by bee_rider · 3y ago · 0 comments
That’s a pretty neat idea.
I wonder if it would be possible or even desirable to try and get some automatic measure of “how much” you depend on a given project, to weigh the split. Probably that would be really difficult to capture. Anyway the current idea is already pretty cool.
The formula is explained in https://thanks.dev/static/how.