83 points · by nabazlbhf1337 · 4y ago · 89 comments
Agile extremists love to dance around the broken record of: “but Agile is what ‘high-performing’ development teams use”.
Is it?
According to who?
What study?
What was the sample size?
How long was the study run?
What caliber of companies were included in the study?
Most importantly, what was the percentage increase in deliverability/speed/efficiency/developer happiness/customer happiness when using agile vs without?
These are questions the agile overlords either don’t know or refuse to provide the answer to.
Even if said studies exist (hint: quality ones don’t), those studies would likely have been conducted by statisticians who have never worked on a development team, thus making their study unqualified right out of the gate.
I don’t know what your definition of high-performance is but my definition would be along the lines of “delivering high-quality software quickly and efficiently”.
Now please explain to me what part about spending half the day in meetings rather than writing code is actually “high-performing”. There is a reason Elon Musk just fired half of Twitter. Sitting around in meetings all day [pretending it’s important](https://www.linkedin.com/pulse/sorry-your-job-doesnt-matter-what-matters-wayne-k-spear/) does not provide value. Clearly Elon is calling the bluff of all of the corporate shills who managed to convince company leaders that these meetings truly are important by firing everyone who sits around all day doing something other than writing code. He clearly put 44 billion dollars where his mouth is and told you that your pointless meetings don’t matter and they don’t need it to build quality software.
My previous company spent 1 hour every Wednesday talking about whatever urgent items needed to be addressed and then we peaced out for the rest of the week unless anything came up (in which case we would reach out to the person ad-hoc in Slack, rather than scheduling un-needed recurring weekly meetings)
My current company spends 4 out of 8 hours every day in meetings. These meetings include:
- Stand up - Sprint planning - Retrospective - Refinement - probably 5 others that I’m forgetting
I’m not an agile extremist so you’ll have to excuse me if I’ve gotten any of the their ridiculous verbiage wrong.
But let’s cut to the chase.
Someone explain to me:
Where within the definition of “high-performance” does taking 2 weeks and 4 meetings with 10 developers on each call just to deliver a simple list-filter feature fit in?
I ask because such a feature would have taken my previous non-agile team not more than 1 meeting and not more than 1 day to complete.
If team A takes 2 weeks and 4 meetings to deliver said feature and team B takes 1 day and 1 meetings to deliver said feature then simply put, team A needs to sit down and shut up as they hold no ground to talk about “high-performance”.
The time-tested adage of “put your money where your mouth is” holds true no matter how many agile verbiages you want to throw at it or how many agile-non-believers you scream obscenities in the face of.
Below is an open challenge to any person or organization:
Have your agile team deliver high-quality software more quickly and efficiently than my non-agile team and I will print out this post and eat it on camera.
Until then: sit down and shut up.
I’m certain that I am part of that problem. My neurotype seeks, even demands novelty. My role requires creative work among a stream of incidents. The not quite platform team thing. I’m finding myself working late and at odd times to get creative work done and it’s not sustainable.
The promise of agile is to fix this. The reality is most people can’t, won’t, or simply don’t say “no, there’s no cutting in line. It goes to triage then the back of its respective line.”
I don’t think Distraction is a good thing per se, but it feels inevitable from where I sit. Agile eschews planning, or embraces not sticking with the plan as state changes. I’ve not really worked in a waterfall environment, but if it’s agile’s antonym then I’m in.
This doesn't have anything to do with agile. You can run "agile" with as little as an hour of meetings a week if you want. Planning, retro, refinement in one weekly, async standup in Slack. You can bring standups in person, have them daily or less frequently, adjust the frequency, change your sprints from 1 to 2 weeks.
Even the heaviest weight version of this I can imagine (daily 30 min standups, 1 hour planning, 30 min retro, weekly sprints) adds up to 4 hours total for the week. So what you're describing is 80% something beyond that.
> taking 2 weeks and 4 meetings with 10 developers on each call just to deliver a simple list-filter feature fit in?
This sounds like you've moved from smaller company to bigger company and are noticing things move slower, though correct me if I'm wrong.
Either way, these are the questions: Why does the feature actually take two weeks to build? Are there more factors beyond the team? Larger scale? More testing / QA needed than pushing out to prod? Just plain worse developers? Bad PR practices that delay the feature? These factors again are nothing to do with "agile".
