142 points · by mfiguiere · 3y ago · 203 comments
Right now we're creating a tool that gives the engineers insight into all these factors and automatically creates possible routes through all this madness. It's quite interesting to work on and fascinating to learn about all these complexities. It also doesn't scale well, we're building this for the Netherlands, which has a lot of centralized, (mostly) open data that can be used. In other countries that's not so much true.
- Everybody co-operates, everybody gets paid a little bit.
- One or two people make unreasonable demands, the builder caves and they get paid a lot.
- Several people make unreasonable demands, nobody gets paid.
It's more complicated than that because multiple routes are always considered simultaneously, but the basic large number non-iterated prisoners dilemma problem applies.
I think therein is the issue. Who is to say that the small piece of property isn't worth the "unreasonable" amount to that owner?
My home is worth $X on the market, but I don't want to sell it. Why shouldn't it be worth 10 * $x if a company wants to buy it from me? Why should I be forced to sell?
If we tried to rebuild the train network we have today using the protracted legal process we have for reallocating land, it would be 100% impossible.
The "checkerboard" system granted alternating squares of land to the railroad companies as an incentive to build out the network. The railroads sold those squares to various entities.
The result is that much of the public land in the Western United States is "corner-locked". There are two parcels, diagonally adjacent, but a new easement would be required to cross between them.
Even if you could get the corner easement you'd be running lines that zig-zag all over the place, so now the private owner can extract whatever the savings are for a straight line.
https://www.onxmaps.com/onx-access-initiatives/corner-crossi...
He is just saying that sometimes the best solution/route is over private property where the owner gets paid.
So on a 10km+ route with hundreds of properties, multiple municipalities or other public organizations and other utilities, this gets really complicated really quickly.
This seems like a bit of a stretch. The usage of extremely tiny portions of rural land for infrastructure pales in comparison to the ludicrously large subsidies of rural areas by urban areas.
Which subsidies are you referring to? The department of agriculture does have subsidies, but they measure in the (<10) billions which I don’t think we can call ludicrously large in comparison.
Which is more an inconvenience than a problem for the general population, but still.
The other thing that's happening is that while the energy companies, with help / subsidies from the local and EU government, build large offshore wind parks and the like, at the same time the capacity is bought up by large new datacenters from the likes of Microsoft and Google, meaning that they don't actually replace grey energy sources. Said datacenters also use up drinking water for cooling, for some reason.
That is surprising but also makes a lot of sense. Companies go for the already built cheaper option to maintain that they’re going green while taking it from others! That’s actually kind of harmful and they should have to pay for building energy if they want the moral credit for it.
I don't think that's true. For instance, São Tomé and Príncipe is well run by all accounts I've read. I'm sure there are others, that's just one that comes to mind right now.
Does not strike me as a well run country despite their little population.
1- https://www.cia.gov/the-world-factbook/countries/sao-tome-an...
It's still generally true that the old grid infrastructure is re-used.
The UK has many closed coal, oil, gas, and nuclear power plants on or near the coast. When those plants are decommissioned or demolished, the grid infrastructure that was built for them (substations, transmission lines) is usually left intact.
New off-shore wind farms can now use those access points, which greatly reduces the cost of connection compared to having to build everything from scratch.
Over the last few years, lots of renewable generation and storage projects have taken advantage of the grid capacity in this area, but all the low hanging fruit is gone now.
These days, it is not usual for projects to be given a connection date in the 2030s due to the requirement to reinforce the transmission network.
E.g. to get a 132+ kV circuit constructed you need to go through the DCO/NSIP process which takes many years. https://en.wikipedia.org/wiki/Nationally_significant_infrast...
The CEGB constructed the 400 kV supergrid in the space of 15 years during the 60s and 70s. A project of such magnitude today would most likely be tied up in the planning consent process for 10+ years.
https://www.channel4.com/programmes/guy-martins-great-britis...
The old coal plants were built nearer to consumption, most of which is in the South East of England. The planned wind farms are mostly in the North Sea, far from South East of England. It will cost billions to build the infra to connect the north with the south. It’s not a simple matter of reusing what exists.
