by akiselev · 4y ago · 0 comments
The California Aqueduct was a megaproject that started over 70 years ago and the aforementioned Edmonston Pumping Station was turned on in 1973. At this point, the biggest challenge would be the right of way and litigation since the engineering has long been a solved problem. Those in California can go see the aqueduct exit the Sierra Nevada mountains at the edge of Bakersfield [2] and hiking trails around Lake Isabella intersect with open parts of the aqueduct where you can see all the water rushing by (don't fall in!). Imagine that, but like five or six times bigger.
[1] https://en.wikipedia.org/wiki/California_Aqueduct
[2] https://a.scpr.org/69978_86cbed2aa8b2e426383678de0f659072_or...
I totally agree. I live in SoCal and there are some infrastructure projects that took forever (ie creating the I105 and finish connecting the I210), or will probably never get completed (ie. finish connecting the I710 and California High Speed Rail) all because of right of way issues and lots of law suits.
Granted, this was during the great financial crisis so they may be doing better now.