Another person asked this well, but really you've offered no notes on what your old team did differently that was not "agile". What's the alternative that people are missing?
Pivotal Labs, well known for "doing Agile right," spends the entire Friday doing no work every week.
And the big names in tech also purport to use agile and spend maybe an hour every Friday or Monday doing "agile" type meetings. Which are we talking about here?
If it helps, add to my above post that I'm using "agile" to mean the philosophy of defined sprints with stand ups, planning, and retrospectives to help execute a larger, changing roadmap. There are many many other rules people can choose to add, but my experience across many companies is that this is the shared core in practicality.
When people say agile, 95%+ of the time they don't mean whatever Pivotal Labs is using for a standard. I've practiced "agile development" at F10, big tech, and under 250 person startups, and no one has ever referenced a strict spec definition like that, not even the F10 which basically said "here's some detailed guidelines some use, take what works". So what's the relevance of this strict definition?
It was way more productive than with my second team where we used one hour every two week for the retro. In big company, the time you actually spend on understanding how everything work is never really lost.
I hate to pull a "no true scottsman", but absolutely nothing about that is being agile. The manifesto says nothing about cargo culting various ceremonies, in fact quite the opposite.
It’s a really hard balance to get right and Agile easily ends up turning into a lot of pointless meetings teams feel like they need to have because that’s part of the manifesto they prescribed too.
I’ve also found lot of counselling and explaining starts happening when sprints aren’t going well or people become fatigued.
We could argue it’s not an Agile problem, like everything it’s susceptible to a lot of problems which we like to gloss over because it’s convenient to do so and those who advocate for agile haven’t bothered to revise and improve on the original manifesto to address these weaknesses.
the Agile manifesto is a bit like a bible in that sense.
Anyhow, as a developer I'm not a fan. I've seen the results of agile on the code and it's not pretty. Say nothing of the added stress on developers. Managers like to think that software development is linear. A developer should be able to get X amount of work done over a period of time. But as a developer we know that that's not always the case.
1) keep your stands below 15 minutes. Always. There should also never be more than 15 participants in your stand.
2) The EM/PM/SM or all of the above should be writing high quality tickets that are discrete units of work (they can be tested and have some tangible output). They should never be so large as to take a single developer the entire length of the sprint.
3) Do a single weekly grooming/pointing session. This should take less than 2 hours assuming management did their jobs
4) EM/PM/PM/SM need to actually keep the backlog organized. Don’t make devs sit thru meetings where you slowly drive Jira
5) Do demos, retro and planning in a 3 hour time block with breaks. Balance what went well with what speed bumps you encountered and call out exceptional work done by team members
6) Make judicious use of doing “proof of concepts” to help spec out features/APIs/Integrations before running off to plan larger initiatives
7) Appoint an “Epic Captain” to each epic (group of related tickets). This is dev who is the subject matter expert and has some decision making authority. Defaults to the EM but they should appoint other devs to take proactive ownership over things
8) Proactively track and discuss technical debt and raise it during retrospectives; EM follows through by ticketing it up.
9) Actually do planning when launching major initiatives. A few discussions between devs before leaping into several weeks long project won’t make you waterfall and will actually reduce meetings in the future
For us, the average time per week an engineer spends in meetings is less than 5 hours total, or <1 hour per day on a team of 8. Kinda high but things run smoothly and nobody is out of the loop
What kind of Agile are following that has these roles defined?
If Agile is being implemented in a way where engineering has zero formal authority or stakeholders that goes a long way to explain why engineers hate it.
"the Project Manager plays the leadership role by leading the planning for the execution of the project. Scrum Master plays a support role for the team members"
Agile development teams should be self organizing, and so a lead that decides on things is really strange. See the 11th principle of Agile:
11. Best architectures, requirements, and designs emerge from self-organizing teams.
If the team wants to appoint a tech lead, then fine. But forcing a tech lead onto an Agile team is not how it's done.
I get it that "Agile" is the hype and every company claims to do "Agile". I would love the see the companies that really implement the 4 items of the manifesto and 12 Agile software development principles. I'm sure most companies are doing the reverse than what is stated there.
> Make changes if it isn't working.
If measuring performance is so difficult, then how do you know if it's working or not?
https://www.cio.com/article/309171/scrumfall-when-agile-beco...
I personally dislike when it's made significantly more complex. High-performing teams can work in a standard Scrum framework or they can customize agile to suite their needs.