In the case of nuclear, this was to ensure reliable supply of cooling water. In the case of oil, it was to make it easy to unload crude directly off ships. The oil-fired plants were often co-located with oil refineries, many of which have now also closed.
Much of the problems were due to poor maintenance; trees not trimmed, old poles not replaced, transformers old, salt spray on wires, etc. But the parent company crowed each year of profits and dividends. They also raised rates 5% to 10% each year claiming they had no money.
Solar would help but we also need a stable grid. But even with solar my local government doesn't even allow the use of battery storage in homes batteries can only go in garages.
Batteries in that quantity are something of a fire risk, which is why some jurisdictions mandate they be "outside". Although this is probably just a different kind of over-caution.
The PV industry is saddled with an insane number of regulations designed to make PV installations as expensive and ugly as possible to discourage it. The utilities absolutely hate the idea of becoming a glorified standby network, but they fear people going "huh, I...don't actually need you at all" even more.
That's why when you see a typical PV installation, there's giant orange warning labels all over everything, multiple panels/junction boxes, etc.
It's also why you can meet all the state regulations, but still fail one of the multiple inspections utilities require before you can fully connect the system.
Same reason the utilities are pushing for state laws that automatically condemn a property if there isn't a grid connection.
We're currently rolling out required remote management to remotely disable rooftop input on high solar input low demand days and likely to see a future where batteries are larger, isolated (for fire | emergancy), and serving local clusters of ~ 200 homes moreso than every home having batteries.
There's an efficiency and robustness at that cluster size.
Long distance HVDC runs are apparently now so good that it is commercially feasible to drop a few million solar panels outside of Darwin, and run an under-sea HVDC cable to Singapore.
Why there's apparently no push to hook up WA to the rest of the national grid, I don't know. It would seem to be a great way to shift power from solar and wind between the east/west and help match up demand and production more.
It's not. But we've never before had a "we are generating electricity with a marginal cost of $0" situation before. As coal and gas generators had to pay for fuel they stopped generating rather than create an excess. But ... why turn off a solar panel?
We've come close with nuclear because it can't turn off quickly enough to match the normal demand cycle. As a consequence Japan has the most pumped storage per unit of generation in the world. They store their excess nuclear generation so they can sell the excess later. That's the best strategy for nuclear because it's so expensive, but in the renewable world its cheaper to over provision than it is to build storage (to some extent), so it's likely there will always be periods of excess.
So now we find ourselves in the novel situation of having literally GWh of electricity available for close to free. I can't imagine the situation remaining for that way for long, as we find a use for most concentrated waste streams. Here in Australia we even recycle our sewage solids. I presume that's the one reason for the current "green hydrogen" push in Australia. If green hydrogen doesn't work out, it will be something else like Aluminium or carbon free steel production.
Western Australia is remote .. there is no connected neighbouring grid (to NT or SA) and the distances are vast.
Winding down solar inputs from individual houses is a comparable way of shedding sources, even better is being able to balance the local cluster inputs between "main grid" (wider urban areas) and "local storage" (per N house battery banks).
If water wasn't such an issue here there'd maybe be plans to expand the main dam to handle pumped hydro (that requires both an excess of water and a lower elevation secondary capture dam) so ther are plans afoot looking at alternative short term storage solutions (in addition to battery farms).
Whoa, that's impressive. Do you know what the per-mile cost would be? The great circle distance from Darwin, NT to Singapore is a little over 2000 miles; call it 2500 to account for routing around the intervening islands and such.
Though I'm not sure that Darwin is the best place to drop a few million solar panels, considering its stormy climate. A few hundred miles south towards the desert, maybe ;-)
If I did it on my own then I'd risk having my home insurance cancelled.
Smaller standard designs would make it easier to handle disruptions, make a power grid more resilient in the face of natural or man-made disaster. It would also make it easier to scale. Having a power grid with interchangeable parts would reduce the logistical complexity of spares management.
That new sources changes the power flow not only locally, but potentially all over the grid. It also changes the way TSOs react to equipment failures: typically, when an equipment like a power line opens, the power flows differently in the network. In order for other equipments not to become overloaded, operators study the network situation and have go-to solutions that involve changing the network topology, rerouting power and, in extreme situations, cutting some consumers. If power sources within the network change rapidly, that study work becomes obsolete fast, and that becomes a problem for operators and their ability to maintain a secure transport grid.
