Understanding Time Dimension of the Iron Triangle
The iron triangle or the project industry and project management is the well known connection between Scope, Time and Budget. The famous iron triangle is The three sides are connected to indicate that if you pull (as in load one side of the problem) the other two will feel the stress of that load. So if you increase the scope, the cost will go up and the schedule will get impacted, If you shrink the schedule, the scope has to give or the cost has to increase. if you squeeze the cost the schedule has to be impacted and/or the scope as well.
Vivek