by logifail · 4y ago · 0 comments
It's more about nuclear being too expensive. If nuclear's great value and doesn't need the state to underwrite everything from the disaster liability insurance on downwards, great, go knock yourself out; get finance, get approvals, build a plant, go sell your product on the market.
Just don't expect consumers to sign up for a multi-decade deal to guarantee to buy your output at a higher price than any other provider before you'll even pour any concrete.[0][1][2]
[0] https://www.bbc.co.uk/news/uk-england-somerset-61519609 [1] https://www.iisd.org/story/the-united-kingdom-is-to-subsidiz... [2] https://www.ft.com/content/945d8b79-ba82-4ebc-894e-73eec3892...
Storage is a huge one, we don't have effective means of storage besides hydroelectric dams which are geographically limited. Lithium ion batteries still take over $500/KWh to install (the <$200 figures are for the battery cells themselves, omitting the cost of installation, transformers, maintenance, etc.). And they're set to increase as raw materials are strained [1][2]. This is why plans to transition to a majority renewable grid typically assume that hydrogen, or some other form of storage will provide storage at a fraction of the cost of existing storage methods. Nobody has actually built commercial hydrogen storage, though, so this is a big assumption.
There's also the cost of transmission. Energy dense sources like nuclear power can be placed close to electricity demand. But low-density sources by definition need to be spread out and distributed. Decentralized generation is not a good thing, as it requires more transmission infrastructure to support. It's not uncommon for renewable projects to be denied because the infrastructure can't handle the transmission requirements [3].
Nuclear avoids these issues. It's a non-intermittent source with the greatest capacity factor of any generation system. Downtime is usually scheduled. This eliminates the need for storage. It's also energy dense. It can be used in place of existing fossil fuel heat engines, avoided in the need to make large build-outs of transmission infrastructure.
1. https://www.aljazeera.com/economy/2022/7/7/lithiums-insane-c...
2. https://tradingeconomics.com/commodity/lithium
3. https://www.vox.com/videos/22685707/climate-change-clean-ene...
And proponents of solar forget that they have to cover large swaths of land with solar to begin with. Some places don't have the luxury of converting land to solar farms
Likewise, PV cladding on electric cars, even though this is absolutely not the optimal place for PV, can generate 50-80% of the mean demand for that vehicle in most places.
But PV scales up and down, so you can also use it as a roofing material in a car park (one of the reasons cladding cars themselves in PV isn't the best idea), or on otherwise worthless land like the gap between the eastbound and westbound I-80 [0], or on top of reservoirs and rivers where we want to reduce evaporation [1].
Given where the sunlight mostly falls and where people mostly live, the biggest discrepancies are the UK (mostly as bad as the coastal mountains on the strip of Canada between Washington state and Alaska), and China (the people mostly live in the east which is relatively cloudy, the desert where they put some (but not all) of their PV is in the west).
For the small settlements that can't use PV and which it would be uneconomical to connect to a grid, there's wind and geothermal, and the rest may be so few as to not actually matter for environmental purposes if they do keep using diesel or methane. But probably not nuclear, because you can get a lot of transmission cable for the price of a reactor.
[0] I'm not sure how big that gap is, but a few random samples suggest 15 meters width, which means 20% efficient PV there has a nameplate capacity of 14 GW, and even assuming just 10% duty factor that's still more than a nuclear power plant, but the capacity factor is mostly going to be 18% in the area the I-80 goes through.
The entire US interstate network, assuming 15 m direction separation and 20% efficiency, has room for 235 GW nameplate, adjust accordingly for capacity factor.
There's much more length of railway line in the US, though I have no idea what the average width is over its length, and I don't understand the engineering constraints well enough to know how close PV could be placed to the rails (between the sleepers?)
[1] Lake Mead by itself would be enough for 128 GW nameplate, looking at the solar potential in that area it probably has a capacity factor of 22%.
A nuclear plant is pumping out electricity 24x7, but the problem is, no electricity consumer needs that kind of supply, certanly not at the prices nuclear needs to charge. When the wind is blowing and/or the sun is shining, every single electricity consumer would prefer to pick a cheaper, renewable, option.
The only way nuclear can even pretend to make the math work out is by going on and on about "baseload" and hoping that they can lock in buyers over several decades rather than having to actually look the spot price in the face.
There's no "pretending" about base load. The vast majority of electricity demand is base load, and the peaks beyond base load happen when solar stops working.
The upper bound is the cost of a global power grid or a lot of storage, either of which would cost roughly half as much as the current annual spend on just unrefined crude oil.
> We're talking about reinventing our society to revolve around several transient energy sources.
No, that's just your failure of imagination.
> the input cost is so insignificant that even if the cost of uranium increased 5x, it would barely change the cost of energy for consumers.
The the reason for that is also why nuclear is the most expensive major power source right now: all the other things in nuclear power are much more expensive than the fuel.
Every significant solar energy installation in the world was built with massive government subsidies.