TSOs are working on it with both R&D and industrial applications, but that's not a fast process, and sometimes it challenges assumptions that used to be safe, and uncovers big question marks.
You get into problems though if more of these transformers go offline - e.g. because someone shoots them with rifles or artillery - because the lead time is weeks to months. And completely forget about a nuclear EMP scenario... it would probably take a decade to recover from that.
I suspect transformer production could be ramped up if the manufacturers were convinced that it wasn't just a temporary blip.
Of course automation is getting better/cheaper. Things that were not wroth automating in 1960 are now so easy that you would automate it even if you only need one. Modern CAD/CAM systems can often go from drawing to automated production with the press of a button. Over time more and more things will be automated.
Skilled machinists need to be trained. Sometimes you automate production just because you can get an engineer to design the automation faster than you can get access to skilled machinists to do the job. (this assumes the automation can be set up with less skilled labor - often automation itself requires more machinist time than one of the part it is making)
Here's what I should have said....
What's needed is standardized, interchangeable transformer modules. We need to be able to parallel as many of them as we need to manage a load, and if one dies, swap it out with a new module, possibly 30 years later, with NO need for adjustment.
Just as precision makes it possible to deliver parts that fit within 100 microns from countries on the opposite sides of the globe (and has for almost a century thanks to Johansson[1]), we should be able to produce a standard, easily paralleled transformer module that can simply be bolted to others to match situational requirements.
Bolting in a new module shouldn't result in the need for balancing or any other adjustment, the parts should just work together.
This would have helped immensely in Ukraine, for example... as missile damaged sections of a transformer stack could be individually replaced, instead of the whole thing.
There are enough CNC tools and measurement techniques in the world to make this possible, we just need to make it happen.
Other issues are regulatory in nature. The article goes into some detail on the matter.
Doubling the size of the grid was not easy any of the other times it happened. It was hard then, but it got done.
The article notes India’s electrification as a partial counter-example: relatively fast, but correspondingly relatively unstable. (One marker mentioned was “kerosene liters consumed”, as a proxy for how much lighting has been replaced by electricity, they note the amount dropped from 9 billion liters to 2 billion liters, which I take as a very rough indicator of ~80% grid reliability - not even one “9“ of stability. It’s hard to find representative data on developed-world power grid reliability but for instance there is a common estimate that the average Australian resident experiences 200 minutes of power outage per year, which corresponds to somewhere above three-and-a-half 9s and below four 9s. This suggests potentially quite an extreme cost in stability for the moderate benefit of speeding up queue times for renewable power.)
Grid instability happens when load and supply are no longer matched. That's when serious things have to happen - load shedding and rolling blackouts. In the developed world we put a lot of money into avoiding this - pumped hydro, battery storage, fast response gas turbines, frequency control programs running with big industrial users, and (opt-in) load shedding of big industrial users. All so that power is available to an end user who needs it.
The UK has transitioned to renewables perhaps faster than any other major economy in the past decade[1], yet has a very reliable and resilient grid[2].
[1] As recently as 2012, around 45% of the UK's electricity was generated from coal. Now it's almost zero, with the last coal power plants to close by 2025. In the same period, renewables have grown from <5% to over 40% of grid supply.
[2] "Five 9s" transmission system reliability of supply nationally in 2021-22: https://www.nationalgrideso.com/industry-information/industr...
See this plot:
https://ourworldindata.org/grapher/electricity-production-by...
Agree, the speed of transition has been quite fast. As you can see in the following plot the UK started out at a rather low level of renewables. At this relatively low level the transition is probably easier than at higher levels.
https://ourworldindata.org/grapher/share-of-electricity-prod...
I'd guess the real challenge with grid stability will become more visible when grids all over the world reach some 2/3..3/4 of renewables.
https://www.solarquotes.com.au/blog/sa-renewables-milestone/
If you pull that chart to its full timeline, over 200TWh of coal production existed, and it's essentially all gone now, but there isn't 200TWh of gas and biomass, in total they're maybe 140TWh. There is 60 TWh of wind power production.
