by LAC-Tech · 4y ago · 0 comments
It was a success, but it had nothing to do with me being an incredibly inspirational leader. Or being a brilliant developer - I don't think I actually contributed any code. It honestly wasn't much to do with me at all. I basically just set the stage for them to work effectively:
- I booted out all the non-coding people from our standup. The CIO in particular would waffle on, and it was draining everyones will to work (and possibly live).
- I ruthlessly pared down requirements. We had some written specs, and whenever there was a question about which way we should go I chose the one that either didn't involve us doing anything, or was easiest.
- I handled dealing with the stakeholders myself, and reported back to them the relevant info.
The end result was that they were the first dev team to deliver something on time in the history of that company. No one had to work any over time (demo was Friday mid-day, so I got clearance for them to leave early).
So yeah, the best project I ever lead, I barely 'lead'. I was a supporting player. I played interference. I made sure everyone left them the hell alone, that they had the information they needed, and told them that if it fucked up it was all my fault so relax (always blame the contractor).
And and they pretty much did it all by themselves. Turns out developers can develop if you trust them and get out of their way.
Bravo for that. Getting decisions made is one of the biggest hindrances to moving forward.
I'll say one mistake is to have a tech lead that spends most of their time coding. I don't know how you can do everything else effectively if the company still relies on you to deliver code.
The org also needs to be set up to do this though. I’d love to boot some people out of our meetings and prevent them from waffling on.
In my opinion, yours is the only sane way to lead. With command and control, all you would be doing is creating the illusion of control, providing no actual added value. If your leadership style is adversarial, you're stimulating your employees to see you as a liability.
Antoine de Saint-Exupéry said, “If you want to build a ship, don't drum up people to collect wood and don't assign them tasks and work, but rather teach them to long for the endless immensity of the sea“
I don’t think there’s any real evidence that “command and control” is actually safer - the world is full of failed software projects - but I agree that it’s perceived to be safer, and the rest follows on from there I guess.
On the one hand, it's about solving problems so your team isn't even aware of them (typically, politics and spec stuff).
But on the other hand, it's about listening to your team and working on problems they tell you are problems (e.g. non-coders in stand-ups).
It’s not about asking “is it done yet?”. It’s about asking “how can I help you do this?”
Your post literally describes leading. All that stuff is exactly what good managers do. You manage "up" so your team can get work done.
This, I'm starting to think, is one of the most important parts of the job. When people have their heads down in technicalities, every requirement becomes a challenge they gladly accept.
But in practise, you have to match the workload to the workers. That's the only way to ever do things on time.
(Though I am useful when I reject requirements, I do try to teach my team to stop every now and then and consider the actual value of requirements for themselves. I don't want them to depend on me for workload adjustments.)
Are you sure about that?
In my leadership experience, in the long run this is a recipe for disaster. If every team does this, in the end you get silos and a toxic culture, where it is really hard to steer architecture and product changes. At meetings with team leads all will seem fine, but then there will be some silent, elegant and even somewhat unintentional boycotting and delays, eventually grinding the organization to a halt. After years this leads to major changes in the management chain and then rinse and repeat :)