If you're spending hours a day in meetings, you're not using the framework correctly. In a fell-functioning team, you'll spend 5-10min max doing some form of standup, in some teams this is even async so no daily meeting. That leaves one planning meeting every two weeks and one review meeting to see how you've done.
When I was in Netflix and Uber, my teams had no status meeting, at all. We came up with a context and a big enough ownership, and just let the team loose. It's something like this: we need to enable services to send their events for analytics without ever talking to the data lake team. Steven, how about you own it? Then, a month or two later, everyone in the company can simply use log4j (at that time) to log an instance of annotated Java class, and in 15 minutes or less, the logged events became available for all kinds of queries in the data lake in the right format with the right metadata. No status meeting. No alignment meeting. No customer outreach. Not unnecessary shit. Things just happened, features just introduced. It's all non-event.
In the end, it is the culture that matters. Everything else is a matter of tactics.
But I agree with your general sentiment - As currently practiced, Agile generally involves a lot of ceremony before actually building, with many rounds of collaborative planning and risk management on every decision. It's morphed into something completely different than the original definition...
We have come to value:
Individuals and interactions over processes and tools.
Working software over comprehensive documentation.
Customer collaboration over contract negotiation.
Responding to change over following a plan.I think you might be getting pressure to change the way you work by folks that don't perform. That sucks; I've been there. Hopefully the pressure turns into nothing, because that's generally been my experience. Precisely because the folks applying the pressure don't get things done, and that includes changing the way you work.
How I prefer to run it:
- 1h per week alternating between estimating and planning
- (optional) 1h per sprint for backlog refinement
I like to keep two sprints worth of work in the backlog. More than that, the spec will change too much, and you will re-estimate. When a project has just started, or the requirements have become understood differently, to get four weeks of backlog work may require additional refinement. I typically do the bulk of this refinement myself (as a tech lead), and I try to avoid asking the team to have any extra meetings beyond what I mentioned above.
It can be good to have retros sometimes, but it's better to have a team that feels safe to share and discuss issues constructively without a mediator.
I'd also like to advocate for 1:1s. We are all humans and social organisms. Ideally, these 1:1s are 80% unrelated to a work task.
Be the one in your organization to solve this problem. Start with your immediate team. Doesn't have to be this way.
Some 0.02:
1. Sprint planning is slowed down by diving into technical details. Leave that for another time.
2. Retrospective doesn't need to be more than 15 minutes. Sometimes there is nothing to discuss. It may help to have participants populate an issue board before the meeting, so retro can focus on prioritizing and addressing. I use a mattermost channel called "Retro" where devs can add an issue they are having and all the other devs can vote with a thumbs up. Before retro I sort them from most thumbs up to least. Devs can reply to issues with a solution or an offer to help ahead of time so we don't have to discuss the issue in the meeting.
3. Don't let the backlog grow to big. Groom it regularly with tech lead and PO.
4. Maintain an open list where people can populate any "parking lot" items ahead of stand up. I use a mattermost channel called "Parking Lot" and I look at any chat items added on the day of standup. Devs can reply and sometimes solve issues before stand up.
5. Structure your stand up where everyone says: task # from jira/gitlab issues/etc they are working on, any open MRs that need to be merged in, and answer the question: do I have any impediments preventing me from working. The last item is a quick "yes I have impediments" or you don't say anything. Leave the details of the impediment to parking lot. Allow everyone to leave after the last member speaks. Anyone who has a vested interest in a parking lot item or impediment from another team member can stay.
The core of Agile is that it values:
- Individuals and interactions over processes and tools
- Working software over comprehensive documentation
- Customer collaboration over contract negotiation
- Responding to change over following a plan
Agile also has 12 development principles:
1. Customer satisfaction by early and continuous delivery of valuable software.
2. Welcome changing requirements, even in late development.
3. Deliver working software frequently (weeks rather than months).
4. Close, daily cooperation between business people and developers.
5. Projects are built around motivated individuals, who should be trusted.
6. Face-to-face conversation is the best form of communication (co-location).
7. Working software is the primary measure of progress.
8. Sustainable development, able to maintain a constant pace.
9. Continuous attention to technical excellence and good design.
10. Simplicity—the art of maximizing the amount of work not done—is essential.
11. Best architectures, requirements, and designs emerge from self-organizing teams.
12. Regularly, the team reflects on how to become more effective, and adjusts accordingly.
So now please check if your company is doing this or not.
