by robomartin · 4y ago · 0 comments
In one of my projects the plan-checker got into a fight with the civil engineering firm I hired over the method used to calculate static and wind loads on a structure. I had done all of this work myself --including running FEA simulations. However, because I am not a Civil Engineer, I had to hire a firm to, effectively, duplicate my work. Physics is physics, right? That's OK. No problem.
The issue was that the plan-checker did not like the method the civil engineering firm used to do the math. He called it the "European" method. This was a US civil engineering firm bonded for operation on all 50 states, BTW.
What was absolutely perplexing to witness and endure was that the numbers were correct. My numbers, the civil engineering company's numbers and the non-European method (whatever that means) numbers were the same (within the margin of error).
The plan checker (a Civil Engineer) knew this. The results were the same. He just wanted it done his way. That cost me weeks and thousands of dollars.
The problem with these people is that they have an incredible amount of power. One cannot challenge this power without being willing to delay a project for months or years and incur thousand, tens of thousands, hundreds of thousands of dollars (or more) in costs. It is as close as one can get to dealing with a totalitarian regime within a free society.
The same permit office forced me to install 64000 lbs. of concrete as the footings for my ground-mounted 13 kW solar array. An architect friend of mine told me those footings can support a four-story building. There was no way to have that decision reversed. I tried. It cost me a couple of months and tens of thousands of dollars.
Building safety and zoning regulations are most-definitely important. However, there needs to be a mechanism in place to ensure there's fairness in the system all-around. I don't want unsafe buildings anywhere around me. I also want construction projects to be able to execute on reasonable timelines and at the lowest possible cost; one that is not inflated by bureaucracy and, yes, incompetence.
As a resident of San Francisco I complete sympathize and mostly agree with your position.
That said I don't think you can comprehend how broke and cheap the landlords are here in San Francisco. 50+ year old buildings that are all crumbling. They pay absolute nincompoops to keep everything standing and not more. Literal illiterates.
The maximum action I've seen taken against these people is like, a $900 permit fine. Maybe once out of every 100 unpermitted repairs / modifications / works.
> bureaucracy... He just wanted it done his way.
The majorities in LA and SF communities where development is economical are not aligned culturally with you and me.
I don't totally understand why "they" are excused from following the rules. I don't know why Prop 13 ensures they pay 1/20th the property taxes you do and I eventually will (I am a renter).
I can't comprehend why we tolerate how people in these communities use old people and children to maximize their compulsory buyout payments when someone else moves into the home a person with whom they share a cultural affinity is selling.
Somehow these same people have fucked up the compact that people in the Mission could send their kids to Presidio schools. A 10 year law that would have made it reasonable for me to permanently live here, now reversed.
They're just so god damned stupid. Eventually people will crack and figure out whom to point the finger at.
And yet you're blaming LA County for this. Civil engineering work is required to be done by engineers. There are rules and procedures that must be followed. That's the law pretty much everywhere you have nearby neighbors; if you don't like those laws go out to the boonies and you can build whatever you want, however you want. But if you're going to try to build something that might affect other people you need to follow the rules.
An architect friend of mine told me those footings can support a four-story building.
Your architect friend would be wrong on that...For point of comparison, the average concrete foundation is 200 lb/square foot, or about 480,000 for a 1-story 2,400 square foot house (see https://archive.seattletimes.com/archive/?date=20041219&slug... estimating the foundation for the garage of a single-level home at approximately 30,000 lb). That's why engineers are required to review the work. Because self-styled architects are constantly messing up on the math and physics.
EDIT: numbers and math come from the linked article.
The architect is right, you are wrong. There is simply no reason to have this much concrete for a residential solar addition.
For your information and to head off argument: I am a licensed civil engineer in California. The rules and procedures for little shit like a solar array foundation can be followed by almost anyone who can do simple arithmetic by using the CBC, you do not need a license to do it correctly. You need the licensed engineer’s stamp so that there is someone (insurance) to sue if things go wrong.
Thanks for posting this (and the rest of your analysis). I'll repeat what my wife says all the time to her patients: "Your Google search is not equivalent to my medical degree".
