370 points · by thunderbong · 3y ago · 324 comments
Every team that I've worked on that has switched from Scrum to Kanban saw an immediate improvement in speed that never disappeared.
Once, just once, I was lucky enough to work on a team that switched from Kanban to Scrum, and then, mercifully, blissfully, back again. To be fair, I think we actually worked quicker after the return, though I don't know if that could be attributed to having actually learned some lessons from Scrum, or out of a fear that we'd one day return to it.
The sad truth is that most management teams would prefer their employees to be predictable and observable (ie, under control) than be efficient. Especially if nobody can actually quantitatively measure the loss of efficiency.
Velocity metrics, burndown charts, point estimations, and all of that have been at best aspirational white lies and at worst outright falsehoods on almost every scrum/agile team I've ever worked on in the past fifteen years.
In actuality many scrum teams are doing something closer to kanban day-to-day under the fake veneer of scrum/agile sprints on top to satisfy management and/or external parties.
-"It is impossible to do accurate estimates"
-"You will get better at it"
I wonder if the Scrum Master knew that in the end "get better" is "starting to cheat".
Do anyone else share this experience?
Agree with everything _expect_ retros.
I think the value of the retros is proportional to how senior the team is and to how seasoned managers are. But for me retros are extremely high value _if_ you have:
- Teams that can look at problems head on and be civil addressing things without making it personal.
- Managers that have a 'clear roadblocks' mindset and have a service-providing mindset towards the team.
In this scenario you can really have high value retros, with continuous adjustments to workflow, processes, design, without continuously repeating the same mistakes or falling in the same pitfalls.
Also, after an initial stabilisation period, teams need fewer and fewer changes. Talking about it every sprint gets really pointless and takes time away from the things they're good at and they're motivated to do.
I also worked on a team with terrible retros. The "good" column would always be extremely long and was only full of platitudes, nothing of actual substance that was brought forward into the next week. If anything difficult came up, someone would say, "Ok, let's book a meeting to talk about this later". It was an extreme misunderstanding of the value of retros. Though everyone else seemed to enjoy them so that's arguably valuable? I dunno.
Anyway, yes, lots has been said on this topic in the past. SCRUM is just Agile for stakeholders. There is the whole "SCRUM But" joke but I actually think a bunch of things in SCRUM are valuable BUT if something isn't working out, don't do it! I get the impression that lots of companies just do all the rituals "because SCRUM" and don't actually understand why they are doing them. Case in point, I was at a company that would always spend time story-pointing but no one ever looked at them. Not the teams and not the stakeholders.
So even though the current company is using scrum, in my team I treat it as kanban with story point limited, meaning I start with a certain amount of story points, then add / remove as the sprint is going.
If you ask me, that level of predictability is a poor tradeoff, but hey, it's the same kind of organization that decides that SAFe scrum is a serious methodology.
Software development is incredibly opaque by default (heck, even we don't know how far along we are, most of the time) so anything that improves that will be perceived as improved productivity.
But even if it's not, sometimes progress reporting (however rough) is needed to synchronise with other parts of the organisation. It just needs to be put into a form that is useful (e.g. for agile projects "percent of plan delivered" is not a useful metric) and how it's going to be used should be explained to those producing it. Heck, optimal is if the people making software and the people they need to coordinate with can get together and jointly agree on what type of reporting is actually meaningful for both parties.
Almost always, we're discussing vanity metrics though.
But I do agree with the post - Kanban is way way better and you can include the scrum continuous improvement elements as well on a regular cycle.
You've already pointed out that this is basically unheard of but I'm struggling to think of situations where scrum metrics have provided benefits that outweighed the cost of taking, and exposing them.
My experience has been that most development teams intuitively recognise problems that might be revealed by these metrics. Is this not often the case?
Yet ironically they care and tout about their ability to measuring efficiency.
An easy way to boost efficiency: hide inefficiency out from view!
we're in this exact phase - sacrificing efficiency, team morale and independence to make the boards look cleaner to "raise the bar" per se.
We're a small efficient team in a massive org. Manager does a great job of not making stupid decisions, values people's time and is clear about the metrics the team gets evaluated on.
somewhere along the way he's, missed the reality that clean user stories and tasks, complete with points down to hours and acceptance criteria can still be completely f$#king wrong compared to the actual work that needs to be done. Not because the people are idiots but because thats how most software work is. You find out when you actually start working on it.
But if you mandate that you need a well cut plan before code gets written, you mostly get well written $hit.
We just embarked on this journey which I can mostly predict the outcome of.
sad, true.
A metric compresses a very rich and nuanced opportunity into a false dichotomy.
The higher ups do it to follow the process and not to fix the actual problems.
It gets tiring after a while of time wasting.
First few times it works as a psychohygiene, but then it just becomes annoying. So teams stops talking about actual deep issues on those meetings and they are are creating an illusion of happiness.
In Scrum, estimation meetings usually result in follow-ups with stakeholders that can (and often do) radically change the stories themselves. Totally different code winds up getting delivered that increases actual value delivered, even if "lines of code written" slows.
That's the whole point of agile, to deliver value rather than code.
1. Does the team have the right people, with the right skill sets, wearing the right hats? (e.g. BAs or PMs doing those actual jobs)
2. Does the team have self-motivated, high-performance people?
I have yet to see any process that can overcome "No and no."
