped to you. Instead, you need to at least somewhat predict how many orders you expect to fulfill in order to balance between keeping customers waiting ("shortage") and having excess stock laying around which might never sell (waste)
2. The other main downside is that JIT production is highly interdependent on other industries and can be fragile. If you expect to be able to order X screws this month from your supplier, but some external event causes them to only be able to supply you with Y screws (Y << X), you're shit out of luck. You literally cannot produce your product because the underlying components simply do not exist, which leads to a shortage of your product
Both of these downsides come to a head in the presence of some global event that causes uncertainty and inefficiency. If a low-level JIT process depended upon by many industries suffers from an inefficiency (e.g. workers can't come in because they're sick), many higher-level processes start to slow down (e.g., no one has screws to build their products with). This effect is multiplicative across industries, since many manufacturers specialize in specific products and downtime can affect many "downstream" clients.
Along with this, such global events can dramatically change customer demands, and when you've only predicted needing to produce X products but you now have Y demand (Y >> X), customers are out of luck because the products literally do not exist to be sold (shortage).
Considering that computer chips are now present in almost all major consumer products these days, it doesn't take much uncertainty and inefficiency at the "base" for a domino effect to significantly slow down a lot of industries.
But it has been two years, why isn't the backlog from the initial shock diminishing. I understand that supply is not elastic but two years should have been enough for the producers to ramp up the production.
Do they think that this is a temporary spike and building capacity would be unprofitable?
Ayup.
A lot of the previous decades of chip manufacturing is all about how superior it is to be a "fabless" company. You don't have those nasty capital expenditures and your upside is basically unlimited--while owning a fab means you have to employ a ton of people and your profit margin is effectively capped.
The fab folks know that as soon as this shock is over, owning a fab goes back to being crap. So, you make hay while the sun shines, and you don't even think about doing capital outlays.
Even if they could find the equipment and people (not at all an easy thing), there is ZERO incentive for the fabs to expand. To first order, it's actually more profitable for them to maintain this shortage. Nobody is going to pass up a sale just to keep a shortage going, however.
Eventually, things will equilibrate. However, I suspect that there's going to be a lot less choice in semiconductors for quite a while afterward.
The only short-term thing that I'm interested in tracking is how many companies were hoarding and are going to panic now that inventory tax is coming due. That's going to move some commodity microcontrollers back into the system from the hoarders. It will be interesting to see how much comes back into the system in the next quarter or two.
Along with what Kliment said about not investing in building capacity, I don't think this specific statement is necessarily true. Many of the original factors that caused these setbacks in the first place are still ongoing: everyone is still trying to catch up, and demand is still outstripping supply almost everywhere, for many, many products; worker mobility is still extremely limited (across countries and regions) because of the ongoing pandemic, so it's not trivial to ramp up.
Short of investing in that capacity and expanding into new regions, I'm sure it hasn't been easy to actually ramp up production again, and changes in customer demand and patterns are still shaking out. (And even for those companies which have been investing into ramping production, two years can be the low end to start seeing returns on investments: plants take time to build, resources need to be allocated and transported, new employees may need to be trained, etc.)
If it’s due to inflation, why did chip prices skyrocket a few orders of magnitude more than inflation?
Most shortage todays is on 200mm.
Why? Trump's sanctions on SMIC brought down like half of world's 200mm capacity.
> Can automakers not use a 7nm fab?
No, process, and cell libraries are incompatible. Chips will have to be redesigned.
Only missing piece domestically were the excimer lasers, but they've had that solved (probably through industrial espionage) for three or so years.