This kind of thing comes-up all the time online. People think they understand something and don't seem to bother to make sure they actually do.
I am not a Civil Engineer. I am an EE, with enough of a physics background and multidisciplinary experience to work my way through a project like this without any issues. I have done a lot of construction work. I did all of the design work because (a) I enjoy this and (b) I could save some money this way. I knew full well that a licensed Civil Engineer would have to come into the fold eventually.
The more work I did in order to ensure all was structurally sound, to code, etc., the less design iterations we would require while paying a Civil Engineer. As it turned out, I got most of it right. We had to make some adjustments based on the wind loading the county wanted (my house would be shredded at those speed, but my solar structure will stay put).
Here are a few renderings from Solidworks:
https://i.imgur.com/xhbpxBe.png
https://i.imgur.com/gO91PaO.png
https://i.imgur.com/JUao20F.png
The civil engineering firm was able to use the ACAD drawings I produced from Solidworks, that saved me a bunch of money.
As a point of interest, I installed fans under each section to help cool the panels and improve output. I don't have data on how well this works yet (it's been four years, I should have it!).
It was quite an experience to start with a pile of lumber on the driveway to personally cutting and milling every single component and then assembling the thing. The best part, my kids learned a ton in the process.
As an aside and based on your other post, a slab might not have been the most economical solution for your particular problem. You probably could have just installed some small diameter piles under each solar panel post. I'm surprised your engineer didn't recommend it as this would have much more easily addressed the wind loading issue. Value engineering like this is the real benefit of engaging a knowledgeable/experienced engineer.
Cool Solidworks model. Easy 3D modeling has very much changed the game for small scale projects by allowing people to build a project on their computer and figure out all the little details that you'd normally screw up without an engineer. Having a working 3D model means that your design is probably at a higher level than most. It's cool to take something from an idea to a concept to physical reality.
Did you even read my post? Here. Quoting:
"However, because I am not a Civil Engineer, I had to hire a firm to, effectively, duplicate my work. Physics is physics, right? That's OK. No problem."
Let me repeat that last part:
"That's OK. No problem."
> Your architect friend would be wrong on that...For point of comparison, the average concrete foundation is 200 lb/square foot, or about 480,000 for a 1-story 2,400 square foot house
You are grotesquely misinterpreting the link you provided. That's the weight per square foot of an entire house, including footings, slabs, tile roof, etc.
> Because self-styled architects are constantly messing up on the math and physics.
Very funny, considering the above.
I mean, just a little bit of critical thinking and math shows how crazy the 480,000 lb number is.
For easy math, a 2,500 sqf house is 50 x 50 feet. Assuming a density of 133 lbs/sqf for concrete:
That slab, at 4 inches thick, comes in at 110,833 lbs.
Now assume a full footing all the way around the slab. That means each footing is 50 feet x 1 foot wide and 28 inches below the slab. I'll ignore the intersection of the footings just to keep the math simple.
Each footing weighs 15,517 lbs. That's a total of 62,067 lbs for footings and 172,900 lbs so far for the house.
Depending on code and type of construction additional footings might be required on the interior of the slab-on-grade construction. I'll just round the 127,000 lbs to 200,000 lbs, again, for rough numbers.
The 480,000 lbs number you came-up with is absolutely ridiculous.
Like my wife (a doctor) likes to say: "Your Google search isn't equivalent to my medical degree."
Regarding what my friend said about my project. First of all, it was a figure of speech, not a precise calculation. "Dude, you could build <insert whatever makes you comfortable here> on that much concrete!". Yes, it was an absolutely ridiculous amount of concrete. It didn't stop at 64,000 lbs. There's a full-on 55 x 45 foot slab, 6 inches thick, with lots of rebar and other details. If we are going to go on raw concrete weight --which isn't the right metric-- it's about 230,000 lbs.
EDIT: For Architects/Civil Engineers who might be reading this. We live in an area that has been classified as a high fire risk zone (wrongly, in my opinion, but there's nothing I can do about it). This gives LA County license to go absolutely insane with some of their requirements. They turned what should have been a relatively simple ground-mount solar project into an absolute nightmare.