Large tech org's knee-jerk response to failures is to increase the formalism of their agile frameworks, but that's just a bandaid over gangrene.
If they think the solution to bad people is more process, they've already lost.
- If you have unpredictably changing requirements, and a small-ish non-life-critical product to build, and a large fraction of good people on the team, you should use an agile process.
- If you have unchanging or predictably changing requirements, and a large fraction of not-so good people on the team, you should use a plan-driven process.
But what if you have unpredictably changing requirements and a large fraction of not-so good people on the team? No process can save you now.
So those skilled and motivated people are estimating piecemeal tickets, too micromanaged to be able to fix actual issues they clearly see around them. It is forced helplessness You can't overcome bad process and scrum is a bad process.
Scrum advocates always end up blaming the people on team. Even if that exact same team was performant and scrum literally killed 70% of what was good in it.
> I have never seen feedback from estimation to requirements.
Perhaps you work with perfect pms! jokes aside, usually all it takes is an estimation of 8 or 13 and something changes real fast.
I know, I know, it's just a label applied to the cycle time of the process but labels matter and I think it subtly and subconsciously poisons the whole thing. Especially when managers and PMs start making sprint cycles into hard deadlines.
One of the tipoffs that you are working under fake agile not real agile. I have the same problem with using the word "sprint" as well, but I think the true issue is that most orgs claim to be "agile" when they are actually doing some variety of waterfall with agile verbiage thrown in. The best test for fake agile is if you can't cancel the daily standup, even for a couple of days, via the retro.
However, Scrum doesn't make much sense if you don't continuously iterate. Another symptom of this is people measuring velocity instead of value created. To properly implement Scrum, you actually need to measure the impact of the work completed in the past two weeks. Unfortunately, most teams don't do this, instead they focus on measuring velocity since it's easier and within their control. It's worth noting that it's completely fine for teams not to constantly iterate and change direction (including high-performing teams), and in those cases, Scrum simply isn't the best tool for the job imo.
I must admit that I personally prefer Kanban for almost all workloads.
This has been my experience. I've seen more than once management teams happier with numbers and estimates that weren't met than actually getting software out quicker at an unanticipated rate.
They'd rather have estimates that they could yell about than revenue generating software through (presumably) happy customers. <shrug>
Software estimation, similarly, is fractal in nature - you can always drill down deeper to measure but it gets increasingly complex and at some point you have to ask, is it worth it being "accurate"? Or do we just do it? Org charts require the former while developers desire the latter.
Unless you wanted to say that the same is true for software estimation, e.g. due to the measurements taking up more and more time.
Alignment is so important, and it's rare that I've found a team not using scrum which is working harmoniously. In reality, some members of the team aren't pulling their weight and it's causing animosity. Or they're working at odds and not communicating the pieces they're developing. A huge one for me is stakeholder alignment. Without scrum it's awfully common for developers to build things the stakeholder doesn't want. Scrum forces regular check-in and demonstration which otherwise rarely happens organically.
A big part of scrum is accountability. As I touched on, when people aren't pulling their weight, it hurts everyone. Unfortunately developers are rarely extroverts, and they often don't have the skills or desire to have tough conversations with each other. Sometimes it's just agreeing on what they find acceptable behaviour and work. Sometimes it's adapting to different ways of work, or neurological issues with a team member. You might be surprised to learn that a lot of developers are on the spectrum. Scrum forces these conversations to the fore and provides a tested framework for conflict resolution.
We also gain transparency. This is really important so that all the other supporting business functions can operate. Sales can communicate with customers about important updates and new features. Marketing can plan campaigns. Support can prepare. Finance can ensure adequate budget for new infrastructure and FTEs. Sure it's annoying, but this planning is essential for a business. It just doesn't happen organically. Scrum forces developers to work to some kind of schedule, offering short-term (but flexible) estimates on what can be delivered, when.
In a perfect world, none of this is a problem, and all of it happens organically. I've just never seen that happen. The sacrifice in velocity is worth the increase in value output to the stakeholders.
That’s not how it works. It’s as though developers are dumb and can only execute if you tell them to do exactly as needed. Rather where’s the leadership and direction? Perhaps that’s not clear or the developers don’t even agree with what’s going on. You statement is so 1-sided.
If someone is not performing you shouldn’t need scrum to work that out otherwise you have bigger problems.
I’d argue alignment is useless as most of the time developers are told to implement useless features. Perhaps with some guidance and direction what the developers come up with is better than product.
It’s sad but product is like a theory machine that’s often impractical.
So what would you prefer? Developers without scrum delivering in 4 months or with scrum and taking a year? Even if they do go off for a few months on their own it’s more than worth it.
The problems aren’t accountability or alignment. If people aren’t following a plan, that is if there is 1 then it’s a leadership problem.
> Rather where’s the leadership and direction?
We're right here, implementing scrum for the reasons I listed.
> If someone is not performing you shouldn’t need scrum to work that out otherwise you have bigger problems.
I have found that poor performance is often not because an employee is "bad." It's because the team dynamic is not working. Maybe their skills are poorly utilised. Maybe the team isn't make accommodations for their neurodivergence. Maybe they don't understand how to integrate well into the team. Maybe they don't feel confident to bother the senior devs, and maybe the senior devs have told them to fuck off. I've seen all of this and more.
