NASA is about making doing right the first time though careful design.
For SpaceX approach to work, they need to test a lot, with a lot of explosions, so they need to make a lot of rockets, they also need repeatability. That's why they are using assembly lines and mass production techniques.
Which approach is the best, I don't know. The traditionally designed Delta IV never failed, but on the other hand, we lost two Space Shuttles and their crews. As for the Falcon 9, it had a couple of failed missions, but it has proven very reliable over time.
> Unusually, the ejection system was tested with live bears and chimpanzees; it was qualified for use during 1963 and a bear became the first living being to survive a supersonic ejection.
There is a section about Space Shuttle's crew bailout at https://en.wikipedia.org/wiki/Space_Shuttle_abort_modes
Before the "Ejection escape systems" there are a few paragraphs about "inflight crew escape system"
> The vehicle was put in a stable glide on autopilot, the hatch was blown, and the crew slid out a pole to clear the orbiter's left wing. They would then parachute to earth or the sea
But 100 people is a different matter IMHO.
Ejections seats and capsule were not pursued, the Wikipedia page explains the reasons.
I would think weight of fuel required to land booster + legs + steering fins would be much greater than a parachute or two and a water landing. That weight savings would be a cost savings as well as more payload that could be lifted (also a cost savings).
Would the booster be destroyed landing in the ocean by parachute?
> On the other hand, the SLS — having a launch escape system and not requiring sophisticated acrobatics
> in order to reach land safely — is totally the ship I'd rather be on.
Have you ever flown on a Boeing 747, without a launch escape system?That said, I do agree about the flip maneuver. I am very interested to see how that evolves.
The booster presumably like you will have been thrown into the ocean. Very wasteful system.
From https://en.wikipedia.org/wiki/Space_Shuttle_abort_modes#Tran...
"Preparations of TAL sites took four to five days and began one week before launch, with the majority of personnel from NASA, the Department of Defense and contractors arriving 48 hours before launch. Additionally, two C-130 aircraft from the space flight support office from the adjacent Patrick Space Force Base (then known as Patrick Air Force Base) would deliver eight crew members, nine pararescuers, two flight surgeons, a nurse and medical technician, and 2,500 pounds (1,100 kg) of medical equipment to Zaragoza, Istres, or both. One or more C-21S or C-12S aircraft would also be deployed to provide weather reconnaissance in the event of an abort with a TALCOM, or astronaut flight controller aboard for communications with the shuttle pilot and commander."
If you look through all the failures and close calls in aerospace they are often rooted in human psychological errors. The pressures that lead to them may change with different organizations, but they don't go away.