SLS has had a 100% success rate. One launch, one success. But it costs $2B per launch (and climbing) and has taken 12 years to get here. Plus, it's stealing pieces of the Space Shuttle, which was developed in the 70s over a long period of time.
Starship will launch a half a dozen "failures" before they achieve success, but they will have a bigger, better launch system that's fully reusable and costs orders of magnitude less per launch.
"Fail fast" applies to more than just software.
That sounds logical, but isn't really a thing in aerospace/space. Complicated high-energy systems have thousands of failure points. So to have any chance of success each failure point needs to be engineered below, by way of example, a 0.0001% chance of failure. That costs lots of money. But say one decides to accept more risk for less cost. Ok. So you switch from 0.0001 to 0.001 failure rates. You risk is now 10-fold higher at each failure point, but with thousands of failure points adding up you are now essentially doomed. And you haven't saved anything. The cost of 0.001 components isn't fundamentally different than the 0.0001 components were. SpaceX can save money though different business practices, by trimming people/money/contracts/compliance and such, but if you look at their rockets they are not fundamentally any less-perfect than anyone else's. They cannot afford to be. This is why rocket failures, like aircraft failures, are taken so seriously. There is an extremely fine line between "works ever time" and "never worked twice" with very little money to be saved between the two.
Across many areas, risk-v-cost math never really happens. It is either go or no go. Take CPU production. Intel spends billions at each of hundreds of fabrication step to push down miniscule error rates because any of a million errors can destroy a chip. There is no money to be saved by allowing any one process to become less than as perfect as it can possibly be. A detected slip from 0.0001 to 0.001 at any step would result in an entire fab being shut down in order to diagnose the problem. The marginal savings of a less-than-perfect process isn't worth the exponential increase in the risk of total system failure.
And you can look all the way back to their little hopper version of the Falcon 9 and see that this strategy has been the key to them undercutting the launch market significantly.
My prediction: SpaceX will have a 5th 100% successful launch of Starship before the SLS has a 5th successful launch. They'll just have ten not-100%-success launches before then.
They have greatly benefited from being able to use modern tools and seen where other systems failed. Many rocket companies have failed when trying to go fast and break things because it isn’t an easy shortcut. Instead SpaceX has used the normal approach used by other successful organizations and simply executed it well.
It does though. During the development process. SpaceX will do five launches with lower reliability vehicles before the big launch providers will even do a single launch, and those five will have be cheaper in total. Of course, they aren't putting essential cargo (or god forbid people) on these higher risk test flights. By the time they're doing that they have developed certainty in the design.
SpaceX does not have a difference in intended reliability, or a difference in design reliability. (At least for the rocket as a whole. One could argue that 33 engines allows lower engine reliability through redundancy)
What they DO have is a significant difference in prototype reliability for live launch. This is clear when you look at their launch history.
Why? If you're launching people I see why you want near-perfect, but if you're launching something with a low replacement cost (ex: getting fuel to orbit to support other projects) it seems to me that as volumes get large enough eventually "use lower quality and accept a slightly higher probability of failure" starts to be cost effective.
Indeed, if we assume that the each launch is an IID binomial coin flip (which isn’t really the right way to evaluate right-censored data), and observe (by reading Wikipedia) that SpaceX has had at least 450 successful Falcon 9 launches since the last in-flight failure, then they have at least five nines of reliability:
0.999995^450 ~= 449/450.
Which appears to be an industry-leading stat.
For context (excluding the Columbia re-entry failure), the space shuttle only had 4 nines:
0.99994^125 ~= 124/125
I saw in another comment that each SLS launch costs $2B. Do you think SpaceX spent $2B on this launch? I find it hard to believe.
substitute rocket and spaceflight with airplane and flight and see how that sounds
I don’t think SpaceX has smarter engineers. I don’t think they even have smarter managers, since many of their executives used to work for NASA and/or traditional aerospace firms (e.g. President+COO Gwynne Shotwell started out in aerospace at a private non-profit research centre doing contract engineering work for the NASA Space Shuttle and the US military space program)
One big difference is Elon Musk at the founding of SpaceX told his executives to take big risks (as in “if this fails we go bankrupt”). I think Tory Bruno at ULA is a great CEO, but no way is Boeing or Lockheed-Martin ever saying to him “we want you to take such big risks that we might go bankrupt if they fail”. He, and all the people under him, are only allowed to take small-to-medium sized risks. But that puts a definite limit on what they can achieve compared to SpaceX whose executives and engineers have the freedom to make much riskier decisions
I'm not the best way to frame this is "first one to a single successful launch". Reliability matters when you're dealing with high-risk scenarios, so a better measure is "probability of a given launch being successful".