> I’d argue alignment is useless as most of the time developers are told to implement useless features.
Sure, there's no point in any of the work you do if you're being told to develop things that no one wants. My baseline assumption here is that the business has need of your work. If it doesn't, you should brush up no your CV.
> So what would you prefer? Developers without scrum delivering in 4 months or with scrum and taking a year?
If the four months gives me something no one wants, I'll take the year.
> The problems aren’t accountability or alignment. If people aren’t following a plan, that is if there is 1 then it’s a leadership problem.
That's the whole discussion: how best to follow the plan. I don't think it's as easy as criticising developers for "not following the plan" if we don't provide a strong foundation in which to do so. Cue scrum.
> Unfortunately developers are rarely extroverts, and they often don't have the skills or desire to have tough conversations with each other.
I mean, what are you exactly talking about here? Because developers do criticize each other all the time, both in code review and outside of it. If they have trust, they talk plenty. If you do not see developers communicating, it is because of how you lead a process.
> Sometimes it's adapting to different ways of work, or neurological issues with a team member
Scrum is so inflexible, that it literally prevents accommodations for issues like this. And that is not even speaking about the fact literally this should be job of people management. This is literally what leaderships should do, because they have actual power to change the things.
It's not just communication which is needed. It's effective communication. For example, criticism without structure and consideration comes across as unkind and destructive. This is the piece which I rarely see working well without a framework. It doesn't have to be scrum. I just see scrum solving this and many other problems really well.
> Scrum is so inflexible, that it literally prevents accommodations for issues like this. And that is not even speaking about the fact literally this should be job of people management. This is literally what leaderships should do, because they have actual power to change the things.
Scrum doesn't have to be inflexible. It should be tailored to the needs of the team. The catch is that changes should be agreed by all, rather than one member going rogue. "Rockstars" hate scrum.
As for the "job of people management," if you're punting the responsibility of collaborative team dynamic to your leaders, be prepared for them to lead you. With scrum.
Of course, the counter to that is that we're not doing scrum right. The question in my mind then is if I haven't seen a single team do Scrum correctly there's something wrong that makes the methodology so difficult it can't be applied ...
I'm surprised at the conclusion because this statement can be said of any framework. It's up to the people to actually make it accountable. Doesn't matter if it's Scrum/Kanban or another one. If your org treats accountability as "an illusion" then it's doomed to fail regardless.
> The question in my mind then is if I haven't seen a single team do Scrum correctly there's something wrong that makes the methodology so difficult it can't be applied ...
This I 100% agree with. I've come to look at these frameworks (kanban, scrum etc) as I look at the Bible... no church gets it right and never will. It's not possible.
That’s almost always the excuse in my experience. It’s not that it doesn’t work, it’s just no one has ever done it correctly.
I cannot for the life of me work in the churn and development pace of a Scrum team, so Kanban (and the culture around it) is best fit for me.
I think it also depends upon the type and culture of people working in the team as well. Some teams work really, really well with the predictable cadence, others do not.
It's a case by case kind of situation, I think.
That said I highly prefer Kanban personally for an number of reasons.
We now have long sprints (~1 months) for reviews and retrospectives. Which are usually well received. You get to see what all the other teams have been doing, and you also get a formal chance to talk about any problems.
Timeboxing is about committing only a small amount of time and money at a time, so you can choose to double down on winners and stop investing in losers, rather than suddenly finding yourself having sunk 3 months of time into something that turns out wasn't that good after all.
The question is not "How much can we definitely complete in two weeks?"; it's "What things are promising enough that we are willing to dump two weeks into them, with no promise of ever making a profit?"
If one month counts as a small amount of time and money for your organisation, then you're doing it right!
Lots of stuff pushes organizations in the direction of doing 80% of 10 separate projects, and it's a killer. This is good reading in this domain: https://apenwarr.ca/log/20171213
I can actually see predictability improving, but mostly because we will ship whatever at the end of the sprint and let any issues come back as bugs later. We always ship on time at one Scrum job, but the quality is very low.
As an engineer on a team using scrum, this is my favorite part.
Scrum specifies fixed time and quality ("definition of done"), with scope as the flexible variable, as tasks get pushed out of each sprint.
Kanban specifies fixed scope and quality, letting time be the floating factor for each task.
Waterfall specifies fixed time and scope, with the inevitable result that quality has to give way.
There are some applications that Scrum does fit better than Kanban, notably anything tied to a real world calendar, say a scheduled live event or a school year or holiday or other seasonal concern. But yes, most businesses don't need to be time-boxed with Scrum anywhere near as much as they think they do, particularly given how much of that time is always consumed by organizational friction around the time-boxing negotiations.
(What happens if you do try to constrain and specify all three? We call that a death march. Actually, time invisibly flexes as workers cram in effort at a higher pace, until they burn out and then you're back to quality implicitly or time explicitly giving way unless you reduce scope.)
Not really. I’ve worked on waterfall projects and they generally produced much much better quality than any scrum team I’ve been on ever. The dirty little secret is it’s faster too but if you have incompetent management/engineers the risk of not shipping anything at all goes up dramatically
My experience with small-scale waterfall is one of getting essentially a spreadsheet of requirements, implementing to spec, fixing a small number of bugs during QA, and then going into production on time and with exceptional quality.
