by memetomancer · 4y ago · 0 comments
This isn't just some arbitrary guesswork on a blog, it's practical planning by the major suppliers. Check it out.
Node name just barely correlates with minimum feature size (how thin can a line be drawn). That's starting to break down (hence intel 7 and 2N and so on) but that's not the limit I'm speaking of. The "2nm" nodes wind up with functional units about 30nm from center to center.
Compare to the 22nm node which was almost precisely 44nm center to center for a dram cell. In density terms there's maybe a factor of ~20 between 22nm and 2nm processes, so functionally the 2nm node can make things which are about a fifth the linear dimension.
Gate pitch has a fairly hard limit based on voltage and electron wavelength.
You're never going to put another transistor within about 2nm of a first one and have them both work. Hence the roughly order of magnitude in linear dimension past current.
I will point out that you instantly went into condescending mode after complaining about my imagined condescension. I assure you, I'm well aware of what a process node implies about measurement of larger features. I'm also aware of the promising approaches coming down the pike.
I'm _also_ aware of the decades-old Internet tradition of people posting about the hard physical limits and immediate death of Moore's law, even as the limits are overcome year after year.
I am glad that you have a handle on the problems we face here, but please try to keep in mind that these challenges are a beginning, not an end.
Those predictions initially pointed directly to the 2020-2030 range, then the goal posts were moved to keep moores law alive (it's not a doubling every 18 months, it's 2 years). They point to 2040 now. If you stick to the 18 months rule under which the predictions based on the hard physical limits were made in 2000-2008 then it has already come true. Putting ever smaller numbers in the names of process nodes where the density of functional units is barely increasing does not change this.
Nehalim was noted for it's relatively large die area and low transistor count at about 2.7MTr/mm^2.
core2 on 45nm was about 3.8
Zen 4 is about 93.
93/2.7 is a factor of 36, 93/3.8 is 24. 2^7 is 128, 2^9 is 512.
Mobile processors are slightly better from a raw numbers POV, but already have a large portion of their area dedicated to tiled functional units like sram and gpu cores. Switching from a complex bespoke design to tiling only helps once. Even an m1 at 133MTr/mm^2 vs nehalim is only a factor of 48. These numbers are not even commensurable, because a much larger fraction of the transistors in the M1 do not do anything than in a core2
Prices per unit of die area are about stable although chiplets are needed (again) to maintain yield. This will go up with EUV and more exotic materials used to increase the dialectric constant.
Clocks are stable.
Performance per watt will continue to increase for a while after using architectural changes similar to some of those mentioned in TFA, but there is no getting around the second law with a classical computer.