Lots of falcons failed, but you don't see anybody worried about their payload or crew on Falcon 9 these days.
N1 might have simply been before its time.
Our ex ante ability to estimate these probabilities is lacking. Especially when they’re coupled. And redundancy, instead of tighter tolerances, is often cheaper than the classic approach. These are proven lessons from SpaceX.
[0] https://upload.wikimedia.org/wikipedia/commons/b/b2/Survivor... :)
The Soviets proved that methodology works and SpaceX continues it to this day. I have a feeling most that follow SpaceX think they are trying a new revolutionary approach here.
If the failure points are arranged in parallel - X OR Y OR Z must happen to have a successful outcome, with multiple redundant paths to success, your total failure rate is the chance that ALL of X, Y, and Z fail. This is a much lower number than when they are in series.
To use concrete math - say that Starship has 33 raptor engines with a failure rate of 0.01%, 3 grid fins with a failure rate of 0.05%, and a fuel tank with a failure rate of 0.001%. If it's engineered so that all 33 raptor engines, all 3 grid fins, and the fuel tank all need to work for a successful launch, the success rate of the whole system = 0.9999^33 * 0.9995^3 * 0.99999 = 0.9952 = ~0.5% chance of failure. If it's engineered so that it can get to orbit on 28 out of the 33 raptor engines, 2 out of the 3 grid fins, and there is a double-hull to the fuel tank with a failure rate of 0.005%, then the chance of failure for each subsystem is 0.0001^5 = 10^-20, 0.0005^2 = 2.5 * 10^-7, and 0.00001 * 0.00005 = 5 * 10^-10, and when you multiply out those subsystem failure rates you get 1 - (1 - 10^-20) * (1 - 2.510^-7) * (1 - 510^-10) = 0.9999997495 = ~0.000025% chance of failure.
Moreover, lets look what happens if you take the multiply-redundant design above and then increase the chance of failure of each component 100x. Raptor engines are now 99% reliable, grid fins are now 95% reliable, and fuel tanks are now 99.9% reliable. The overall failure rate for each subsystem becomes 0.01^5 = 10^-10, 0.05^2 = 2.5 * 10^-3 and 0.001 * 0.005 = 0.000005. When you multiply out those subsystem failure rates you get 1 - (1 - 10^-10) * (1 - 2.510^-3) * (1 - 510^-6) = 0.00250498759 = ~0.2% chance of failure. The multiply-redundant system, even with component failure rates 100x higher, still has better reliability than the perfectly-engineered system where every component must perform exactly to spec.
This principle is used all the time in practical engineering. It's why Google builds server farms out of thousands of commodity PCs, hooked up in primary/replica clusters with replication and transparent failover. It's why ships have watertight compartments and double-hulls. It's why passenger jets have multiple engines, multiple hydraulic control systems, and multiple flight computers. Any engineer worth their salt is going to avoid SPOFs and assume that components will fail, then build redundancies into the design so that a partial failure does not endanger overall mission success.
It seems like a strawman to suggest that you would let failure probability increase by a factor of ten as the first step.
>but with thousands of failure points adding up you are now essentially doomed.
And it was an easy one to tear down.
>And you haven't saved anything. The cost of 0.001 components isn't fundamentally different than the 0.0001 components were.
There is no reason to believe that at all. Invert the question: if a system is 99.999% reliable, does that mean it should be free to make it more reliable? And why?
>It is either go or no go. Take CPU production. Intel spends billions at each of hundreds of fabrication step to push down miniscule error rates because any of a million errors can destroy a chip. There is no money to be saved by allowing any one process to become less than as perfect as it can possibly be.
This is completely wrong. Chip factories do produce chips with defects; those chips are sold for cheaper, since they still work, but not as fast. IIRC most of TSMC's modern processes are designed to sell the good chips at a high price and the bad ones cheaper.
Your authoritative tone doesn't make any sense when Falcon 9 exists and has been actively dominating the entire industry for half a decade.
Triple redundancy is not a thing in general aviation while, for some systems, it is in commercial. That's a risk vs cost calculation.