If you say "We're following most of that, and it really sucks", then we can have a valuable discussion.
But if you say "We're not following that and it really sucks", well then why are you arguing that Agile doesn't work?
I feel the same may be true w/Agile.
As for myself, I don’t like all the agile rituals and ouija board crap, but I also don’t mind explaining what I am doing to clueless people a couple hours a week. Things could be much much worse. We could be paid a lot less and have way worse working conditions.
As other suggested, to understand the roots of Agile, I suggested looking at the Manifesto itself. Additionally, I suggest looking what people like Bob Martin, Martin Fowley, Allen Houb, Kent Beck, and Dave Farley are saying.
E.g. https://www.youtube.com/watch?v=hxXmTnb3mFU https://www.youtube.com/watch?v=4JihsBOBbdI
For reports on teams' performance, I suggest looking at the DORA's report. There thousand of teams have shown they experience in the last ten years. Additionally, if you want to some academic researches, going to Google Scholar and searching for "Systematic Review PUT_HERE_ONE_AGILE_PRACTICE" generally yields good results.
https://www.sciencedirect.com/science/article/pii/S095058490... https://ieeexplore.ieee.org/abstract/document/5654783/
It's meant to build cross functional teams of people who can produce predictable amounts of output such that people in Product Management can build roadmaps and concoct release schedules.
Not to mention, once a company has successfully implemented Agile (and its inherent trade-off of dev speed vs. predictable minimums) that company may now replace any person on any team with any other person. Nobody wants to say it but Agile is about hiring low rate contractors instead of expensive FTE resources.
An often overlooked part of Agile is that if you're an experienced dev who's also lazy is that this method provides a lot of cover to hide in. It's about predictable minimums. A clever dev with some talent can work about 4h/day and still outwork some of the less clever cohorts who may work many more hours.
Also, you seem very angry and thats a sign you probably care a great deal about what you're doing at work. Maybe its worth looking for something else to do where things operate more to your liking? Stress really is a killer and few things are as stressful as hating the way your job works every day of your life. Reading your story I think I'd be angry too in your position.
Finally, repeat after me here - "Agile is for MANAGEMENT - Agile is NOT for developers". The Happy Agile Developer is one who's figured out how the game works and uses that understanding to work less.
(We were too busy for an agile class or project, only got waterfall, since it is simpler.)
In my experience and practice, “it” works very well when the team and management understand why and how they do, what they do.
Its about working in a way that makes the development process both receptive and responsive to change. Focus shifts from requirement specification to early prototyping and quick release cycle.
To be agile is to be adaptive, not fast. You do that by working closely with customers / End users. You deliver small changes more frequently (sprints). To enable that you setup CI and CD infrastructure.
If most or all of these things sound unfamiliar, you need to question your own understanding of your process and focus on the “why” of it.
There is no set-in-stone way to “do agile”, therefore your criticism sound like someone pissing in the wind and shouting to everyone else about why its hitting you in the face.
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right, we value the items on the left more.
If this doesn’t describe what you’re doing, then it’s not agile, and it makes no sense to blame agile for what is just a busted process that someone has told you is “agile” without actually understanding what the term was intended to mean.I’ve worked in large companies where none of this is true, but they called it agile.
It’s not.
Could it be that your problem isn't with Agile itself but with Scrum (i.e. how you apply Agile)?
In my experience, it goes something like this;
– "We need a better way to work"
– "Oh, let's go with Agile, everyone is doing that"
– "But that's just a set of principles and guidelines though isn't it?"
– "So we need something on top of it then. To keep track of what we're doing and what we've done? And how fast we've done it. How fast we can deliver things. We have to measure the throughput of the features we ship. Oh and we need status tags so that we know which state every feature is in at any given time. And the features are too big of course, we need to split them into smaller \"tasks\", and they need to contain exactly the information required to complete the work without talking to anyone else. I mean I'm a manager and simply must know what people are working on and how they're solving it and, if they're not doing it fast enough. Right?"
– "Sounds good, how do we keep track of the way we keep track of things?"
– "Hmmmm....."
– "Oh wait! Meetings and ceremonies!!"
