by lightedman · 3y ago · 0 comments
Most anyone in an industrial work setting in North America will have 3-phase 240V service installed, minimum. My work has 480V 3-phase for our SMT line. We have permanently-installed charge stations on that 3-phase service. Damn shame they've got nothing for my e-bike, so I just use the benchtop inside and a cable rig.
Are all three phases even being sent to the electric cars? The J1772 only supports a single phase.
I suppose this means one leg of the circuit is not used, meaning the load between the different legs is always going to be out of balance, but this practice (use 2 legs of a 3 phase feed for "240 er... 208v" for "big" loads such as a drier or EVSE or water heater, so likely any industrial / commercial setting just accepts that you're not going to load up all legs your feeds evenly.
NA built EVs typically don't have the internal circuitry to manage 3 phase charging -- the EV takes care of the AC -> DC conversion on a level 2 circuit, and the extra stuff to do that in NA wouldn't ever be used. The same is true of charging off of 400v AC -- it's super rare and likely not something that's worth engineering to implement.