There's a project I did that went from zero lines of code to production in two months, that had literally bugs discovered in a decade of operation. Made entirely possible through waterfall-style development. If you know exactly what to build, development goes fast. There is not a chance in the world that would have happened if we'd been discovering new requirements along the way.
That said, it also puts a lot more demand on well thought out requirements. The people who put together the specs were world class, smart, professional and solid engineers. Extremely particular where it mattered yet with very little bike shedding.
My experience is that developing against fixed requirements is fast and produces exceptionally high quality code. So many bugs and so much technical debt is from having to rewrite the same thing over and over because the requirements aren't set when development starts.
I think that's why Agile was invented: for situations where requirements are not fixed. If you have fixed requirements, I don't see why you'd need Agile development in the first place, though some parts of it might be useful for just keeping everyone on track.
In a recent job, we used Scrum and it generally worked well, but we didn't have the luxury of fixed requirements. The customer needed new features on a regular basis (features which they could not have foreseen the need for beforehand), and we'd regularly give them deliveries of the version of the product we had, which they'd immediately put into use. A waterfall model would never have worked there.
As you say, it demands really good requirements, which can only come from high-quality customers. Most customers are not high quality. They are low quality. They are bad. They don't know what they want and don't know how to express themselves. As you suggest, a really good requirements person can tease these details out of them, but in my experience a great many companies don't even realise how bad and incompetent a lot of their own customers are.
This is WILDLY different to my experiences. Waterfall projects always drag out months and even years past their expected delivery. The requirements documents become bloated wish lists. Prioritisation is impossible because no one will accept cutting even the really fluffy stuff. Waterfall requires dedicated project managers who spend their whole day arguing with everyone. I admit that the quality is often higher, but that should be expected when it takes three times longer to deliver. Scrum/Agile forces teams to focus on the core value proposition, and not all the nice-to-haves. You believe this is only an issue with incompetent management, but if so, I've never seen what you consider to be competent management.
I think the better solution here is not to buy into any framework as though it's a religion. Waterfall dominated projects for decades, and it has lots of issues. Agile is dominating current ways of work, and it has lots of issues. We should be using the right tool for the job, and even then, only the parts which make sense for our product and team and culture.
Now where have I heard that before? Ahh yes, at this little website: https://agilemanifesto.org/
My pet hate is that Scrum has somehow been dubbed as Agile, when a rigid system of meetings and planning techniques is the antithesis of agile development, which was conceived of to push back on exactly that.
Think of it as time constrained Kanban with semi-fixed scope. The dropped tickets may carry over to a later release (if there is one), or just die forever (make it easy to cull bullshit).
P.S. From this perspective, the first thing to die is the time wasting sprint rituals that Scrum layers on top of Kanban.
This is kanban ... just culminating in a release event anything from weeks to months in the future (driven by time factors independent of dev management i.e. actually having to produce something as a business). I mean nobody can seriously be proposing no time bound on kanban (please clear the board this decade?)
If you're behind schedule pausing for a ridiculous high school level show and tell will only delay you more ... and if you're ahead of schedule, just keep doing what you're doing right.
What kanban provides is visibility, how much you're getting done. Scrum sacrifices momentum for theatre.
https://www.projectmanager.com/blog/triple-constraint-projec...
However games are iterative by several orders of magnitude more than traditional tech (I've also been CTO at a more traditional design/consulting firm) and constantly evolving and audio team, both internal or external, end up tightly embedded over the course of 2-3 year long projects, and Kanban ALWAYS breaks down because the edges of tasks are fuzzier than you expect.
Scrum (real scrum, not the surface level dogmatism that passes for it in many places) does work better in this situation. I find myself saying this often "The best tool is the simplest one that does what you need it to". I really do prefer Kanban! It's far simpler. For projects that have clear needs and stakeholders it's great. For "factory" type set ups that provide tools to other internal stakeholders it also works great. But for places where the technical requirements are fuzzy the added complexity of Scrum is helpful, since it focuses on OUTCOMES rather than MEANS/tasks.
Don't be afraid to try different approaches for different sprints/releases and tweak formulas. You can normalize estimation by keeping it consistent while also changing methodologies. But just because Scrum is overused and misunderstood doesn't mean it's useless.
edit I sometimes find myself in the position of apologist for Scrum, which is weird because I'm not that crazy about it, I'd almost always prefer to use something less heavyweight. But people are so quick to throw out the baby with the bathwater - there are a lot of great concepts in scrum, and it's quite interesting to see how all the parts interact when it's actually working.
Just putting outcomes as cards on a kanban board will not have that same effect in all instances, as it's more about the soft points of engagement and teamwork driving towards that common goal.
I’m starting to realize that most people don’t know how customizable Kanban is. You can put as many columns and swimlanes as you want, and then implement constraints in the system with rules around how cards move on the board.
Doing reports I find people care less about the day-to-day work and more about when it gets done, and this is where scrum in theory works well but breaks down in reality. In practice is estimation works when team members are kept consistent, because over time you can track historically "t-shirt size" complexity of task as estimated by the team translates to "x number of man-hours". However in game design we get a lot of major team shakeups pretty regularly with teams changing across different milestones. It's hard to fight against the instinct of "Oh this thing needs our a-team players for this release"
A lot of the arguments being made are really difficult to generalize and say "this works for every org!". One example:
> When that happens, instead of designing features by committee, which demands a significant amount of back-and-forth discussions, decisions happen locally, and thus are easier to make.
