by mbloom1915 · 4y ago · 0 comments
Although critical to safety, much of the clean energy transition is in the hands of utilities to move quicker. With a 50+ year track record of not doing so I'm curious what government and/or private sector can do to remove the utilities involvement or red tape.
Level 2 chargers have been easier to install but the DC Fast Chargers backed by big IRA bucks will be a tough slog. Utility transmission line drops (12 months), battery storage, installation/engineering (3 months) trenching, concrete pouring, permitting (3-6 months), union labor, DOT involvement (6 months). The day is soon approaching where we have far more EVs than charge stations ready to install.
No comments yet.