Semiconductor manufacturers do risk vs cost calculations through the entire development and manufacturing process. Source: I've worked in semiconductor, doing those calculations.
So SLS does a LOT of analysis and manages to find and rectify failure points prior to flight. They pay a lot in analysis and inflexible design to do this.
SpaceX does some analysis, but then flies to confirm the analysis early. That way they identify actual failure points and can use sensors to see how close they got to failure.
For instance today I'm sure they learnt a lot from each failed engine, parts on the booster that stopped working, detailed telemetry on ship behavior on flight and sensors for the non-separation of booster from ship.
SpaceX builds to the same high tolerances as other rocket manufacturers, but they don't try to avoid testing through overly rigorous analysis. They also don't gold-plate their manufacturing, instead making tradeoffs to allow cheaper volume production with recovery instead.
Sometimes in aerospace you need to collect data, and sometimes that means explosions.
[0] https://www.space.com/spacex-starship-first-space-launch#:~:....
exactly. optimizing for an acceptable risk for space launches, esp space travel, seems still to be leading to $2B launches. at which point, what's the difference?
https://austinkleon.com/2020/12/10/quantity-leads-to-quality...
[A] ceramics teacher announced on opening day that he was dividing the class into two groups. All those on the left side of the studio, he said, would be graded solely on the quantity of work they produced, all those on the right solely on its quality. His procedure was simple: on the final day of class he would bring in his bathroom scales and weigh the work of the “quantity” group: fifty pound of pots rated an “A”, forty pounds a “B”, and so on. Those being graded on “quality”, however, needed to produce only one pot — albeit a perfect one — to get an “A”. Well, came grading time and a curious fact emerged: the works of highest quality were all produced by the group being graded for quantity. It seems that while the “quantity” group was busily churning out piles of work – and learning from their mistakes — the “quality” group had sat theorizing about perfection, and in the end had little more to show for their efforts than grandiose theories and a pile of dead clay.
The counterpoint to it is the probably apocryphal Soviet nail factory (but with more verifiable examples nearby):
Once upon a time, there was a factory in the Soviet Union that made nails. Unfortunately, Moscow set quotas on their nail production, and they began working to meet the quotas as described, rather than doing anything useful. When they set quotas by quantity, they churned out hundreds of thousands of tiny, useless nails. When Moscow realized this was not useful and set a quota by weight instead, they started building big, heavy railroad spike-type nails that weighed a pound each.
https://skeptics.stackexchange.com/questions/22375/did-a-sov...
McD's never tried to build the best burger, they built one of the best supply chains in the world.
SpaceX doesn't have to build the best rocket, in whatever that means, it just needs not to blow up and allow its cargo to reach space.
If you build lots or burgers or lots of rockets its highly likely you'll reach and pass 'good enough'.
Yes, but let's not take the analogy too far. For people who work in safety-critical design (including software), it takes a different mindset than what is often prevalent in silicon valley. When the stakes are high, you don't really want to "move fast and break things".
You can actually see this in SpaceX. In development when stakes are relatively low (e.g., no payload or passengers), the risk threshold is high. But they start taking a more measured approach when that risk starts to ratchet up. The danger being, advocates of one approach don't always know when/how to transition to the other.
The knee jerk mindset that most people have in safety-critical design, is being ultra conservative.
In the fields of medical and space (and likely others), you have an asymmetrical risk-reward profile. Think about it this way, if an engineer takes a risk on refactoring some software logic, and it speeds the system up 3%, what is their reward? A raise? A promotion? Fat chance. If that refactor instead breaks 3% of the time; engines blow up, people die, customers yell at them, they get fired, perhaps in some situations they even get sued.
The engineers then converge to a local maxima by the means of: "If it ain't broke, don't fix it", and various other ultra conservative leanings. This mindset also will often get selected for in hiring, and rewarded.
Now take the limit of this as time goes to infinity, you have bloated, legacy software that is full of spaghetti code and can't take new features easily (if at all). In the case of NASA's space shuttle program, it was extremely expensive, and the cost wasn't falling significantly over time either.
One might view ultra conservatism as the problem, but the real issue is the asymmetrical risk-reward profile. Solving that takes a head-on approach with great leadership, deploying capital, state of the art testing/QA, great deployment pipelines, and more. Shield people from the risk, and intentionally reward people when they push the envelope.
Imagine if you had a software testing process and product specification that was 99.9999% effective (and no, yours is not even close to that), you could then move at a silicon valley "fail fast" pace and advance the technology and architecture rapidly.