This works really well when the engineers themselves have all the knowledge+ability to tackle the problem. Smaller startups are perfect! and teams that are pure technical. But once a key portion of the requirements lives outside the team, this is no longer effective because then you're building without that feedback.
The danger is trying to measure things purely on developer velocity. I'm not saying kanban is wrong or scrum is wrong, just do what's best for your org by building what's important to your business.
This reminds me of a similar situation almost a decade ago where someone watched a talk on how GitHub uses GitHub to build GitHub. The people who watched the talk all tried to convince me that we should adopt similar process that puts less emphasis on PMs. However, this worked for GitHub because their engineers had such a strong similarity to their customer base. For us that wasn't the case at all and we typically needed PMs to have lots of customer conversations and explain to us how customers used our product because we were building Enterprise software for people whose day-to-day we didn't understand easily.
But how does Scrum help out here?
Kanban doesn't prescribe any stakeholder methodology. It's not that it's not important, it's just up to the organization.
This is definitely a point of contention in Scrum because "oh this is so slow", "there are too many stakeholders", "why do we have to do it this way".
I'm at the belief - some way is better than no way. If you don't like Scrum, cool! Go build your own, but if you don't mind it, Scrum is good-enough^tm.
Only if all tasks are of equal priority, which is rare. Otherwise you need some (very basic) cost estimation in order to prioritize.
> Retrospective sessions are also fundamental for a team to continuously improve the way it works. The problem with these sessions in Scrum is that they either happen too early or late. Although it’s good for teams to discuss their practices and look for ways to improve them, it may not be necessary to hold a retrospective session if everything is going fantastically well. Conversely, it may be harmful to wait for two or more weeks to discuss systemic problems impacting the current pieces of work or the overall goal the team is working towards.
> In Kanban, there’s nothing preventing teams from scheduling regular meetings. Yet, teams have the flexibility to schedule meetings whenever they’re necessary.
But unfortunately this means they also have the flexibility to not hold a meeting when it's necessary.
I don't think this article is exactly wrong - Scrum is to a certain extent a crutch, just as any process is to a certain extent a crutch - but I think it overestimates the average manager/team. In my experience teams that pick Kanban over Scrum tend to have issues with stalled, overly-large, and poorly-prioritised tasks (e.g. an undesirable task can sit indefinitely in the "ready for work" column which is usually not what you want), too little process refinement (in particular, retrospectives end up being rare) and take too long to recognise issues.
Scrum is prescriptive and restrictive, but it's like that because it works. After all, if your team was perfect you wouldn't need Kanban either. Just do the right thing and don't do the wrong thing bro.
> They’re also unnecessary because if you feed the system with more work as soon as software comes out, estimations don’t matter.
The question is: estimations don't matter to who? As much as I'd like a constant stream of quality features to be good enough, in reality senior managers and clients want to know what they're getting for their money, and when they'll get it (at least roughly). If your software is doing something important, it's likely that people will be depending on it and when a new feature ships can have a significant impact on how they work, and in turn, what they can deliver.
IME most of the time they need to get over it. The reality is that estimating in that kind of detail would be expensive and not worth the effort.
However what they do reasonably need is the ability to prioritise feature A over feature B and they need a vague comparison of costs in order to do that (like, is feature B going to be 3x as much work as feature A?). Scrum provides that at minimum cost.
It’s akin to saying, “You don’t need yoga; just do twiddlebop right,” and never saying what twiddlebop is.
It’s also rife with meaningless declarations, like the one about “pushing decisions to the edge of the team.” WTF is that supposed to mean?
- the estimate is a joke...
- the standup is useful to know who is pretending work. but no need a daily standup for sure.
and a non-technical PM with scrum makes things worse.
With good project management you can make any process work, be it waterfall, scrum, kanban or others. All dysfunction comes from people perpetuating processes that don't work. That's what agile was about originally.
Agile is far worse than anything I experienced earlier. It was pushed as some sort of dogma where you are a cranky non-teamplayer person for arguing it is a bad idea. A counter-revolutionary blocking utopia.
Giving non-programmers insight into every small tasks is a big mistake.
I don't doubt that effective scrum management is theoretically possible, but based on personal experience and also by reading through the rest of this thread it seems that scrum is too difficult to do correctly for the vast majority of project managers.
fortunately, over time, no sub team continued the way, it has mutated back to the kanban style more or less...
Kanban is a back pressure mechanism that can get your factory logistics system running smoothly. However the logistics of creative work is very different than the logistics of assembly work. There are almost no parts needed, why is a backpressure system for part delivery even useful?
You got a list of shit that needs to get done. You have 5 people in the team.
On the Kanban board you can see how long each item has been in each column and you can see who's working on it.
You can also limit the amount of items each person can be working on simultaneously. It should be exactly one or you're multitasking, which isn't good for anything.
You have a single task you work on, when it's done you move it forward. If you get stuck you move it backward and comment on it why it's stuck and pick a new one.
See also "lean manufacturing/software development" and obviously "software engineering".
Someone is either working on a task, or idle. A task is either being worked on (making progress), or it's not being worked on. -- A task will get completed quicker if you can minimize the amount of time it's "in progress" but not being worked on.
If you have 5 workers and 15 tasks in progress, 10 of those tasks won't be making progress.