Now, in terms of capacity for instantaneous power, the Combined Cycle Gas Turbine plants probably do add up to similar capacity to older coal plants which were phased out, at least very close, but it's pretty rare for all that generation to actually be needed - this chart doesn't really show that.
As to "transition" the countries which look "slower" on this chart are mostly using a lot of hydro, which is very different from wind or solar, as well as being readily available from the mid-20th century a point where solar and wind power were not really established options. So we're not talking about China having a bunch of wind turbines, then kicking back for a decade and only adding more recently, but instead their enormous country has hydro power, and now it also is adding wind turbines. The UK is a small island (and some other even smaller islands which are useful for wind but don't produce hydro power) and doesn't have vast majestic water bodies like Lake Mead, so hydro power has always been a tiny niche here, and that's all you're really looking at.
Actually, most of the coal has been replaced by wind and solar. Biomass is not really that significant: it's only around 5% of the UK's grid supply, compared to over 30% for wind and solar. New biomass plants are no longer considered renewable in the UK so it's unlikely to increase in the future.
Not sure what data your chart is based on, but it's wrong, at least for biomass. See here for some up-to-date data (you can use the controls at the top to see different periods and historic data): https://www.electricinsights.co.uk/#/dashboard
Natural gas is still the largest single contributor to the UK's grid supply, but it's in decline, and will be overtaken by renewables in the coming years. Wind capacity will triple in the UK by 2030!
Imports have also increased in recent years as new HVDC interconnects have been brought online.
More like a little under half due to those. From the plot at ourworldindata, expanded to start at 2012 since that is when the comment above was talking about, here are the changes in TWh contribution:
-137 Coal
-23 Nuclear
0 Other renewables
1 Hydro
3 Oil
11 Solar
24 Gas
24 Bioenergy
45 WindI bring this up because I am constantly annoyed by those who really haven't thought through their green energy dreams, and forget that compromises need to exist. These compromises actually have no serious penalties whatsoever BTW, it just requires a more complexity thinking process.
And in this case, it means that there will be a lot of times where the solution is to build a gas turbine running on hydrogen, ammonia, synthetic fuels, etc., or build a nuclear reactor. Just piling up more and more renewables onto the grid isn't a solution. We are finally seeing some people come to reality on this, and I expect even further shifts to more realistic thinking in the future.
Not entirely true, storage does cost money:
https://www.energy.gov/sites/default/files/2019/07/f65/Stora...
That said, as the tables in that report indicate its quite a complex topic.
(By my back of the envelope maths switching UK to fully wind and storage would triple electricity prices)
It's just silliness disguised with maths. Which is excusable the first 10 or so times its done, but is getting old now.
Also, a big chunk of the “energy storage” solution is utilizing biofuels. Like in Germany where wood burning power plants are seen as green (hint: they’re not). Getting rid of this will be a huge boon. The compromise in question will have significant environmental benefits. It’s unfortunate that so many are blind to their own bad ideas and have not noticed the problems of biofuels.
Grid power dwarfed that produced by local generators even when it was 9 billion litres. 80% stability isn't the right conclusion from this.
In the UK, and elsewhere, there are a lot of home owners that have solar on their roofs. The reason is not power outages but electricity prices. And with recent price spikes, more people are considering doing that all over the world. The whole assumption that most new generation has to come from the grid is increasingly less true. Both companies and consumers invest in cheaper private power generation. Especially companies have a big incentive to reduce their cost. The more power they need, the bigger the potential savings. And of course increased demand with a limited supply creates price spikes as well. We saw that in the last few years. This just speeds up the decentralization.
Australia is a good example. About a third of the houses have solar panels already and the building codes are being updated to require solar panels for new construction and renovation projects. Millions of house holds generating tens of kwh every day is adding up to a lot of power. And a lot of it goes straight into the grid as well. Which adds to the instability. Lots more will be coming online in the next few years.
Personally speaking, power cuts are so rare and short that I don't think about them or plan for them.