This corroborates "fail fast". They achieve reliability and safety by launching far more than traditional space companies and seeing failure in those launches. They prove it out before adding the risk of human lives or expensive cargo. Meanwhile traditional companies will develop their rocket for 15 years till it's "perfect". SpaceX figured out that achieving perfection is best done through actual attempts, not laboratory experiments.
But it also shows "fail slow" later. My point is that "fail fast" is not some hard rule to abide by, but contextually dependent on the risk at stake.
Take their example of a failed F9 strut, where the material supplied by a vendor didn't come close to meeting the necessary specs. A mature aersopace company would have processes in place to check the material for these specs before use. SpaceX has since levied these new process checks, but prior to that failure lots people may have pointed to them as being more efficient because of their 'streamlined' process.
Would a "mature aerospace company" also know to not use O-rings outside the temperature range specified by its engineers? Or know to test whether foam traveling at high velocity would penetrate the TPS?
Look, this is hard stuff. It's very easy to tell when you screw up, but very difficult to tell how close you are to screwing up. You're deluding yourself if you think some entities are immune to screwing up just because they've been around.
Put another way, what would global exploration have looked like if sailors refused to accept the risks of early ocean crossings?
What you don't want is a culture that is either a) afraid to take any risk because they are afraid of career consequences or b) willing to roll the dice with bad decision processes due to biases and bad incentives.
Example for a): bureaucrats who are unwilling to push the envelope because a bad outcome would effectively end their career
Example for b): making high-risk decisions due cost/schedule pressure, like competition for a contract
There is no consummate economic incentive for being an astronaut. The incentive is the experience and making some impact on science, and while that motivates many people the probability of attracting the best and the brightest goes down as the probability of exploding goes up.
I'd say there's unlikely to be enough of an economic incentive to justify riskier manned space travel until the earth becomes a whole lot less habitable.
People volunteer for the military, and I don't think anyone's under any illusion this is risk free. The important thing is not lying to people about the risk involved.
For the real launch they've already mapped out the failure modes and are able to prevent them when it really matters.
One small BS detector is when there's some unplanned/unmitigated test outcome that gets characterized as a "test anomaly" rather than being transparent about the details.
>they've already mapped out the failure modes and are able to prevent them when it really matters
This remains to be seen. The shuttle also had all their failure modes mapped out. As did CST-100. Yet massive failures still occurred.
These sorts of statements are infuriating. You're dropping all of the context of past achievements (budget, political will, design goals, need, etc) and then castigating modern engineers.
The SR-71, X-15, and Saturn V achieved their design goals. There's no modern need to go back and re-achieve those goals.
The SR-71 is an amazing plane. When it was originally built there was a need for a reconnaissance plane that could fly high enough and fast enough to evade Soviet high altitude air defense systems. In the intervening years reconnaissance satellites have obviated that need. Outside of a few other tasks there's not much need for a Mach 3+ manned aircraft. Even for the tasks where one is useful the SR-71 still exists. That's not to say a replacement couldn't be built today. In fact many believe one exists in the form of the rumored Aurora.
It's just ridiculous to make assertions about "no one" being able to accomplish those projects today. If NASA or the DOD put out an RFP and had a budget for a modern X-15 it could definitely be built.
What would be a failure is if the next one has the same problem.
That seems like such a low bar? One wonders if the engineers/management at SpaceX cringed when he said that.
StarShip is so huge and the reuse will be so cheap that it's going to be 100x or more cheaper. We could send heavy equipment into space and on to other planets that just didn't make sense before.
Once Starship can land 100 tons on the moon, the question isn't "what can we fit" but "how do we fill all this capacity usefully?!" So the science objectives we can achieve grow enormously.
Also, yes: larger space telescopes. And eventually,manned missions to Mars.
Edit: What would an unsuccessful test look like then?
Quote is towards the end, but the whole vid is worth a watch.
http://heroicrelics.org/info/all-up/all-up-flight-testing.ht...
The main goal here was to clear the pad and get some atmospheric experience with the entire stack. Goal met. But of course they had contingency plans to get as much more experience with it as possible, if things continued to function nominally (as they have with some rovers, or indeed some previous first SpaceX test flights, like the Falcon Heavy).
SpaceX said their goal was to get off the launch pad going into this, which indeed may have been setting a low bar for success. However, there is no other alternative definition.