If you cannot succeed in a situation where you have motivated people, in an environment where learning by failure is encouraged and management that trust their workers I don't think you can blame Agile. But you could perhaps blame the framework that you execute Agile with because they have a way of demotivating even the best of us.
In a perfect world (where you're all in the same room all the time) the Agile manifesto and the development principles it comes with, a whiteboard and post-its will be all you need. Your problem is what you've replaced the whiteboard and post-its with.
I could of course be wrong here but this is, in my experience what breaks the camels back. Mostly...
I’ve done plenty of actually-agile development and it’s always involved one meeting at the start of an iteration to select the items to work on from the backlog, a daily 15-minute standup to address any blockers for our immediate work, and then a couple hours at the end of the iteration to demo the completed work and do a retrospective for anything unexpected that came up.
That’s always worked great for me, especially combined with sizing work items in points rather than time so estimates come out of measurement of previous work rather than guesses about how long things will take.
This is agile.
> My current company spends 4 out of 8 hours every day in meetings. These meetings include: - Stand up - Sprint planning - Retrospective - Refinement - probably 5 others that I’m forgetting
This is simply dysfunction.
You're contrasting process heavy vs process light, not agile vs. an alternative methodology.
When people contrast agile against something, it's typically the waterfall method of design. And you'd know that if you saw it. (Interviews, design docs, stakeholder sign offs, etc. before any code happens.)
Agile can be done well. I've seen it, and it was amazing. I've also seen "agile" implemented where the number of meetings (and the number of forms) keep going up. But the existence of the fake does not disprove the existence of the real. It just means that you have to be very wary of anything bearing the name.
It's on the so-called Product Owner to prioritize what's next sprint, projections, etc, and a Scrum Master is supposed to help protect you from distractions.
I've done this style of agile before, and it's great. However the issue is many mgmt types still only caring about when "all of this will be done?", and also teams and people which can't think incrementally.
This is similar to the lean approach in manufacturing that has been very popular over the past ~20 years.
I think ideally, agile should be where you put outcome over output, that's it. And I think that's the correct way of thinking when it comes to wanting to deliver the best product.
Do we do that here? Should we?
> Now please explain to me what part about spending half the day in meetings rather than writing code is actually “high-performing”
I'm not sure what agile methodology you're using that ends up with this many meetings, but Scrum, a popular agile framework, recommends only a few and the daily one is supposed to be relatively short.
> Below is an open-challenge to any person or organization
Define your metrics and make sure your printer has toner.
Sometimes this will look like one of the named methodologies under the "agile" umbrella, sometimes it won't.
Sometimes you get a team that will do fairly well regardless of which methodology they get stuck with. Sometimes you get one that will do badly regardless of methodology.
I just want to ask if someone here can elaborate on using pure Kanban? It seems to me a very lean, cheap and flexible tool.
Here's your problem. The rest is just measuring the symptoms and attaching labels to them, but the disease itself is clear. It's not about "agile". I don't know what is called "agile" in your organization, but whatever it is, the theory is not the problem. The implementation you have is.
Does not sound like agile. Standup is a 15 minute affair, planning & retrospective a once every 2-week (however long your sprints are) event 1-2 hours long. That's all. Roughly 4 hours for every 80 hours of work.
Whatever you have going on there is probably a wild detour off SCRUM inflicted by agile consultants, which seems to be very common these days.
It’s not that you can’t learn from previous experience, but we have an unhealthy tendency of looking for a one-size-fits-all solution that comes with a bunch of fashionable names attached in this industry.
I worked 10 years in a shop where I could quite literally do zero minutes of meetings per week if I so chose. Which I did from time to time. But the morning meeting was very short and a good time to just say hello to people so I often went.
Scrum, and any of its Agile™ derivatives are anti-agile.
If you want to know what agile actually means,you need go no further than reading the original https://agilemanifesto.org/
And actually make change and find what works.
What your company poor time organisation has anything to do with development methodology?
The problem with classifying the need for lightweight methods as an "agile" problem is that agile has become the dogma that it set out to replace twenty years ago. Let that sink in. The word agile divides the room and that's part of the problem with cliched corporate speak.
