Most of a nuke plants' cost is in construction, but that is not because its operating cost is low. It is just insanely expensive to build. Then, its operating cost is high. Each moment it is not producing at 100% rated power, its per-kWh cost increases accordingly. Its operating cost does not decrease proportionally when it operates at below rated maximum power, so the operating cost per kWh is multiplied by the difference. And, operating at below rated capacity, the construction cost is amortized over fewer kWh, again making the per kWh cost greater.
You already well understood all of the above, but evidently hope readers will not.
Doesn't the modularity (multiple 60MW reactors in a single installation) in the NuScale design obviate the "Xenon poisoning" issue, since shutting down one or more reactors doesn't mean halting power generation as it would with a single, larger reactor?
Presumably the reactors can be shut down and powered up independently so addressing the "Xenon poisoning" issue should be just a matter shutting down, then powering up some fraction of the reactors, scheduled to maintain the base load required, no?