If you are tasked with recording X, and anything else beyond is bonus, doing X is success.
Btw this isn’t moving the goalposts. Clearing the launch tower was always the success criterion; the rest is gravy.
I think this could have been more successful
sidibe: “I think this could have been more successful”
:)
edit: Never mind, it's slightly less – see the comment below correcting me. The SLS program has 40, not 34, RS-25's.
https://en.wikipedia.org/wiki/RS-25#Space_Shuttle_program ("contract extension to manufacture 18 additional RS-25 engines, with associated services, for $1.79 billion")
And that doesn't count the 2nd stage which, for 10 flights, should be 3 * 1 + 7 * 4 = 31 RL-10s.
But yeah - a very different architecture.
NASA is about making doing right the first time though careful design.
For SpaceX approach to work, they need to test a lot, with a lot of explosions, so they need to make a lot of rockets, they also need repeatability. That's why they are using assembly lines and mass production techniques.
Which approach is the best, I don't know. The traditionally designed Delta IV never failed, but on the other hand, we lost two Space Shuttles and their crews. As for the Falcon 9, it had a couple of failed missions, but it has proven very reliable over time.
> Unusually, the ejection system was tested with live bears and chimpanzees; it was qualified for use during 1963 and a bear became the first living being to survive a supersonic ejection.
There is a section about Space Shuttle's crew bailout at https://en.wikipedia.org/wiki/Space_Shuttle_abort_modes
Before the "Ejection escape systems" there are a few paragraphs about "inflight crew escape system"
> The vehicle was put in a stable glide on autopilot, the hatch was blown, and the crew slid out a pole to clear the orbiter's left wing. They would then parachute to earth or the sea
But 100 people is a different matter IMHO.
Ejections seats and capsule were not pursued, the Wikipedia page explains the reasons.
Airliners don't have an in-flight escape system, anyways.
I would think weight of fuel required to land booster + legs + steering fins would be much greater than a parachute or two and a water landing. That weight savings would be a cost savings as well as more payload that could be lifted (also a cost savings).
Would the booster be destroyed landing in the ocean by parachute?
> On the other hand, the SLS — having a launch escape system and not requiring sophisticated acrobatics
> in order to reach land safely — is totally the ship I'd rather be on.
Have you ever flown on a Boeing 747, without a launch escape system?That said, I do agree about the flip maneuver. I am very interested to see how that evolves.
The booster presumably like you will have been thrown into the ocean. Very wasteful system.
From https://en.wikipedia.org/wiki/Space_Shuttle_abort_modes#Tran...
"Preparations of TAL sites took four to five days and began one week before launch, with the majority of personnel from NASA, the Department of Defense and contractors arriving 48 hours before launch. Additionally, two C-130 aircraft from the space flight support office from the adjacent Patrick Space Force Base (then known as Patrick Air Force Base) would deliver eight crew members, nine pararescuers, two flight surgeons, a nurse and medical technician, and 2,500 pounds (1,100 kg) of medical equipment to Zaragoza, Istres, or both. One or more C-21S or C-12S aircraft would also be deployed to provide weather reconnaissance in the event of an abort with a TALCOM, or astronaut flight controller aboard for communications with the shuttle pilot and commander."
Where in the past, people would be like "OH NO!!" -- but the crew knew how much data they got out of that launch.
I wonder how stripped down the starship was though in an effort to save costs in the event such as this RUD.
I would love a piece of the shrapnel from the exploded device though...
Hopefully they get those pieces and auction them off.
I would be very surprised if Shotwell didn't have an all-hands to set the whole team's expectations beforehand.
I've have my own version of this more times than I can count.
For me, I run a trading firm and when I started it was "if we can survive the day without losing a ton of money, its a win." I was happy if the positions even made it to the exchange the way we wanted, haha.
It would be AWESOME if elon included actual fireworks which would go off in the event of a RUD to add some fabulousness to such events.
In fact, all the devices that are stripped out for these test launches should be replaced with their equivalent weights in fireworks. Detonate them when possible during a RUD to allow for more spectacle!
There's something called FTS. Said fireworks were responsible for todays RUD... ;-)
You’d think NASA would have read their own studies and given up rather than proceed on the predictable Artemis boondoggle.
I expect their math was something like:
95% chance of enough engines lighting to launch 90% chance of clearing launch pad 60% chance of making 60 seconds of flight 30% chance of 2nd stage separation 15% chance of re-entry
The initial launches are gone be more like 5 billion. Its pure fantasy that it will go to $2 billion anytime soon.
