by cmuell89 · 4y ago · 0 comments
However, Charge Robotics has a problem that is generally free of much of the above hindrances and is employing a modular approach. Modular construction can lend itself very well to automation. See the modular housing boom that employs automation quite heavily.
One of the more complex construction portions of the build is handled by a portable factory:
"First, a portable robotic factory placed on-site assembles sections of racking hardware and solar modules. This factory fits inside a shipping container. Robotic arms pick up solar modules from a stack and fasten them to a long metal tube (the "torque tube")."
This process could also employ human labor as well. The rest of the build process requires a more simple transfer of these pre-built components with a final assembly:
"Second, autonomous delivery vehicles distribute these assembled sections into the field and fasten them in place onto target destination piles."
The locations of operation are large open fields with minimal occlusion (which often makes robots in many construction settings infeasible) and reuses prior equipment (bankability and minimizes setup/tear down costs).
I don't think this is an easy problem as there are significant technical engineering requirements, but if each modular process can be proven effective, then the external factors that prohibit automation adoption in construction outlined above are fairly minimal.