Often, a task may be blocked by requiring some action from someone else. (e.g. PR review, or more resources, or blocked on some other task).
The 'kanban board' is about visualizing work in progress. -- By visualising the work in progress, it's easier to identify bottlenecks & inefficiencies.
However, it's not so simple to read. In some cases tasks were blocked because of a superficial or nonexistent analysis, which required to get more information. Which is a clear break of the flow, since it has to be paused for the time before the meeting can happen. But sometimes, the analysis can be fairly bad and very time-consuming on the other department, making the broken flow more efficient than the flowy one if you account for the whole team and not only developer time.
Which seems to me that it's a good idea to optimize for flow only after you have enough consistency in the process, but still a powerful tool.
That being said, I would say that having a Kanban board without any sprint structure (or any attached micromeetings) would skyrocket my productivity. The two-week sprint thing is meaningless to me - in my org tickets overflow from one sprint to the next all the time, tickets get added mid-sprint, it's an utterly meaningless distinction.
Whatever the management benefit supposedly is, seems like it could be achieved with declaring current (not 'sprint'^) goals, and a filter for tickets done/progressed in a given date range?
(^Even the language is depressing: sprint, ticket, points, standup, sit down, keep moving, ...)
That's not Scrum then. You don't add stuff mid-sprint, that's the whole point. Unless the world is literally on fire, you don't touch the sprint content.
What's your scrum master doing when you get stuff added? It's their job to prevent it.
And if work overflows, you need to spend time grooming the tasks to manageable chunks and adjust the team velocity. You can always pick up more tasks if you run out of stuff to do.
The real solution is of course not to have any "sprints" at all. A manageable chunk of work is a 3 to 6 month project.
Non-tech enterprise treat software engineers as children and create bad software. FAANG and adjacent companies treat software engineers more as professionals and create better software.
There's really no point being that strict. I think two week meetings/sprints are good for keeping focus and as an opportunity to agree short term priorities. But the point is to get work done, not to precisely obey scrum rules.
A scrum master? Man, I thought my team was bloated with process but the fact that role exists elsewhere means I should probably be more grateful.
Some people might debate on how active a kanban board should be.
Metrics/Analytics can be calculated when your done based on actual information, as opposed to the beginning when you're guessing, and likely to be held to your estimates.
Kanban isn't there to dictate process, but as a tool to correctly and truthfully inspect your process.
E.g. we recently used length of UAT column to prove that we need more business people doing testing in next few weeks as we close to feature release and more tests take form of exploratory testing.
Scrum isn't blind to benefits of such inspections either! So doing simplified Kanban board is frequent.
In my previous job we used it and I liked it, but I haven't used Scrum before so I can't comment as to how effective it could be.
I don't see why that is necessarily the case. It certainly didn't happen on the Kanban teams I've led. Maintaining the backlog and reviewing the work in progress is just as important in Kanban as in any other process.
BUT it needs the exact same team to be together on the same codebase. You add or remove people, the velocity changes. You change projects, velocity changes.
People also need to be honest when estimating tasks, don't be a 10x cowboy and say something is a half-day task when you know it'll take two days.
It's always better to pick too few tasks for a sprint than it is to take too many. You can always grab more stuff off the project backlog if the sprint backlog runs out mid-sprint.
Raw value here refers to lack of statistical analysis.
It is specifically designed for interfacing with project-external stakeholders.
It works well for “project teams” in a large org for whom the project isn’t the primary business focus. e.g. an internal tool to assist with problem X, or a development project for an external entity.
There is no other use case for which scrum is a good fit - and it’s those mismatched experiences that always result in scrum hate.
I think people just got caught up in the cool name and the certifications and blah.
Stop using scrum for the wrong thing!
There is a well-defined standard process for them to add things to the backlog and there is a written down definition in which state items in the backlog have to be in so that they get picked up for the next sprint. If the team works with just one client/product, the client can prioritise the backlog.
During the sprint they can't give any input or request "just this one quick feature". The work is locked during the sprint. If they REALLY want something, the Agile Manifesto says to drop and delete all ongoing work and start a new sprint from scratch. Exactly zero clients have agreed to that - they really weren't in that much of a hurry with the feature.
After the sprint the client gets a demo of what the team achieved. An actual demo with the actual product. Not a powerpoint presentation of an ideal state or a video done in a demo environment. At this point the client can provide feedback and new features and we GOTO 10.
Usually a single member needs to be defined as a firefighter who takes on bugs and production issues that can't wait for the next sprint, but we don't tell that to the client. If there is no urgent work, they work on the sprint tasks as normal.
--
Kanban on the other hand works if the tasks have no dependencies with each other, like building maintenance or IT/DevOps type stuff.
"Install new laptop for Karen with standard package" doesn't require a sprint, anyone on the team can do it. Or "Set up AWS account with ECS for team B"
Do I need this protection? Why cannot I protect myself? Do I want this type of protection? Especially if it comes with all the negative downsides of Scrum.
Scrum is based on the imho often wrong assumption that a team needs "protection" of some sort. If your team consists of 16 year old youngsters only this might be true and this type of protection might be useful.
