by dignick · 4y ago · 0 comments
1. Cost per MW compared to renewables (~$150 vs ~$40 and falling). Here in the UK the government is promising to subsidise this to make it viable.
2. Construction time - average is 10 years, we don’t have that long to wait.
3. Decommissioning is expensive and a long way in the future. Is that cost built into the cost per MW? How can we be sure the money will be protected, and will be enough to cover it?
4. Spent fuel. The project you mentioned isn’t complete yet, but even then it’s a huge liability to leave for future generations to manage indefinitely.
Meanwhile, renewables don’t have these problems and are available immediately. We should be building huge factories to produce wind and solar en masse.
Source for the figures: https://www.reuters.com/article/us-energy-nuclearpower-idUSK...
You can't directly compare cost per generating capacity, because nuclear, gas, coal etc. are available according to schedule, while most renewables aren't. Adding storage around renewables to make them schedulable raises costs.
Yeah it's (usually) planned, but it's a decently long time in which you need those gas plants.
Why not just build solar instead and fuel those same gas plants with hydrogen or methane you plucked from the air with your $20-30/MWh unscheduled electricity?
Plus, you can get solar and storage as an off the shelf item today as a retail customer for less per watt than recent reactors in UK/France or even USA. 8kW nameplate solar and 16kWh storage capacity is about $10k which matches 1kW of net from eg UK projects of around 2.5GW net for 26 billion pounds fairly closely.
Yeah if you live far north or have a long cloudy month in winter you'll be relying on that gas plant, but so does the nuclear reactor. Plus you'll be dumping 10-20kWh/day into the grid on the good days. Provides a decent incentive to figure out how to store it, and even if you're only getting 5c/kWh for it, it'll pay for replacement in 7-10 years or so when prices have dropped another 50-80% without sacrificing your kilowatt.
Nuclear has a very small footprint on a crowded island.
Plus we have Rolls Royce SMRs who have been building nuclear reactors for a while.
You could add as much net capacity as the UK has in nuclear in just above the space used for parking cars.
You could add twice to four times that again just on detached house rooftops.
Even as a commercial installation with no other purpose, a 4km square is hardly an insurmountable barrier.
The initial capital budget of sizewell and hinkley alone could provide 30-80GW of nameplate solar or a rooftop system on every building in the country.
If there are trillions in the pot, by all means go ham with fission, but when low carbon sources are fighting for the scraps left over after subsidizing fossil fuels we have to do the thing that is effective first.
Some industries literally can't turn off production without damaging plant, but if some can then where energy cost is ~30% of fossil/nuclear than it might make sense to over-provision industrial capacity and only run it when the sun is shining.
Renewables even have the advantage that they produce electricity mostly when it’s needed. Photovoltaics during the day and wind during winter when heating is most needed.
None of those problems OP described have anything to do with that overblown statement. Investment may have been removed for FUTURE projects but not for current operation which is highly subsidised by the French taxpayer guaranteeing the fixed price the Government decides on.
Also Germany reactivated those dirty plants also to help France out. The whole European grid is helping the nuclear nation out and will continue to do so until France diversifies its power generation infrastructure.
I'm in favour of renewables, but done in the way that actually makes most economic and environmental sense. In the Uk we threw money at rich people with £15k to install 4kwh solar rigs on their houses. That money would have been much better spent subsidising large industrial installations.
The current cost of green hydrogen is somewhere between $2 -> $12. That is the production cost. The market price for green hydrogen sits around $4-$20, since there are multiple industries that demands hydrogen.
For 110 to break even the hydrogen need to cost $3.5/kg, and in order to really displace natural gas, it is estimated that it need to reach $1/kg.
Now I noticed that those $150/MW is not a range, so I took a look. Projected nuclear LCOE costs for plants built 2020-2025 places nuclear around $27/MW to $147/MW depending on financing and country (source: OECD Nuclear Energy Agency’s (NEA's) calculation). Russia has the lowest cost and Slovakia or Japan (depending on financing method) has the highest.
So in summery, it can definitively cost more than $110/MW to produce viable green storage solution, especially in northern countries where low duration lithium batteries is not a working solution for long winter periods with low wind production and the sun is only up for a max few hours per day. Nuclear can also be much cheaper depending on where it is built and how it is financed.
In practice, they have done something like 20% within an hour. It was early 2019, there was such a crazy wind that they had to reduce nuclear production also (after already reducing coal, gas etc. to the min).
I think what they really can do is somewhere in between.
sources, it was on l’energeek, but in French.
What do you base this on?
Renewables are too unreliable to act as baseline generation for a country.
In the UK last year for example we had very little wind, so we had to ramp up our gas power output to make up for our shortages in renewables. We burned through much of our gas reserves before the Ukraine war started, because of Renewable power unreliability.
Fission is the replacement for that baseline role that hydrocarbons currently fill, not the unpredictable-but-clean role that renewables fill.
The ideal future has both, with renewables producing as much power as possible and fission running on low capacity and ready to ramp up when renewables fall short.
