by geocrasher · 3y ago · 0 comments
Watching SpaceX land rocket boosters on target again and again is kind of magical, like something out of Kerbal Space Program. I wonder how long it's gonna take to get a fully reusable rocket. They're working on the Starship and it's supposed to be fully reusable.
The innovation here isn't about reusability at all, it's about the economics of reuse. Maybe landing a rocket back on the pad rather than recovering them from the ocean makes it cheaper to reuse, has there been a study around that?
Surely this entails a host of quality checks between flights? What is that cost estimate at?
Additionally, solid rocket boosters are some of the hardest things to re-use as the process of re-filling them is more like re-manufacturing them than actual true re-use. The sections (they had 4 sections) need to disassembled and refilled with the epoxy that is the solid rocket fuel. They were additionally made of steel rather than aluminum so were not substantially valuable components to recover versus the high end aluminum alloys in the external tanks.
In short, performing RTLS requires additional fuel. This is fuel that can no longer be used to boost the payload into the correct orbital insertion. So all RTLS missions tend to be lower performance missions that don't need the full power of the Falcon 9 / Heavy since they have fuel to spare for RTLS.
It's about both.
SpaceX showed that the 1st stage of a rocket can be reliably reused in production. Which is really important from an architecture perspective because 2/3 stage rockets are just more efficient than 1/1.5 stage rockets (mostly due to the propellant mass fraction term of the rocket equation).
To give some examples, the payload mass fraction of some reusable rockets is:
* Shuttle(partial reuse): 1%
* Falcon 9(partial reuse): 4%
* Starship(full reuse, in development): 2%
And SpaceX had to iterate a lot to get this working as well
It is rocket science
Ariane space was still arguing that reuse wasn't viable for them due to their low flight rate only until a handful of years ago. As far as I'm aware, ULA's CEO still insists that anything more than their proposed engine segment reuse is going to require too high of a flight rate to pay for itself (IIRC he said they'd need 10 flights per booster).
This is also part of why SpaceX's model works. Even when disposable F9 is much cheaper than previous rockets in its class.
I assume you mean the cost-plus contracting model? Or is there a different incentive mechanism you're referring to?
From Wikipediea: "Out of 270 SRBs launched over the Shuttle program, all but four were recovered – those from STS-4 (due to a parachute malfunction) and STS-51-L (destroyed by range safety during the Challenger disaster).[6] Over 5,000 parts were refurbished for reuse after each flight. The final set of SRBs that launched STS-135 included parts that had flown on 59 previous missions, including STS-1.[7] Recovery also allowed post-flight examination of the boosters,[8] identification of anomalies, and incremental design improvements"
Also the rockets on the shuttle itself were landed and reused.
NASA put the cost of a launch at about $450 million in 2011, but that is pessimistic. That is simply the years cost divided by the number of launches in that year. The marginal cost, i.e. the cost of going from N launches to N+1, will always be lower. The Shuttle was designed to fly 24 missions per year and actually flew an average of under five missions per year. The lack of demand was a substantial reason for the high cost.
I find it tedious that every conversation on this topic has to start with the same tired old memes. No, the Shuttle did not cost $1.5 billion per launch. No, reusable launch vehicles are not new. No, not even reusable launch vehicles that land vertically under power are new. No, the price to LEO has not fallen by an order of magnitude. No, ULA is not dead in the water. No, neither is Ariane. Yes, the Shuttle program was badly mismanaged. Yes, the Falcon 9 is pretty cool.
SpaceX is getting the entire first stage back in mostly flight-worthy condition. Nobody outside the company truly knows how much work is done between flights but it appears to be vastly less than Shuttle.
Can you expand on this? I've looked for information on how much rework they require but have never come up with a good explanation. I'm curious because spaceflight requirements are typically very stringent and refurbishing back to those requirements isn't a trivial task. A lot of the cost for Shuttle was refurbishing to meet the quality requirements.
It's a useful clarification that the Space Shuttle program had a large amount of reuse in the design ... but it still cost over a billion dollars for each reuse, many multiples of e.g. fully expended soyuz. So until SpaceX proved that reuse could be done well, and economically, it wasn't obvious. Now it's super obvious and practically all space programs are frantically trying to catch up.
(The SS could carry fairly large ISS module payloads into orbit, while cheaper rockets/spacecraft couldn't ... but couldn't get to high orbits or beyond ... details details.)
It is not clear if SpaceX is there per flight. They still need to spent several weeks on refurbishing of the landed booster.
You link seems to be specifically about Soyuz MS, a capsule. No idea how much SpaceX spends on refurbishing dragon.
However, this only works if there is enough demand to use all their capacity. At the moment this demand simply does not exist. SpaceX manufactures its own demand. The majority of its capacity goes to launching its own satellites. This lets it keep its cadence, but literally burns the company's own resources to do so.
Whether or not you think Starlink makes any sense in the long run, at the moment it is losing money hand over fist. It serves as an indirect subsidy for SpaceX's other customers.