That is not always a bad thing. I mean you typed this on a computer running an ISA that started in the 70's or 80's. Maybe 90's if you are on PowerPC ;)
Today's rocket was a byproduct of what they're actually working on, so it's hard to pin a price on it. I'd guess a few million dollars in engines, and a few hundred thousand in steel? This is all stuff they would've needed to find a way to dispose of anyway; the next booster in line (B9) already has hundreds of improvements. Among these are improvements to thrust vector control and engine shielding, both of which were involved in the issues with today's flight.
NASA has to do everything in the public eye and their process reflects this. Private enterprise is allowed to hide information, which implies they are allowed to massage information.
(... this probably says unfortunate things about the nature of governance by public sentiment that it's best not to think about over-much if one is super-fond of democracies as engines of progress...)
With that, they developed Falcon 1, Merlin engines, Falcon 9, Falcon Heavy, first full-flow staged combustion engine in the methalox Raptor engine, Starship, Starship Heavy, Dragon, Crew Dragon, Re-usability, Starlink satellite manufacturing and 4,000 satellites launched to orbit, and quite a bit more.
The SLS has spent 23.8 billion in nominal dollars so far. SpaceX has received about 9.8 Billion total investment, which puts an upper limit on operating losses.
That would be a good point if we were talking about NASA vs Blue Origin. But SpaceX is arguably building more in the open than NASA.
If you hang the entire R&D plus materials cost for Starship on this one launch, it's a huge amount.
If you consider this as R&D that will be amortized over decades of launches, not that much.
It's the same math that gets you the military buying $5000 hammers: it all depends how you allocate fixed costs across units.
I'm sure they're not just dumping 2.9B in Elon's bank account (I mean... if they did he would just buy back all the Tesla stock) but there are a series of milestones that need to be met for the government to release the next chunk of funds. I don't know if NASA published the exact milestones, but maybe "not exploding on the launch-pad" was enough to release the next block of funds.
https://www.businessinsider.com/elon-musk-spacex-starship-ro...
By comparison, Falcon Heavy costs about $62M per launch, but Gwynne Shotwell predicted they can shave 40% off that price tag when they start re-using heavies.
https://spacedotbiz.substack.com/p/is-starship-really-going-...
But Elon has supposedly said the TDC (total development cost) of the Starship is projected to be 2-10 billion. [I found this at the Daily Mail website, so take it with as large a grain of salt as you wish.]
https://www.dailymail.co.uk/sciencetech/article-11994755/Wha...
If it costs $10B to build one and $10M per launch and you get 10 launches per vehicle, that's $1.1B per launch if you amortize the development costs. But if it takes $2B to build one and $2M per launch and you get 10 launches, then it's only $220M per launch. But if you build five operational starships that each have 10 launches each, things start to get downright affordable.
So if the question is how much has SpaceX spent on the Starship to date? I don't know that's public info. If the question is how much will they spend on development, the answer is $2B-$10B (though that's from the Daily Mail.) If the question is how much will each launch cost (including amortizing development costs)? It could be as cheap as $42M. Or depending on how much of the $2.9B from NASA they're able to apply to previous development costs... who knows!? They could make $1.6M per launch as long as the GSA doesn't audit them too closely.
There's a myth in US government purchasing that competition drives costs down, and that's probably true for commodities. But Starship class super-heavy-launch vehicles aren't commodities. There's a TREMENDOUS amount of cost (both opportunity cost and dollars) associated with fiscal oversight of large projects. The hope has always been that when Blue Origin built something to compete, it would bring total costs down. I am skeptical.
The design targets 10$/kg to orbit.
> Musk has said the entire program will cost anywhere from $3 billion to $10 billion.
These can't both be true.
I can't personally attest to this but another commenter mentioned that this was what the soviets did as part of a space race with a smaller budget.
You should note that success rate is crucial once you are in production and ready to go - judging overall success against that bar while developing and testing is nonsense.
Finally - I think everyone learns faster by trying more things and making more mistakes? I wouldnt blame you for wanting to see that studied - kind of a neat question after all - but it seems like you are assuming one method or another was picked because it was superior as opposed to a reality of material constraints.
I feel like if NASA had budget for blowing up more rockets to prove/disprove points that they would be doing so. Actually now that I say it out loud I can't imagine anyone choosing 'not rocket'.