When I was growing up in Israel (1983-2005) power outages were common but not frequent (once every few months, my parents had a permanent supply emergency lighting, flashlights and candles at home for when the power would go out, usually for just an hour or 2).
Ever since moving to Austria (2005) and then Germany (2013) I think I have only once or twice experienced power outages and they only lasted a few minutes. So probably >20x less common (once a decade instead of a couple times per year) while also getting fixed a lot quicker. I don't know how much the infrastructure has improved in Israel since (I would guess it's better now but not as good as in Austria and Germany) but even back then it was still just an occasional nuisance unlike in the developing world where it happens enough to really impact people lives and productivity.
What are the redeeming qualities of the country, aside from the nature, which is fabulous?
If you are white, aren't you afraid of a possible pogrom against your family?
Redeeming qualities: I do have pretty good buying power in SA, the weather is great,and it is quite a multicultural place with friendly people by and large.
To my knowledge the rate of black on black violent crime is higher than black on white crime - SA has a general problem of violent crime. Its definitely a problem but a pogrom specifically is not a chief concern for me.
You putting solar on your roof is not significant. Your whole neighborhood putting solar up should be significant, but odds are this is done by individuals who don't realize their collective action is significant.
Their is "how well the moving bits are moving" which is different than "lines getting knocked down by acts of nature".
So, for example, I live in Seattle. Our power generation is quite reliable, but trees falling down during wind storms and knocking out power lines is also reliable, gravity being what it is.
I don't consider the Seattle grid to be unreliable, though I do acknowledge that digging up the entire city and burying power lines would, at great expense, prevent nearly all power outages.
But that sort of unreliability feels different than brown outs.
At some point kerosene subsidy was removed and people shifted to battery based backup systems/ lights etc.
Electricity is unstable in large parts is my experience.
I don't think those are related at all. Someone without electrical infrastructure running to their village is going to burn fuel regardless of how reliable the grid would be.
Now that solar is cheap enough to support itself without subsidy, the math is changing at the grid connection.
Everyone is producing gobs of power in the middle of the day, and just expecting the grid to take anything they can't use onsite. Then in the early evening, it all reverses quickly and the demands on the grid quickly flip.
In my mind, a connection to the grid should pay per kWh for two things: generation and transportation. When I pull power from the grid, I pay for both of those things. I pay to have those watts generated, and I pay to have them sent to me.
When I push power onto the grid, I am paid for the generation. I do not get paid to send it to wherever it goes, that's someone else paying that part.
For a (mostly) US perspective, check out David Roberts' Volts, "a newsletter about clean energy and politics". https://www.volts.wft Links below to episodes specifically about grids.
But since our grid is the elephant in the room, it's touched on in most episodes.
My noob TLDR for USA is:
Overlapping jurisdictions are a huge roadblock. To build new capacity, you likely need permits and buy off from every state, county, property owner, and special interest touched.
There's no federal plan to reform our currently siloed systems. Build Back Better addressed this. But because the Inflation Reduction Act was passed thru "reconciliation", it doesn't contain those "third leg" of necessary reforms. Huge disappointment.
Predictably, progress is being further stymied by a huge reactionary anti-electrification noise machine. All the usual suspects are dumping money into astroturf groups and propaganda to oppose anything and everything, from windmills to induction stoves.
NIMBYs have weaponized environmental regulations, created in response to past abuses, to thwart progress.
Just like how "the internet treats censorship as damage and routes around it", reformers and innovators are finding alternatives. Stuff like: colocating generation with consumers (industrial heat), embracing geothermal, and beefing up existing grids with storage.
--
Transmission week: why we need more big power lines https://www.volts.wtf/p/transmission-week-why-we-need-more#d...
Transmission week: how to start building more big power lines https://www.volts.wtf/p/transmission-week-how-to-start-build...
Transmission fortnight: burying power lines next to rail & roads to make a national transmission grid https://www.volts.wtf/p/transmission-fortnight-burying-power...
Transmission month: how to make the existing grid work better https://www.volts.wtf/p/transmission-month-how-to-make-the#d...
Transmission month: two more ideas to quickly boost the transmission grid https://www.volts.wtf/p/transmission-month-two-more-ideas#de...
