Wouldn't investors build massive amount and undercut other plants? Is it simply because the capital costs are already sunk, and the running costs are still competitive?
$100 for this is really bad, other energy sources are 1/3 of this. To me this spells the end of this project.
You need to be a bit more patient. solar / wind have been growing double digit percentages (from the top of my head something like 20-30%) p.a. now for some time. Just to compare, iPhone had never two consecutive full production years that would have had triple digit growth. And arguably increasing production capacity for energy infrastructure is more difficult than for a phone. So the 20-30% p.a. growth is likely the best we can have, and I'd argue even that is explosive. Given current growth rates, majority of electricity production should be solar/wind within the next decade or so.
It’s amazing to think how much power usage must be controlled by Apple. Any power saving they achieve on iOS has a hundreds of millions of units in the wild.
There's also a paradoxical cost risk created by such rapid improvements because faster deployment and plummeting prices can mean projects started after yours could finish sooner and cheaper.
In spite of this, PV is selling out as fast as it can be made, wind is being built as fast as it can be permitted, and demand is so high that prices decreases have slowed in spite of manufactuing continuing to get more efficient.
Batteries are a bit of a bottleneck (flow batteries are lagging a bit, but getting there), but sodium ion is here next year and lithium capacity is increasing at record pace.
Policy is kinda lacking in most areas for building out the necessary non-battery storage, but off river and blue field pumped hydro is picking up, and china is advancing the state of the art on concentrating solar (which is dispatchable over ~12-36 hours) and compressed air storage. Europe is also starting to build out thermal storage (which is dirt cheap in the most literal sense because it's made out of the sand that is worthless for other purposes).
In locations with lots of renewables already, new projects are including storage, cost-effectively, which turns non-disparchable power into dispatchable.
I think it's pretty clear that $58/MWh was never going to be achieved, and as with most nuclear projects, reality is 1.5x-3x of what the boosters promise. But even $58/MWh is not cheap enough to match the bids seen for dispatchable renewables+storage.
Nuclear projects are turtles chasing rabbits at this point, and the rabbit has head start.
The only countries that have successfully moved all or nearly-all of their electricity to decarbonized sources have done so primarily with dispatchable sources: hydroelectricity (E.g. Norway, Brazil, Albania, Uruguay) and with a mix of nuclear power filling in where hydro isn't enough (France, Sweden, Switzerland). All of those countries generate a single digit percentage of their electricity from fossil fuels. Nobody has decarbonized primarily through a source of decarboinzed energy source besides hydroelectricity or nuclear power.* Unless there's a storage breakthrough on the horizon, we'll still need to derive a significant chunk of our electricity generation from dispatchable sources.
* One minor counterexample is geothermal power, but like hydro it's geographically dependent.
Such as? Most storage facilities are targeting a few hundred megawatts of storage, usually enough for a few hours of power but not enough to even out a full night.
As the market changes and it becomes profitable to supply power at night, more batteries are trivially added. But while we still have so many fossil sources for the lull in demand at night, energy prices are at their lowest during the night.
As more fossil generation is replaced with renewables, more storage will be added.
One more snowy 2 (or equivalent) and Australia can get to ~97% solar+wind+pumped storage powered.
The only reason existing pumped storage sites used to target a few hundred MWh was because they were historically used for regulating the grid, not providing large scale storage.
The geography to do this is plentiful too, as multiple studies have confirmed.
ramp times are measured not in hours but in days
Modern LWR reactors ramp at around 5% per minute.
France & Germany use them for Load following https://en.wikipedia.org/wiki/Load-following_power_plant#Nuc...
Conventional nuclear is vastly more dispatchable than other fuel types
For comparison solar/wind are about $30-40. Levelizing with pumped storage pushes that up to $60-$70.
IIRC France and Germany almost exclusively use gas for load following. Even at current prices it's vastly cheaper than using a NPP to do it.
From: https://www.researchgate.net/publication/295114246_Integrati...
The NuScale plant incorporates unique features that enhance its ability to load follow, either due to changes in electricity demand or variable generation by renewable sources on the grid. This is accomplished through a combination of the small unit capacity of a NuScale module (50 MWe gross) and a multi-module approach to the plant design. This design strategy provides a uniquely scalable plant and gives the plant owner considerable flexibility in both the build-out of the plant and also its operation, including for load-following. The key power management options of the NuScale plant for load-following operations, designated NuFollow™, include the following:
• Taking one or more modules offline for extended periods of low grid demand or sustained wind output,
• Maneuvering reactor power for one or more modules during intermediate periods to compensate for hourly changes in demand or wind generation, or
• Bypassing the module’s steam turbine directly to the condenser for rapid responses to load or wind generation variations.
One problem is that the US regulatory agency doesn’t like load-following - apparently only one nuclear reactor in the states does it. It is common in European countries to do some load-following on time periods of hours to 2 days (although like all generation technologies, there are limitations and constraints). A section about France on the topic: https://www.world-nuclear.org/information-library/country-pr...At that point it's effectively just curtailment.
This helps build industry experience with molten salts and would allow it to be actually dispatchable (rather than paying for energy in the form of capex and fixed O&M and then just not producing it)