Moreover nuclear is not the beacon of reliability, Frances nuclear plants were running to only 60% capacity due to maintanance and weather (when it gets hot nuclear plants have to shut down or reduce output significantly). Guess who was picking up the shortfall... German renewables and gas.
Finally, cost is absolutely the main measure: if the cost of nuclear is 3x wind/solar (and the cost of solar is falling exponentially) and you want to replace fossil fuels as quickly as possible the obvious way is to build renewables, you can overbuild 300% at the same cost. At that point you're close to being able to run your grid if you are sufficiently geographically distributed (even without batteries). Moreover in 10 years when your nuclear plant is finished building the price differential is like >5x due to the cost decreases.
One thing I don't understand here is the problem with overproduction. If we actually have excess electricity (as in not needed as electricity later) can't we dynamically use that for active carbon capturing? The efficiency of that process isn't even that important then as the main goal is to remove carbon from the atmosphere with carbon free energy.
Having carbon free overproduction sounds like a good thing to me. It's the occasional underproduction that's hard to handle.
There is no such thing as overproduction, there are only manufacturing bottlenecks in batteries, electrolyzers, and reverse osmosis water plants.
1. https://caseyhandmer.wordpress.com/2022/07/22/were-going-to-...
Wind is always blowing somewhere. Sun is always out somewhere. Storage is transportable.
The extra power when 3x > mean(x) is just incentive for developing flexible loads and arbitrage.
I'd just like to point out that the US Navy has an excellent track record running nuclear reactors that ramp up to full and down to zero rapidly, in submarines.
The US Navy does not have quite the same financial constraints as commercial land-based power, but constraints still exist.
I fully agree that solar PV and wind, especially PV, are much more atttractive to investors because you can be earning cashflow from your first MW of capacity while you're installing the second (which takes weeks (or days!) instead of years), and you can iterate and scale this all the way to 10 TW or more of capacity, as the demand requires.
It's important to use the real deal-breaking flaws when pointing these things out. The relevant figure is availability because capacity also includes energy that could be produced but was not due to having nowhere to put it.
Availability is 70-80% in France and UK and 80-90% in the US.
But due to the long timeline of refuelling cycles you still need a full baseload backup. So nuclear needs long term storage or other uncorrelated backup more than renewables if anything.
The upside is it's easy to have two uncorrelated nuclear plants, so overprovisioning by 30% is sufficient.
That makes something that is already more expensive than solar with the same overprovisioned net capacity factor, and a green hydrogen plant with capacity sufficient to cover, and full gas backup infrastructure even more expensive though. Probably not enough to cover the costs of hydrogen storage yet or someone would be doing it (ignoring massive nuclear subsidies), but prices of batteries, solar panels, and electrolyzers are dropping rapidly. Hydrogen storage or green methane production only needs to become marginally cheaper to make it start happening even sans subsidies.
This is a fallacy in two ways:
1. Scaling up nuclear projects will decrease construction time and cost. Efficiencies are found by with scale.
2. The opportunity cost of not starting nuclear projects now will surely be worse than attempting 100% renewables. The point is that we can invest in both.
> This is a fallacy in two ways:
> 1. Scaling up nuclear projects will decrease construction time and cost. Efficiencies are found by with scale.
More than half of a nuclear plant is essentially the same as any large scale power plant (goal, gas...). The opportunity for reducing cost through economies of scales is low. Economies of scales work for things build in factories, much less so for construction projects. That is true in general, not just for power plants.
> 2. The opportunity cost of not starting nuclear projects now will surely be worse than attempting 100% renewables. The point is that we can invest in both.
Why? It's the other way around, the actual cost of building nuclear instead of much cheaper and faster renewables causes an opportunity cost, because we can replace fossil fuels much faster building up renewables.
That's under the assumption the available money, hardware and labor of ramping up solar and building nuclear plants directly competes with each other. That's a pretty strong assumption and I highly doubt there is a strong enough link between any of those three for your argument to have significant impact.
E.g. We should be able to drive rapid solar expansion with government money and subsidies while incentivcing big energy carriers to build nuclear plants.
Presumably that's the cheap half of the nuclear plant, because coal/gas plants are pretty cheap to build.
Combined cycle gas plants are cheap because 2/3rds of the power output is from the combustion turbine, which needs no heat exchangers. The steam bottoming part needs two: the boiler running off the exhaust from the combustion turbine, and the condenser to transfer heat to the environment.
Do you count in all the subsidies the renewables get from governments, including the production of the solar panels/wind mills, land ownership, utilities and all kinds of tax cuts and preferential treatment? In my country billionaires own massive solar farms and make tons of money at the expense of everyone else.
Can you tell where you are from?
I'm rooting for billionaires to own more and more solar farms please. Let them buy more newspapers and "think-tanks"
Because I'd really like to live on that world where oil has no subsidies, occupies no land and it gets magically transported throught the country
You've been saying that for last 20 years. It's pathetic by this point. Best time to start doing things (anything) was 30 years ago. Second best time is now
Doesn't make it cheaper, only hides the cost. Subsidies are many times perversive. Prices are communicating something. When Gov messes with it, people and organizations tend to make bad decisions for themselves, society, environment or everything.