The challenges of building transmission in the US, and how to overcome them, with Liza Reed https://www.volts.wtf/p/volts-podcast-the-challenges-of-buil...
What's up with Manchin's plan to reform energy permitting? https://www.volts.wtf/p/whats-up-with-manchins-plan-to-refor...
[Bay Area] Peninsula Clean Energy attempts to achieve 24/7 clean energy https://www.volts.wtf/p/an-energy-provider-attempts-to-achie...
Utilities are lobbying against the public interest. Here's how to stop it. https://www.volts.wtf/p/utilities-are-lobbying-against-the#d...
China isn't playing by the pretend limitations you put on yourself and it looks like you've already admitted they deserve to be the new hegemon. Yay for totalitarian communism I guess.
The stat that 80% of the UK queue might be effectively domain squatters with no actual project waiting to flip to real developers is shocking. Pure rent seeking middlemen.
Though at the same time, it means all the other stats are BS. Like saying that a concert is sold out and there's no way to get a ticket until the next time they visit in 5 years time because 80% have been sold to scalper's bots. It just doesn't logically add up. The tickets are available, you just need to pay a markup to a scalper who performs no real service to society.
Unless the government in its infinite wisdom decides to exterminate all sparrows or so and causes a countrywide famine, I guess...
Some of the limitations are pretend, but some are very real. European countries in general want their grid to be stable and reliable, and the surges and dips of power that come from "too much sun" or "too much wind", or lack of either, are going against it.
On the other hand, India, mentioned in the article, has so many blackouts already that it can cope with some extra instability. Of course, the unreliability of the grid contributes to the reluctance of foreign investors to build industrial plants in India, which is a major downside, but hey, they can alter their grid faster.
"Too much" solar and wind are not, and have never been, a problem for a grid.
Large thermal plants provide inertia that renewables simply can't provide. A lot of the work around incorporating renewables into grids is around the provision of synthetic inertia and how to manage sudden drops in supply.
Battery storage is one solution. Better demand response solutions backed by energy markets that incentivise the participation of large numbers of energy users is another.
Grids that have a high level of interconnection with other grids also reduces the impact of inconsistent supply, but not every grid has enough inter-connections for that to be a viable full solution. (See ERCOT in Texas, AEMO in Australia, Eirgrid in Ireland for examples)
Here in Ireland, we frequently run the grid up to 80% renewables, but the grid operator only does that because they have the mechanisms in places to handle sudden drops in supply.
https://www.google.com/search?q=germany+czech+grid+windfarm+...
Most of this has been dealt with in the meantime, but such problems really do occur, but they're utterly blown out of proportion by the anti-renewables lobby.
It’s a good thing we are pretty good at performing all kinds of not simple tasks and have been for a very long time.
Aren’t we good at this especially since fossils fuels ?
and that's also one of the reasons they still have so many coal fired plants close to population centers.
and we'll see how long Xi's luck lasts (which in practice means how long the benefits of the reforms will last, before the inevitable corruption of dictatorships eats it up)
also, tiny nitpicking, so far it seems China is just very authoritarian, but not totalitarian like North Korea.
https://www.power-technology.com/features/chinas-mega-transm...
> The Changji-Guquan +/-1,100kV project is a major technical step-up, making it the world’s highest DC voltage,” said Liu ZeHong, executive vice president of SGCC. The project is the first of its kind, but could be followed by many more crisscrossing Asia and the world. Already SGCC has plans for the construction of more ultra-high-voltage DC (UHVDC) lines both domestically and as part of its Belt and Road Initiative, a project that is aiming to increase Chinese-led infrastructure investment in more than 80 countries.
> SGCC president Liu Zhenya has dubbed UHVDC an “intercontinental ballistic missile”. It is a key part of his Global Energy Interconnection initiative,
Its amazing what you can achieve when the main conversation isn't "are all the scientists hoaxing us because they irrationally hate our precious fossil fuels?".
https://newsroom.porsche.com/en/2022/company/porsche-highly-...
I'm very much open to suggestions for "low capex ways to make productive use of 'spare' electricity, preferably reversibly even if efficiency is low".