As a result, there is no more confusing argument in software process today than agile because we do not have consensus on its meaning. At best, defining agile is a choice paradox. This is a result of the spectrum from little a agile (actual agility) to Big A Agile (fake corporate agile) where the pointy haired boss tells you to select from a cargo cult of overly complex choices, all of which are bad. My experience has been that teams that wind up at real agile wind up there because they weren't worried about defining a cornucopia of cliched agile speak prior to moving forward and instead did a lean build-measure-learn cycle and just figured it out as a series of continuous improvement iterations whereas fake agile stems from trying to do what some other unicorn says works for them, failing, and never getting it right because there is no cycle of action learning and reflection. tldr; it doesn't actually matter what words you use to describe the gyrations, what matters is that the gyrations work for you and your team and produce the results the team desires.
FWIW, most of what I've said is supported in the research and publishing of Alistair Cockburn who was there when it all began twenty years ago and wrote Crystal Clear. The other academic I'd reference who has the done the work and arrives at what I believe are the correct conclusions is Allen Holub.
Different projects/tasks require different solutions and I'm tired of people pretending they don't
Unfortunately this heavily detracts from an argument that might otherwise have merit.
>He clearly put 44 billion dollars where his mouth is and told you that your pointless meetings don’t matter and they don’t need it to build quality software.
He's made a mockery of himself already and is well on his way to imploding the platform. Moreover, how much software quality do you think is going to come out of Twitter now that employees live in day-to-day fear under arbitrarily extreme deadlines, while understaffed at that?
The situation is a joke at this point and has more to do with Musk's mental instability than it does Agile, as much as I loathe some of its uses and implementations.
agile is for people who prefer 'classical music' working style, but want to simulate start-up mentality
Incompetence? Vindictiveness? A huge bag of weed?
> Agile team ... non-agile team
What is non-agile team, Waterfall? You sre the one demanding spesific information and studies, so explain clearly, and be spesific, what are you even advocating?
One of the issues I have with how agile is all things to all people is that nobody's trying new things. They're trying to fit what they're already doing inside the definition of agile instead.
This is a low-quality comment due to circumstances such as SBF having stolen a lot of my funds and my lack of experience at higher levels than senior IC in industry (other than startup CEO, I guess). I hope that some people who have worked in management, technical/management, or staff IC roles can give their thoughts soon.
In a small team with not many outside commitments, or with outside commitments that do not take up all of our time, we have enjoyed outsized productivity compared to my experience in industry, because we basically know what everyone is good at and we can get the right work to the right people, and because for the most part everyone feels some sense of professional responsibility, steps up, owns the whole problem, and gets things done. This may be rare even among startups though, because you know, even if you don't deliver you still get six figures of VC funding in your checking account.
In larger companies, it seems like several things happen:
- Many people are hired who basically cannot do some important parts of the process of designing, writing, and deploying software. That's not morally bad or anything! This stuff is hard. They don't teach it in school. Ideally we would provide them with mentorship. Basically no company provides them with mentorship.
- Processes are created to attempt to hold these people's hands and ensure software can be delivered according to any schedule at all, which ultimately prevent people who are actually able to ship things from shipping things, since they must instead create 20 page google docs about 100 LOC subcomponents, then go to several meetings about these google docs, then go to meetings with other teams about how to integrate the components between teams (this part is technically superfluous but perf and promo criteria say if you're senior and you want to get promoted instead of PIPed you have to make everything involve other teams even if it doesn't need to)
- Commitments are made between teams, to customers, or to management that exceed the capacity of teams to deliver, especially when it is impossible to create a staging-like environment, when problems from production come with truncated stack traces because the document size for elasticsearch is much smaller than the length of a Java stack trace, when none of anybody's time can ever be allocated to fixing these things because that would not deliver any features, when all of one's time must be spent in meetings or updating JIRA tickets or talking to PMs who pretend to be customers but have never talked to a customer in their life, etc.
- Because of the difficulty meeting these commitments, more processes must be implemented in an attempt to standardize the output of the team.
- Maybe continue by reading The Gervais Principle?
- It's possible that this isn't "Agile" and it's just "Micromanagement" but it certainly seems like 99% of people who say they are doing "Agile" are doing this stuff, and at some point one has to give up on linguistic prescriptivism.
Aside about Elon Musk and Twitter: It's correct that Twitter was run in a grossly incompetent manner up until now, and that Parag Agrawal is probably the worst tech CEO ever, but a lot of Elon Musk's changes so far have been to destroy the institutional knowledge needed to keep the site running at all by firing the ICs who have that knowledge. This does not seems like a great approach to say the least.