by zabzonk · 4y ago · 0 comments
> Its laid it's in tension by hydraulically stretching it before cutting to length and welding to the previous length. Sufficient tension is applied to achieve a 'Stress Free Temperature' (SFT) of 27 degrees C (i.e to relieve the tension by expansion the rail would need to be heated by the sun to 27C, whereupon it would neither be in tension or compression).
Apparently they lay it "hot" and so normally when it is cooler than that it is actually "pulling" on itself trying to shrink, and when it gets hotter than that it begins to compress.
If it can't compress it buckles, if it can't shrink then the tension grows, but steel has incredible tensile strength.
It is worth pointing out that jointed rather than welded track WILL NOT solve the buckling problem.
In fact, jointed track is at a MUCH HIGHER risk of buckling in heat than welded rails as gaps close and there are 160+ joints PER MILE to maintain...
...plus jointed track is generally lighter, weaker and thus at higher risk of buckling (most GB buckles are in jointed, not welded track).
Bolted joints also have a nasty habit of disintegrating under traffic and derailing trains (hence use of welded track to start with)
Nevertheless, when I was young I traveled frequently by train. During some decades, I have never seen problems caused to the train traffic by too high temperatures, on traditional jointed rails.
On the other hand, in the last few years, whenever I happened to travel by train through Germany on continuously-welded rails and the weather was hot, there were train delays due to the rails.
So it seems that there is some disconnection between theory and practice. Maybe the new continuously-welded rails have been designed based on ancient recorded temperature ranges that are no longer valid due to climate changes, as already suggested in the parent article, but in any case something is wrong with the design of modern rails.
In the parent article it is mentioned that changing the stress-free temperature to a higher value is not good enough, because the strength of the rails could be exceeded during cold winters. So it is likely that the rails would have to also be thicker, increasing their cost.
Why? Don't the gaps give the track some amount of play which would lower the pressure and therefore the risk of buckling?
The rails have not a real freedom to slide, they have two different forms of resistance, the one provided by the ties and the one provided by the junction, there is only a given temperature range where they can slide.
The rail goes into a cycle, you need some 3-4 C° to win the resistance of the joint (in this part the rail is compressed by some 6000 kg of resistance) and some 6-7 degrees more to win the resistance of the ties (some 10-12000 kg more of compression), then it becomes "free sliding" until the gap in the joint closes, this needs 12-13 C° more and the rail is again compressed by the ends.
When the temperatures lowers, the same cycle is reversed, the rail first contracts until the gap starts to appear and widens, then you have again a range where it is free sliding, then the two resistances come into play again, when the temperature lowers further the excursion is limited by the joints (usually they allow 14 mm travel) and the rail is subject to traction (as opposed to compression).
The only point that never moves is the tie at the center of the rail length, you have to imagine a spring that you try to expand by pulling the two sides, it will return to its original shape, all forces are relative to the center, so there is not any reason why the rail should not come back to its original position.
Check this:
https://pwayblog.com/2017/03/06/jointed-track-response-to-ra...
In practice - strangely enough - rails behave very similar to the theory.
As mentioned at this link, the continuously-welded rails are made to be stress free at a specified temperature, for example 27 degrees Celsius in UK.
At lower temperatures the rails contract, which does not have bad consequences unless the temperature becomes so low that the rails will crack, because their strength has been exceeded by the contraction stress. At very low temperatures the trains may need to reduce their speed, so that the rails will not crack due to the additional stresses caused by a passing train.
At higher temperatures, the rails dilate, and when the temperature is high enough they will buckle. Due to that, the trains may need to reduce the speed, or even stop and wait for the rails to become colder.
At least a part of the rails from Germany have also been updated with continuously-welded rails.
In one of my trips, it was a hot summer day and because of the rail buckling all the trains had huge delays. Even if I should have arrived at the Frankfurt airport about 3 hours before my flight, due to the train delays caused by the hot weather, I have arrived so late that I have lost the flight.
It also explains some of the maintenance procedures.
The parent link says “Railroads deal with thermal expansion by heating the rail prior to installation”.
reddit/etmidust wrote “I was a manager of track maintenance for a US railroad for a while. When they lay new rail, part of the process is a ‘heater car’[1]. This machine rides the rail and is basically a multi headed blow torch to heat the new rail to the ‘rail neutral temperature’(SFT). At this point the rail is not yet spiked down to the ties so that it has a chance to grow and expand. After the heater car some other rail cars called spikers follow to spike the new rail down. That is how they ‘pre-stress’ the rail. I am skipping some steps, but that is the gist of it.”
https://broadwayextensionblog.blogspot.com/2017/03/stressing...