All this "protect the team from changing requirements mid-work" is nonsensical anyway, because no _really_ valuable work is done in 2 weeks. If the requirements _really_ changes you have to throw away the code for the old requirement. You can throw away 2 weeks of coding or 2 days. I'm pissed off more by 2 weeks of dead code. If the requirements adopts a bit its better to adopt early. And change in focus and priorities (which is _not_ a changing requirement): I'm happy to do so if I'm convinced it's for the good of the company and I'm happy to say "Sorry, this will have to wait until I'm done with what I'm currently doing. Please come back next Tuesday.".
Or do you enjoy explaining how project priorities work at length for the fifth time in two weeks? Do you enjoy sales just "quickly popping by" your desk to request "a small tiny feature I promised the client we'll have done by end of week".
This is why in Agile we have the Scrum Master who fields all requests like that and tells Marketdrone A to fight Marketdrone B on whose task is more important, because team only has enough time to complete either task on the next sprint. Every time someone tries to interfere with the team's work they firmly direct the person to the SM. In a few actual cases the team's SM has physically removed the over-eager middle manager out of the team's space with their "few quick requests and improvements".
I'd really want to know what kind of tasks can't be completed in two weeks in your opinion.
The tasks in a sprint aren't "build a house from scratch" -level, you split them until they're in manageable chunks of time. In a single sprint you might have the task of clearing the plot from any trees and laying down the markers for the house's base.
Then the client comes in and approves the direction or asks you to make the bathroom a bit bigger or move the house 5 meters to the east - which is still easy because the "house" is just stakes in the ground with string connecting them.
And again you pick 2 weeks of work you know your team can finish and the client checks that everything looks good. etc etc.
It really isn't complicated. I think the majority of HN has only been subjected to cargo-cult Agile or some kind of Agile-ish system where you just use the terms, but none of the actual processes.
If it's implemented well it's fantastic. You get to focus on the important stuff during the sprint. Issues tend to get caught early on because experienced team members chime in during planning poker. The whole team takes responsibility for the sprint together. This leads to lots of knowledge sharing and collaboration within the team.
Once the team velocity is predictable it also becomes much easier to ask for x amount of time per week for refactoring work as the impact to project timelines can be easily quantified.
You lost me there. This is the fundamental problem with Scrum; this type of paternalism where "programmer" is a synonym for "idiotic code monkey", borderline autistic who isn't capable of dealing with demand from the outside. And all programmers are the same, all organisations are the same and all type of development work is the same. Everywhere. If only we would be doing "Agile" right.
But this will happen from time to time. People writing tickets or even devs when checking the tickets don't read the related code. So you have a big and important source of uncertainty. Some things are technically constrained.
If stuff looks really vague, do a "planning" or "discovery" task on the issue first, where you dig through and maybe even prototype what you need to do.
But yes, requirements can change during a spring, but it should be very very rare and not a regular event.
This sentence alone reveals an incorrect understanding of scrum.
First, scrum does not "focus on getting estimations right". In fact, if you search through the scrum guide [0], you will not find any mention of estimates whatsoever.
Second, the purpose of a planning meeting is to identify what next to work on in order to add the most value to the product. Therefore, the meeting involves the product owner, who has the clearest understanding of the business value of the product at any given point, and the developers, who have the clearest understanding of what's going underneath the hood of the product. Their conversation informs both the developers of what's most valuable, and the product owner of what's doable.
Third, in the planning meeting developers, who are actually going to be doing the work, have an opportunity to decide how they are going to split the work, how they are going to collaborate on it, and whether there are any unsolved dependencies preventing them from taking the work into the next iteration.
How this can be dismissed as a waste of time is beyond me.
The reality is that it is quite difficult to break products down into separate features then work on those features separately and in order.
Because of this, it's very easy for planning meetings to accidentally become "What did we work on last week? Will this still be done on time?"
I think a lot of it is because Scrum as practiced is often not like you describe.
I actually prefer Kanban over Scrum, but none of this matches my experience at all.
1) People plan multiple sprints ahead in Scrum. Not necessarily the full sequence of tasks, but things like telling a stakeholder which sprint their task will be in.
2) Many people are in a situation that's inherently push-based and requires estimates. Scrum is just a way to achieve that. The author gets snarky in the first paragraph about choosing Scrum vs having it chosen for you, but really . . . most people know full well that Scrum was chosen for them, and that it was chosen for planning purposes. And that they do tasks because other people need them done, not because they had some free time. Heck, the whole project usually exists to serve the needs of others, not the joy of working fast.
3) Even in Kanban, we'll usually have basically the same grooming meeting. That's because the meat of that meeting is sharing information and thoughts about what the upcoming tasks involve and discussing whether and how to break them down into sub-tasks.
The most disruptive thing sabotaging this, all other things being positive, is typically manager turnover when they each have their own differing ideas on how, and whether, and what, to adhere to.
Hold your advice; doing anything about it is not at the pay grade of anyone who will be with the company for more than another six months. Unless… you leave the company. That is the one effective action you can take.
1. Communication and Funding - Does your VP know how they are spending money? How is that money allocated? This is why you have agile-fall or SAFE.
2. Planning - Can you deliver the solution your architect drew on the napkin? Does the PM know enough to schedule things.
3. Work handling in the team. This is the one that I think people most want to talk about, and anything that works for the team will work. You don't need anything fancy.
With that said. I think the drawbacks of scrum are just too many. It is inflexible. You have to sit in meetings to solve Scrum-problems instead of real problems.
