SPC is tricky case in that regard. Because it, kind of, makes the trend and long term development of metric the target.
Edit: You had me thinking. Settng a target, or rather target tolerances, for a metric can be necessary if that metric is directly measuring the output of one process that is used by another process. E.g. forecast accuracy, if downstream ops are expected to cope with, say, a deviation of 20 %, that tolerance kind of becomes the goal for the forecast accuracy. This is not some arbritary goal so.
For me, setting limits on certain metrics is something different from a target. It is a thin line between those.
I think a forecasting target of 20% shouldnt be necessary unless you want to be around 19% deviation. Which might be the case if trying to reach 0% has diminishing returns and isnt actually cost effective. In other words, targets make sense when you are literally targeting a sweet-spot.
If 0% deviation is desired, then the directive is still the same - try to be as accurate as possible. If "as accurate as possible" is consistently falling below 20% (which is the importance of measuring and data) then you need to address that. Maybe forecasting is broken or infeasible.
On ops side, they might not be expected to handle deviations over 20%, but the directive is probably the same either way "do the best you can to manage the deviation".
>For me, setting limits on certain metrics is something different from a target. It is a thin line between those.
I agree with this in general. It can be tricky to communicate "here is a boundary that absolutely cannot be crossed, but keep in mind you should be nowhere near that boundary anyway" without it impacting peoples personal optimization strategies. You really have to weigh the consequences of what actually happens when that limit is reached, and if it's worth a possible depression of performance from the team.
It all comes down to leadership, doesn't it?