Retrospectives are just magic though when you work with people that are great at agile software development. Ad hoc talks during daily work can never replace that. The velocity one can achieve by constantly improving and challenging the software developing process during dedicated sessions is just ridiculous. But it also have to do with having the right people. 2 hours of people whining about test environments will not accomplish anything.
Edit: Btw, problems with test environments is usually down to poor architecture and hard to solve. Design for testing too...
Judging by the perspective shared in this article, I'd say it's coming from a Team Lead / Lead Programmer role at a small company, where Kanban works great. Once you grow beyond a certain size, almost everyone switches to Scrum. Why? Because it reduces friction with other parts of the business, which want - nay - NEED to slice time up into manageable, trackable chunks. And this goes all the way to the CEO and investors. You may not like it, but it's a very real constraint on your choice here.
Scrum is for less predictable work, where many/most of the requirements and/or challenges are not well known or defined yet, or are likely to change as new information becomes available. For this kind of work, you need a constant feedback mechanism so that the captain can adjust course as needed while traversing uncharted waters.
I currently work in a team that builds code that accesses poorly or completely undocumented systems, and is seeking a market fit for new products. In both of these cases, agility is far more important than velocity, so scrum is the right approach. In previous places, the work my team did was very predictable, so kanban was the right approach.
Note: There's nothing wrong with having both in the same company. Team has predictable work? Kanban. Else scrum.
From my experience, the opposite is true: New things are discovered during sprints, but at that point it's already too late because that work item has already been estimated in the sprint planning (most of the time incorrectly). Also the arbitrary sprint deadlines don't help either.
Will it mess up the numbers? Absolutely, but only for that piece. And as a result of the change of plans being entered into the current sprint (with something perhaps bumped to make room, or maybe the work itself bumped to a later sprint to give more time to plan for the new challenges) you already have a new estimate. And you have a paper trail of what happened and how you dealt with it.
Your velocity goes down and you lose some predictability, but your agility goes up because you can adjust instantly to new challenges. None of these tools are a panacea; you have to thoughtfully decide which trade-offs will offer the greatest benefit for your particular project.
The "deadlines" shouldn't be thought of as hard deadlines. They're estimates of what you expect to have done at the end of some arbitrary period. Your accuracy in this should be measured statistically over time. If it turns out that you're consistently under or over, you adjust how you estimate. Ideally you want your estimates to average out to break-even over the course of a year. The point isn't to be able to determine exactly how much work you'll do, but rather to determine with a high degree of confidence (80%? 90%?) when the work will be done, with the understanding that it's not guaranteed (i.e. it's a point statistic). It's a planning tool, not a performance measure (the moment you treat it as a performance measure, it becomes useless due to the cobra effect).
Agile is for building new things, it's optimized for learning and navigating in a space you don't know about (say before/around PMF) - though most people do Scrum wrong, E.g with the roadmap-anti-pattern.
Lean is for optimizing a product, after PMF, E.g. when Scaling.
Waterfall and Six Sigma is when you do the same thing over an over again and you have a lot of knowledge in the space, when you outsource commodity development, E.g. customizing a CRM.
You don't need that process. You just need to do this process right.
And then fill that post with all of the obstacles that doing anything right entails.
What the article is saying is that bad scrum is much worse than no scrum - which is so so true. But good scrum is waaaay better than no scrum. Combine it with effective Kanban (eg. controlling WIP) and you're on your way to a very productive team.
I've found scrum works best with 1 week sprints. It forces ceremonies to be short.
But at thr end of the day the only important parts of Scrum are ensuring the standups are run ruthlessly short, no fat, and that the Retro produces actions that are actually done.
Because if you are running proper retros after 6 months "your" Scrum won't look like anyone else's Scrum as it will be customised to your work and team.
It seems most people who are complaining about Scrum, are really complaining about the lousy implementation of it in their company. Which tends to be the result of lousy management. With lousy management, any process will be a pain. Doing Kanban with a manager behind your desk asking why your feature is not ready yet isn't a pleasure either.
There also seems to be some misunderstanding about speed of development and Scrum; some posters are complaining that Scrum slows them down. Yes it does! And this is on purpose. Scrum focusses on delivering business value, not on delivering lines of code that possibly nobody needs. So there are moments in the development process when feedback is gathered from stake holders. This is important, because it gives them an opportunity to adjust what's being built, or even switch to a more important feature altogether. The downside is that this takes time. But the upside is that you will have far greater chance of delivering something that is actually needed.
It is agile that is at fault, not the average management on the average company.
If the average manager and dev won't be able to do it, then it is a lousy process.
The Agile manifesto should have been written in a similar style ...
If you don’t know exactly what you’re doing, for whom, by when, you fail to meet expectations by delivering the wrong thing by the wrong time.
There is design & estimation, planning, development, and evaluation phases. End of story. It doesn’t matter what you call those phases. If you don’t do design and estimation, you have no idea what you’re building or any metric for success. If you don’t do planning you have no schedule for delivering it.
“I’ll do this feature as defined by a two sentence ticket whenever I complete it” is incompetent and reckless. It’s idiotic. I’ve seen many companies operate this way, and they are constantly delivering the wrong thing by the wrong time (particularly VC-backed startups).
It takes 10 minutes to learn, but a lifetime to master.
Kanban afaik just describes having a swim lane task board. The process for managing that board is left as an exercise to the reader.